The Registry
Every data center in the public record
One profile per site: what is being built, by whom, on how much power and water, with what public money, and how the town has taken it. Every figure traces to a permit, a filing, a utility agreement, or a named news report. Where a fact was looked for and not found, the profile says so. A blank is never a zero.
- 1,576
- sites
- 391
- proposed
- 109
- permitted
- 241
- under construction
- 745
- operating
- 355
- contested, opposed, or in court
- 318.2 GW
- planned
Every operator and its sites · All 355 contested sites · 90 cancelled projects · Download the data (CSV, JSON)
Facility data from Compute Atlas version 1.32.0 (September 7, 2026), CC BY 4.0, joined to our case reporting. Updated September 14, 2026.
Where the fights are
The largest sites with documented opposition or litigation on record.
- Stratos AI Data Center Campus
Lucin, UT · O'Leary Digital · 9 GW planned
ProposedContested - PowerHouse Caldwell County Data Center
Uhland, TX · PowerHouse Data Centers · 4 GW planned
ProposedContested - Project Merlin (Helios II)
McGregor, TX · Galaxy Digital · 3.5 GW planned
ProposedContested - Project Camellia (OpenAI Effingham County Campus)
Rincon, GA · OpenAI · 3.2 GW planned
ProposedIn litigation - TECfusions Keystone Connect
Upper Burrell Township, PA · TECfusions · 3 GW planned
ProposedIn litigation - AWS Hobart Campus
Hobart, IN · Amazon Web Services · 2.4 GW planned
Under constructionContested - Amazon Project Rainier
New Carlisle, IN · Amazon Web Services · 2.2 GW planned
OperatingContested - Comanche Circle
Tolar, TX · Sailfish Digital Ventures (SDV) · 2 GW planned
ProposedContested - Granite Renewables Logan County Data Center Campus
Sterling, CO · Granite Renewables · 2 GW planned
ProposedContested - Meta Hyperion
Delhi vicinity, LA · Meta · 2 GW planned
Under constructionContested - Monarch Compute Campus
Point Pleasant, WV · Nscale · 2 GW planned
Under constructionContested - xAI Southaven
Southaven, MS · xAI · 2 GW planned
OperatingIn litigation
By state
Sorted within each state by reception, most contested first, then by size. Sites without a profile yet are listed for completeness and get one as the record grows.
Alabama
18 sites · 6 contested
- Nebius Birmingham AI Factory (BHM01)Birmingham, Jefferson Co. · Nebius GroupUnder construction300 MWIn litigation
- Project Red ClayLowndes Co. · Cloverleaf InfrastructureProposed1.5 GWOpposed
- Sovereign Gazelle Bitcoin Mining Data CenterSomerville, Morgan Co. · Sovereign GazelleProposed50 MWOpposed
- QTS Bessemer (Project Marvel)Bessemer, Jefferson Co. · QTS Data CentersProposed1.2 GWContested
- Digi Power X Columbiana AI Data CenterColumbiana, Shelby Co. · Digi Power XUnder construction40 MWContested
- Patmos Fairfield Colocation Data CenterFairfield, Jefferson Co. · PatmosProposedContested
- Edged Prichard Data Center (Project Gateway)Prichard, Mobile Co. · Edged USProposed8 MWMixed reception
- Core Scientific Auburn Data Center (AUBix)Auburn, Lee Co. · Core ScientificUnder construction16 MWSupported
- Google Jackson County CampusStevenson, Jackson Co. · GoogleOperatingSupported
- Meta Huntsville Data Center CampusHuntsville, Madison Co. · MetaOperatingSupported
- Meta Montgomery Data CenterMontgomery, Montgomery Co. · MetaUnder constructionSupported
- DC BLOX Birmingham Data Center CampusBirmingham, Jefferson Co. · DC BLOXOperating60 MW
- DC BLOX Montgomery Data CenterMontgomery, Montgomery Co. · DC BLOXProposed40 MW
- DC BLOX Huntsville Data CenterHuntsville, Madison Co. · DC BLOXOperating13.5 MW
- Calvert Infrastructure HubCalvert, Mobile Co. · Beacon Data CentersProposed
- Simple Helix Data CenterHuntsville, Madison Co. · Simple Helix, LLCOperating
- University of Alabama High Performance Computing and Data CenterTuscaloosa, Tuscaloosa Co. · University of AlabamaUnder construction
- Western Hospitality Childersburg CampusChildersburg, Talladega Co. · Western Hospitality PartnersProposed
Alaska
4 sites · 0 contested
- Stak Energy North Slope Data CenterNorth Slope Co. · Stak EnergyProposed3 GWMixed reception
- Endicott Bitcoin Mining PilotNorth Slope Co. · TA InfrastructureProposed1.4 MW
- Alaska Communications Data CenterAnchorage · Alaska CommunicationsOperating
- GCI Anchorage Data CenterAnchorage · GCIOperating
Arizona
45 sites · 9 contested
- Project BluePima Co. · Beale InfrastructureUnder construction600 MWOpposed
- Energy Generation and Technology CampusMaricopa, Pinal Co. · W HoldingsProposedOpposed
- La Osa Data Center ParkEloy, Pinal Co. · Vermaland LLCCancelledOpposed
- Hassayampa Ranch Data CenterTonopah, Maricopa Co. · Arizona Land ConsultingProposed1.5 GWContested
- Luckett Road Data Centers (Fremont Peak Properties)Marana, Pima Co. · Fremont Peak Properties LLC (Beale Infrastructure)Proposed1.5 GWContested
- Project BaccaraMaricopa Co. · Takanock, LLCPermitted700 MWContested
- Project Midway Data CenterCasa Grande, Pinal Co. · LPI GroupProposed400 MWContested
- NTT Global Data Centers Mesa, Pacific Proving Technology ParkMesa, Maricopa Co. · NTT Global Data CentersProposed360 MWContested
- Project RangeBuckeye, Maricopa Co. · TractProposedContested
- Buckeye Tech CorridorBuckeye, Maricopa Co. · TractPermitted1.8 GWSupported
- EdgeCore Mesa Data Center CampusMesa, Maricopa Co. · EdgeCore Digital InfrastructureOperating450 MWSupported
- Google Redhawk Mesa Data Center CampusMesa, Maricopa Co. · GoogleOperating400 MWSupported
- Avondale CampusAvondale, Maricopa Co. · Prime Data CentersUnder construction240 MWSupported
- Aligned PHX-13Glendale, Maricopa Co. · Aligned Data CentersUnder construction72 MWSupported
- Microsoft El Mirage Data Center CampusEl Mirage, Maricopa Co. · MicrosoftOperatingSupported
- Compass Datacenters Goodyear CampusGoodyear, Maricopa Co. · Compass DatacentersOperating350 MW
- Novva Mesa Data Center CampusMesa, Maricopa Co. · Novva Data CentersUnder construction300 MW
- Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus)Goodyear, Maricopa Co. · Stream Data CentersOperating280 MW
- STACK Infrastructure PHX02 CampusPhoenix, Maricopa Co. · STACK InfrastructureUnder construction250 MW
- STACK Infrastructure PHX01 CampusAvondale, Maricopa Co. · STACK InfrastructureOperating225 MW
- QTS Phoenix 2Phoenix, Maricopa Co. · QTS Data CentersOperating210 MW
- Vantage Phoenix Campus (Goodyear, AZ)Goodyear, Maricopa Co. · Vantage Data CentersOperating176 MW
- Meta Mesa Data CenterMesa, Maricopa Co. · MetaOperating50 MW
- phoenixNAP PHX02Phoenix, Maricopa Co. · phoenixNAPUnder construction50 MW
- Edged Mesa Data CenterMesa, Maricopa Co. · Edged USOperating36 MW
- NTT Phoenix PH1 Data CenterMesa, Maricopa Co. · NTT Global Data CentersOperating36 MW
- Digital Realty PHX (Tempe)Tempe, Maricopa Co. · Digital RealtyOperating33.8 MW
- H5 Data Centers Phoenix (Chandler)Chandler, Maricopa Co. · H5 Data CentersOperating26 MW
- Centersquare PHX3Mesa, Maricopa Co. · Centersquare (Cyxtera/Evoque)Operating17.3 MW
- Iron Mountain AZS-1Scottsdale, Maricopa Co. · Iron MountainOperating5.8 MW
- Flexential Phoenix - Deer ValleyPhoenix, Maricopa Co. · FlexentialOperating5.02 MW
- 491st Avenue and Thomas Road Data Center / Solar SiteTonopah, Maricopa Co. · Grandilla (Arizona) Inc. and Foot Creek CorporationPermitted
- Aligned PHX-01/02/03Phoenix, Maricopa Co. · Aligned Data CentersOperating
- Apple Mesa Data Center (Global Command Center)Mesa, Maricopa Co. · AppleOperating
- Arizona Independent Technology CampusPinal Co. · Zinke Investments LLCProposed
- AWS Laveen Data Center CampusLaveen, Maricopa Co. · Amazon Web ServicesProposed
- Camelback CreekTonopah, Maricopa Co. · Arizona Land ConsultingProposed
- Digital Realty PHX15Chandler, Maricopa Co. · Digital RealtyOperating
- EdgeConneX Mesa Campus (PHX11 / 3302 S Hawes Rd)Mesa, Maricopa Co. · EdgeConneXUnder construction
- Iron Mountain AZP-1Phoenix, Maricopa Co. · Iron MountainOperating
- Iron Mountain AZP-2Phoenix, Maricopa Co. · Iron MountainOperating
- Lumen Phoenix 1Phoenix, Maricopa Co. · Lumen TechnologiesOperating
- Microsoft Goodyear Data Center CampusGoodyear, Maricopa Co. · MicrosoftOperating
- QTS Phoenix 4Tolleson, Maricopa Co. · QTS Data CentersUnder construction
- Wintersburg 313Tonopah, Maricopa Co. · 313 Wintersburg LLC and Wintersburg Four LLCProposed
Arkansas
13 sites · 8 contested
- Jones Eagle Bitcoin MineDeWitt, Arkansas Co. · Jones Eagle LLCOperatingIn litigation
- NewRays One Bitcoin MineBono, Faulkner Co. · NewRays One LLCOperatingIn litigation
- Artemis Technologies Cave City Bitcoin Data CenterCave City, Sharp Co. · Artemis TechnologiesUnder constructionOpposed
- Green Digital Harrison Mine (proposed, withdrawn)Harrison, Boone Co. · Green Digital LLCCancelledOpposed
- Interstate Holdings Blockchain Vilonia Mine (proposed, denied)Vilonia, Faulkner Co. · Interstate Holdings BlockchainCancelledOpposed
- AVAIO Digital Leo CampusPulaski Co. · AVAIO Digital PartnersProposed1 GWContested
- GMI Computing Mountain Pine Bitcoin MineMountain Pine, Garland Co. · GMI Computing (General Mint Inc.)OperatingContested
- Interstate Holdings Blockchain Cabot MineCabot, Lonoke Co. · Interstate Holdings BlockchainOperatingContested
- Google West Memphis Data Center CampusWest Memphis, Crittenden Co. · GoogleUnder constructionSupported
- ImmersionBTC Walnut Ridge MineWalnut Ridge, Lawrence Co. · ImmersionBTCOperatingSupported
- Port of Little Rock Data CenterLittle Rock, Pulaski Co. · GoogleUnder construction
- TierPoint Little RockLittle Rock, Pulaski Co. · TierPointOperating
- Walmart Bentonville Data CenterBentonville, Benton Co. · WalmartOperating
California
83 sites · 8 contested
- Imperial Valley Computer Manufacturing AI Data CenterImperial, Imperial Co. · Imperial Valley Computer Manufacturing (IVCM)Proposed330 MWIn litigation
- Coachella Valley Technology CampusCoachella, Riverside Co. · Stronghold Power SystemsCancelledOpposed
- DigiCo LAX1 (1977 Saturn Street)Monterey Park, Los Angeles Co. · DigiCo Infrastructure REITCancelledOpposed
- CyrusOne AI Data Center at NAS LemooreKings Co. · CyrusOneProposed100 MWContested
- AVAIO Digital PerseusPittsburg, Contra Costa Co. · AVAIO Digital PartnersPermitted99 MWContested
- Amazon AWS Gilroy Data CenterGilroy, Santa Clara Co. · Amazon Web ServicesUnder construction98 MWContested
- STACK SVY03AHayward, Alameda Co. · STACK InfrastructurePermitted67.2 MWContested
- Solano County Fairgrounds Data Center (Global Stack proposal)Vallejo, Solano Co. · Global Stack LLCProposedContested
- Golden Valley Technology HubElk Hills, Kern Co. · Beacon Data Centers (w/ California Resources Corp)Proposed275 MWMixed reception
- RB Inyokern Data CenterInyokern, Kern Co. · R&L Capital, Inc.Proposed99 MWMixed reception
- CoreSite Bowers Data CenterSanta Clara, Santa Clara Co. · CoreSitePermitted72 MWMixed reception
- Prologis STEM ParkSan Jose, Santa Clara Co. · PrologisProposed396 MWSupported
- Prologis 5853 Rue FerrariSan Jose, Santa Clara Co. · PrologisPermitted49 MWSupported
- NorthPoint Fairfield Data Center (Vanden Road Industrial Campus)Fairfield, Solano Co. · NorthPoint DevelopmentProposed150 MW
- STACK SVY01San Jose, Santa Clara Co. · STACK InfrastructureOperating100 MW
- Prologis Silver Creek Valley Road Data CenterSan Jose, Santa Clara Co. · PrologisProposed99 MW
- Valley Oak Partners Shinn Street Data CenterFremont, Alameda Co. · Valley Oak PartnersProposed90 MW
- Vantage Santa Clara I (CA1)Santa Clara, Santa Clara Co. · Vantage Data CentersOperating77 MW
- Vantage Santa Clara II (CA2)Santa Clara, Santa Clara Co. · Vantage Data CentersOperating75 MW
- Vantage Santa Clara III (CA3)Santa Clara, Santa Clara Co. · Vantage Data CentersOperating64 MW
- T5@Silicon ValleyNewark, Alameda Co. · T5 Data CentersOperating49.1 MW
- Microsoft Alviso Data Center CampusSan Jose (Alviso), Santa Clara Co. · MicrosoftUnder construction48 MW
- STACK SVY02Santa Clara, Santa Clara Co. · STACK InfrastructureOperating48 MW
- Csquare SFO2Santa Clara, Santa Clara Co. · CsquareOperating43.2 MW
- Csquare SFO4Santa Clara, Santa Clara Co. · CsquareOperating43.1 MW
- ECL CSC-1 FlexGrid AI Data CenterSanta Clara, Santa Clara Co. · ECLProposed35 MW
- Csquare SFO1Santa Clara, Santa Clara Co. · CsquareOperating34.5 MW
- Prime Data Centers LAX01Vernon, Los Angeles Co. · Prime Data CentersOperating33 MW
- Digital Realty Vernon Data CenterVernon, Los Angeles Co. · Digital RealtyProposed32 MW
- Vernon LA Campus (with Goodman Group)Vernon, Los Angeles Co. · DataBankProposed32 MW
- Centersquare LAX3Irvine, Orange Co. · Centersquare (Cyxtera/Evoque)Operating24.9 MW
- ScaleMatrix San DiegoSan Diego, San Diego Co. · ScaleMatrixOperating20 MW
- Prime Data Centers SMF02Sacramento, Sacramento Co. · Prime Data CentersUnder construction18 MW
- Centersquare LAX5Irvine, Orange Co. · Centersquare (Cyxtera/Evoque)Operating17.3 MW
- Serverfarm LAX1El Segundo, Los Angeles Co. · ServerfarmOperating17.3 MW
- NTT Silicon Valley SV1 Data CenterSanta Clara, Santa Clara Co. · NTT Global Data CentersOperating16 MW
- NTT Sacramento CA1 Data CenterSacramento, Sacramento Co. · NTT Global Data CentersOperating12.6 MW
- Cologix SV1Santa Clara, Santa Clara Co. · CologixOperating9 MW
- Csquare SFO3Sunnyvale, Santa Clara Co. · CsquareOperating8.6 MW
- DataBank SNA2Irvine, Orange Co. · DataBankOperating8 MW
- QTS Santa Clara 1Santa Clara, Santa Clara Co. · QTS Data CentersOperating7.5 MW
- Lumen Sunnyvale 1Sunnyvale, Santa Clara Co. · Lumen TechnologiesOperating6 MW
- AT&T Redwood City Data CenterRedwood City, San Mateo Co. · AT&TOperating4 MW
- QTS SacramentoSacramento, Sacramento Co. · QTS Data CentersOperating4 MW
- DataBank San Diego SAN1San Diego, San Diego Co. · DataBankOperating3.2 MW
- DataBank SNA1Irvine, Orange Co. · DataBankOperating2.64 MW
- CalEthos Lithium Valley Data Center CampusEl Centro, Imperial Co. · CalEthos, Inc.Proposed
- Colocation America SFDC1 (200 Paul Avenue)San Francisco, San Francisco Co. · Colocation AmericaOperating
- CoreSite LA1 (One Wilshire)Los Angeles, Los Angeles Co. · CoreSiteOperating
- CoreSite LA2 - Los Angeles, CALos Angeles, Los Angeles Co. · CoreSiteOperating
- CoreSite SV1 - San Jose, CASan Jose, Santa Clara Co. · CoreSiteOperating
- Digital Realty 727 S. Grand Avenue (DTLA)Los Angeles, Los Angeles Co. · Digital RealtyProposed
- Digital Realty LAX12El Segundo, Los Angeles Co. · Digital RealtyOperating
- Digital Realty OAK10Oakland, Alameda Co. · Digital RealtyOperating
- Digital Realty SC1Santa Clara, Santa Clara Co. · Digital RealtyOperating
- Digital Realty SFO10San Francisco, San Francisco Co. · Digital RealtyOperating
- Digital Realty SFO12 (365 Main Street)San Francisco, San Francisco Co. · Digital RealtyOperating
- Digital Realty Silicon Valley SJC10Santa Clara, Santa Clara Co. · Digital RealtyOperating
- Digital Realty Silicon Valley SJC11Santa Clara, Santa Clara Co. · Digital RealtyOperating
- Digital Realty Silicon Valley SJC16Santa Clara, Santa Clara Co. · Digital RealtyOperating
- Digital Realty Silicon Valley SJC30Santa Clara, Santa Clara Co. · Digital RealtyOperating
- Digital Realty Silicon Valley SJC31Santa Clara, Santa Clara Co. · Digital RealtyOperating
- Digital Realty SJC34Santa Clara, Santa Clara Co. · Digital RealtyOperating
- Eagle Mountain Data OC1 (Anaheim Data Center)Anaheim, Orange Co. · Eagle Mountain Data IncOperating
- EdgeConneX SAC01Rancho Cordova, Sacramento Co. · EdgeConneXOperating
- EdgeConneX SDG01San Diego, San Diego Co. · EdgeConneXOperating
- Equinix LA3El Segundo, Los Angeles Co. · EquinixOperating
- Equinix LA4El Segundo, Los Angeles Co. · EquinixOperating
- Equinix SV1San Jose, Santa Clara Co. · EquinixOperating
- Equinix SV15Santa Clara, Santa Clara Co. · EquinixOperating
- Equinix SV2Santa Clara, Santa Clara Co. · EquinixOperating
- Equinix SV4Sunnyvale, Santa Clara Co. · EquinixOperating
- Equinix SV8Palo Alto, Santa Clara Co. · EquinixOperating
- Grand Crossing South - Building 10City of Industry, Los Angeles Co. · RaedenProposed
- Lumen Santa Clara 1Santa Clara, Santa Clara Co. · Lumen TechnologiesOperating
- MDC SDG1San Diego, San Diego Co. · MDC Data CentersOperating
- MDC SDG2San Diego, San Diego Co. · MDC Data CentersOperating
- NTT Sacramento CA2 Data CenterSacramento, Sacramento Co. · NTT Global Data CentersOperating
- NTT Sacramento CA3 Data CenterSacramento, Sacramento Co. · NTT Global Data CentersOperating
- One Data Center America (Ontario Campus)Ontario, San Bernardino Co. · One Data Center America, LLCOperating
- Prime Santa Clara (Silicon Valley campus)Santa Clara, Santa Clara Co. · Prime Data CentersOperating
- Quest Roseville HABCRoseville, Placer Co. · Quest Technology ManagementOperating
- Terra Data CenterSan Jose, Santa Clara Co. · Terra VenturesProposed
Colorado
24 sites · 6 contested
- Granite Renewables Logan County Data Center CampusSterling, Logan Co. · Granite RenewablesProposed2 GWContested
- CoreSite DE3Denver, Denver Co. · CoreSiteUnder construction60 MWContested
- Raeden Project TaurusColorado Springs, El Paso Co. · RaedenPermitted50 MWContested
- Global AI Windsor Data Center (former Kodak/Carestream campus)Windsor, Weld Co. · Global AIUnder construction27.5 MWContested
- BluSky AI Walsenburg (Indian Pool Ranch) Modular Data CenterWalsenburg, Huerfano Co. · BluSky AI Inc.Proposed15 MWContested
- Crusoe Energy Digital Flare Mitigation, Oxbow Well PadWalden, Jackson Co. · NYDIG DFMOperatingContested
- QTS Aurora-Denver Data Center Campus (DEN1)Aurora, Arapahoe Co. · QTS Data CentersUnder construction177 MWMixed reception
- Flexential Parker (Compark)Parker, Douglas Co. · FlexentialUnder construction22.5 MWSupported
- Novva Colorado Springs Data CenterColorado Springs, El Paso Co. · Novva Data CentersOperating40 MW
- Flexential Denver - EnglewoodEnglewood, Arapahoe Co. · FlexentialOperating18 MW
- H5 Data Centers Denver (Denver Tech Center campus)Greenwood Village, Arapahoe Co. · H5 Data CentersOperating17.5 MW
- DataBank DEN5, Centennial IICentennial, Arapahoe Co. · DataBankOperating16 MW
- Iron Mountain DEN-1 Denver Data CenterDenver, Denver Co. · Iron Mountain Data CentersOperating14.4 MW
- QTS Colorado Springs Data CenterColorado Springs, El Paso Co. · QTS Data CentersOperating14 MW
- Aspen Creek Digital, Olathe Solar Bitcoin MineOlathe, Montrose Co. · Aspen Creek Digital CorporationOperating6 MW
- DataBank DEN2, CentennialCentennial, Arapahoe Co. · DataBankOperating4 MW
- EdgeConneX DEN01 DenverEnglewood, Douglas Co. · EdgeConneXOperating3 MW
- Honda Data Center (1601 Dry Creek Drive)Longmont, Boulder Co. · HondaOperating1.6 MW
- Flexential Denver - Aurora (DEN03)Aurora, Arapahoe Co. · FlexentialOperating
- Flexential Denver - Centennial (DEN05)Centennial, Arapahoe Co. · FlexentialOperating
- Flexential Denver - Downtown (Champa)Denver, Denver Co. · FlexentialOperating
- Prometheus Hyperscale Fort MorganFort Morgan, Morgan Co. · Prometheus HyperscaleProposed
- Prometheus Hyperscale PuebloPueblo, Pueblo Co. · Prometheus HyperscaleProposed
- Vantage Data Centers CO21 Campus (Building 3)Aurora, Adams Co. · Vantage Data CentersProposed
Connecticut
4 sites · 1 contested
- NE Edge Millstone Nuclear Data CenterWaterford, New London Co. · NE EdgeCancelled300 MWOpposed
- CogNovum Data Center (80 Merritt Boulevard)Trumbull · CogNovumOperating
- CyrusOne NYM5 (Norwalk)Norwalk, Fairfield Co. · CyrusOneOperating
- TierPoint WaterburyWaterbury · TierPointOperating
Delaware
5 sites · 5 contested
- Project Washington (Starwood Digital Ventures)Delaware City, New Castle Co. · Starwood Digital VenturesProposed1.2 GWIn litigation
- Harrington Data Center Proposal (Maguire Hayden)Harrington, Kent Co. · Maguire HaydenCancelled24 MWOpposed
- STAR Campus Data Center & Cogeneration Plant (The Data Centers, LLC)Newark, New Castle Co. · The Data Centers, LLCCancelledOpposed
- St. Georges Business Park & Lighthouse FarmsSt. Georges, New Castle Co. · Parkway Gravel Inc.Proposed300 MWContested
- White Clay Corporate Center Data Center RedevelopmentNewark, New Castle Co. · ShelbourneProposedContested
Florida
28 sites · 8 contested
- Holder Industrial Park Data Center Expansion (withdrawn)Lecanto, Citrus Co. · Deltona CorporationCancelledOpposed
- Project SwanLakeland, Polk Co. · Ryan Companies (end operator TBD)CancelledOpposed
- Florida Ecopark AI Data Center CampusFort Meade, Polk Co. · Stonebridge (via Florida Ecopark LLC; end tenant undisclosed)Proposed1.2 GWContested
- Cielo Haines City Data CenterHaines City, Polk Co. · Cielo Digital InfrastructureProposed300 MWContested
- NextNRG Nassau County Data Center & Energy CampusNassau Co. · NextNRGProposed200 MWContested
- Iron Mountain MIA-1Westview, Miami-Dade Co. · Iron MountainUnder construction16 MWContested
- HostDime Orlando Tier IV Data CenterEatonville, Orange Co. · HostDimeUnder constructionContested
- Project Tango AI Data Center CampusLoxahatchee, Palm Beach Co. · PBA Holdings (end tenant undisclosed)CancelledContested
- Atlas Compute AI Data Center CampusFort Pierce, St. Lucie Co. · Atlas Compute (infrastructure by Penguin Solutions)Proposed240 MW
- Metrobloks MIA-A1 (MB01)Miami, Miami-Dade Co. · MetrobloksProposed15.2 MW
- Redivider Homestead Bitcoin Mining FacilityHomestead, Miami-Dade Co. · Redivider Blockchain (joint venture with Esperanza Opportunity Fund)Proposed10 MW
- RadiusDC Miami ISweetwater, Miami-Dade Co. · RadiusDCOperating9.2 MW
- ColoCSX (CSX Data Center)Jacksonville, Duval Co. · ColoCSX (CSX Transportation)Operating6 MW
- AceHost Marion Mining FacilityTampa, Hillsborough Co. · AceHostOperating3 MW
- QTS Miami (MIA1)Sweetwater, Miami-Dade Co. · QTS Data CentersOperating2 MW
- Cologix JAX1Jacksonville, Duval Co. · CologixOperating
- CoreSite OR1, OrlandoOrlando, Orange Co. · CoreSiteOperating
- Digital Realty MIA10Miami, Miami-Dade Co. · Digital RealtyOperating
- Equinix MI1 (NAP of the Americas)Miami, Miami-Dade Co. · EquinixOperating
- Flexential Fort Lauderdale (FLL01/02)Fort Lauderdale, Broward Co. · FlexentialOperating
- Flexential JacksonvilleJacksonville, Duval Co. · FlexentialOperating
- Flexential Tampa - North (TPA03)Tampa, Hillsborough Co. · FlexentialOperating
- Flexential Tampa - WestTampa, Hillsborough Co. · FlexentialOperating
- Okee-One Data Center CampusOkeechobee, Okeechobee Co. · Indian River State CollegeCancelled
- Sentinel Grove Technology Park (Project Jarvis)Fort Pierce, St. Lucie Co. · Undisclosed developer (marketed as 'Sentinel Grove Technology Park', county code-named 'Project Jarvis')Cancelled
- TierPoint Jacksonville Data CenterJacksonville, Duval Co. · TierPointOperating
- US Development Yeehaw Junction Data Center CampusYeehaw Junction, Osceola Co. · US Development (end tenant undisclosed)Proposed
- Willow Lakes Data Center (West Midway Road)Fort Pierce, St. Lucie Co. · Willow Lakes LLC (end operator undisclosed)Proposed
Georgia
68 sites · 20 contested
- Project Camellia (OpenAI Effingham County Campus)Rincon, Effingham Co. · OpenAIProposed3.2 GWIn litigation
- Project Sail, Prologis Data Center CampusNewnan, Coweta Co. · PrologisPermitted900 MWIn litigation
- Meta Newton Data Center (Stanton Springs)Social Circle, Newton Co. · Meta PlatformsOperatingIn litigation
- Wallace Jackson Data Center CampusGriffin, Spalding Co. · Wallace Jackson, LLC (developer; end user undisclosed)PermittedIn litigation
- White Oak Technology ParkAppling, Columbia Co. · Trammell Crow Company (CBRE subsidiary)PermittedIn litigation
- Lovejoy Data Center Campus (Stillwater Development)Lovejoy, Clayton Co. · Stillwater DevelopmentCancelled1.3 GWOpposed
- Project Ruby (Upatoi Data Center Campus)Columbus, Muscogee Co. · Undisclosed end user (site pursued by Choose Columbus / Development Authority of Columbus)Proposed600 MWOpposed
- Coosa Data Center (Project Gracie)Rome, Floyd Co. · Atlas Development LLCPermittedOpposed
- Liberty Road Data Center Campus (EdgeConneX)Villa Rica, Douglas Co. · EdgeConneX (applicant East Village Dothan LLC)CancelledOpposed
- LN Energy Blackshear Bitcoin MineBlackshear, Pierce Co. · LN EnergyCancelledOpposed
- Project Bus (Atlas Development Temple Data Center Campus)Temple, Carroll Co. · Atlas Development LLCProposedOpposed
- Project Oak Data Center (Walt Sanders Road)Newnan, Coweta Co. · Undisclosed developerCancelledOpposed
- Project Peach (CyrusOne Palmetto Data Center Campus)Palmetto, Coweta Co. · CyrusOne (joint venture with North Coweta Investors)PermittedOpposed
- Microsoft Fairwater Atlanta (Azure AI Superfactory)Fayetteville, Fayette Co. · MicrosoftOperating1.5 GWContested
- Microsoft Tyrone Campus (Project Rita)Tyrone, Fayette Co. · MicrosoftPermitted96 MWContested
- 1155 Powers Ferry Place Data Center (Prime Storage conversion)Marietta, Cobb Co. · Prime Storage (Prime Group Holdings), end user undisclosedPermitted18 MWContested
- Northern Data Maysville Data CenterMaysville, Jackson Co. · Northern Data GroupPermittedContested
- QTS Project EisenhowerAugusta, Richmond Co. · QTS Data CentersUnder constructionContested
- Serverfarm Covington Data Center (Hazelbrand Road)Covington, Newton Co. · ServerfarmUnder constructionContested
- Social Circle Technology ParkSocial Circle, Newton Co. · TPA Group (developer; end tenant undisclosed)ProposedContested
- QTS Project Blue HoleBlakely, Early Co. · QTS Data CentersPermitted1 GWMixed reception
- DC BLOX Atlanta East Hyperscale Data Center CampusConyers, Rockdale Co. · DC BLOXUnder construction216 MWMixed reception
- DC BLOX Atlanta West (ATL1)Lithia Springs, Douglas Co. · DC BLOXUnder construction120 MWMixed reception
- CoreWeave Dalton II / Core Scientific Old Tilton Road Data CenterDalton, Whitfield Co. · Core ScientificUnder constructionMixed reception
- Microsoft Douglasville Data Center CampusDouglasville, Douglas Co. · MicrosoftUnder constructionMixed reception
- Project Bunkhouse (Taurus/Digital Realty Data Center Campus)Stilesboro, Bartow Co. · Taurus Investment Holdings (Taurus DC SPE LLC); to be managed by Digital RealtyPermitted1.8 GWSupported
- Microsoft Data Center Campus, Rome, GARome, Floyd Co. · MicrosoftPermittedSupported
- Project West (Troup County Data Center Campus)LaGrange, Troup Co. · Undisclosed data center developer (landowner Joshua Harrelson)Proposed600 MW
- Project Springbank (Atlas Development Bartow County Campus)Adairsville, Bartow Co. · Atlas Development LLCProposed432 MW
- T5 @ Atlanta IVPalmetto, Fulton Co. · T5 Data CentersProposed300 MW
- QTS Atlanta 1 (Atlanta-Metro DC1)Atlanta, Fulton Co. · QTS Data CentersOperating278 MW
- DataBank Project IndoCartersville, Bartow Co. · DataBankProposed200 MW
- TA Realty East Tanners Church Road Data CenterEllenwood, Clayton Co. · TA RealtyPermitted180 MW
- Edged Atlanta (ATL01)Atlanta, Fulton Co. · Edged Energy (Endeavour)Operating168 MW
- Kingston Technology Hub (Thor Equities)Kingston, Bartow Co. · Thor EquitiesProposed150 MW
- CleanSpark Washington Bitcoin Mining FacilityWashington, Wilkes Co. · CleanSpark, Inc.Operating86 MW
- Cango GreenVolt Soperton FacilitySoperton, Treutlen Co. · Cango Inc. (GreenVolt Technology LLC)Operating50 MW
- CleanSpark College Park Bitcoin Mining FacilityCollege Park, Fulton Co. · CleanSpark, Inc.Operating50 MW
- Flexential Atlanta - Douglasville 1Douglasville, Douglas Co. · FlexentialOperating22.5 MW
- CleanSpark Norcross Bitcoin Mining FacilityNorcross, Gwinnett Co. · CleanSpark, Inc.Operating20 MW
- STACK ATL01 (formerly T5@Atlanta)Alpharetta, Fulton Co. · STACK InfrastructureOperating20 MW
- LN Compute Cuthbert Bitcoin MineCuthbert, Randolph Co. · LN Compute Inc.Operating7 MW
- Aligned Data Centers ATL-01Lithia Springs, Douglas Co. · Aligned Data CentersOperating
- AWS Butts County Data Center CampusJackson, Butts Co. · Amazon Web ServicesProposed
- Bells Ferry Road Data Center (MMM Acquisitions)Marietta, Cobb Co. · MMM Acquisitions LLC (developer; end user undisclosed)Permitted
- Bridgeport Data Center CampusMoreland, Coweta Co. · Undisclosed developer (Bridgeport Industrial Park)Proposed
- Burkhalter Road Data Center (4AM Development)Statesboro, Bulloch Co. · 4AM Development, LLC (developer; operator undisclosed)Proposed
- CleanSpark Dalton Bitcoin Mining FacilityDalton, Whitfield Co. · CleanSpark, Inc.Operating
- CleanSpark LaFayette Bitcoin Mining FacilityLaFayette, Walker Co. · CleanSpark, Inc.Operating
- CleanSpark Sandersville Bitcoin Mining FacilitySandersville, Washington Co. · CleanSpark, Inc.Operating
- CleanSpark Twin City Bitcoin Mining FacilityTwin City, Emanuel Co. · CleanSpark, Inc.Operating
- CoreSite AT1 - Atlanta, GAAtlanta, Fulton Co. · CoreSiteOperating
- CoreSite AT2 - Marietta Data CenterMarietta, Cobb Co. · CoreSiteOperating
- Digital Realty ATL11Austell, Cobb Co. · Digital RealtyOperating
- Digital Realty Atlanta ATL13Atlanta, Fulton Co. · Digital RealtyOperating
- Flexential Atlanta - Alpharetta Data CenterAlpharetta, Fulton Co. · FlexentialOperating
- Flexential Atlanta - Douglasville 2Douglasville, Douglas Co. · FlexentialOperating
- Flexential Atlanta - Norcross (ATL01/02)Norcross, Gwinnett Co. · FlexentialOperating
- Google Douglasville Data CenterDouglasville, Douglas Co. · GoogleOperating
- Google Evans Data CenterEvans, Columbia Co. · GoogleProposed
- Google LaGrange Data CenterLaGrange, Troup Co. · GoogleProposed
- High Falls Road Data Center Campus (Montana Property Group)Griffin, Spalding Co. · Montana Property Group LLC (developer; end user undisclosed)Permitted
- Project Sassy (Atlas Development Rome Campus)Rome, Floyd Co. · Atlas Development LLCProposed
- Project Turbo (Gainesville Data Center)Gainesville, Hall Co. · Project Turbo, LLC (developer; end user undisclosed)Proposed
- Spalding Investments Data Center Campus (High Falls Road)Griffin, Spalding Co. · Spalding Investments, LLC (developer; end user undisclosed)Permitted
- Switch Atlanta: The KEEPLithia Springs, Douglas Co. · SwitchOperating
- Vantage Data Centers Douglasville CampusDouglasville, Douglas Co. · Vantage Data CentersProposed
- Vantage Data Centers WestlakeSouth Fulton, Fulton Co. · Vantage Data CentersProposed
Hawaii
6 sites · 0 contested
- DRFortress Data CenterHonolulu · DRFortressOperating
- Endeavor Data CenterHonolulu · Hawaiian TelcomOperating
- Kapolei Cable Landing StationKapolei · Hawaiki Submarine Cable USA LLC (BW Digital)Operating
- Kawaihae Data CenterKawaihae, Hawaii Co. · Hawaiian TelcomOperating
- Maui High Performance Computing CenterKihei · University of Hawaiʻi (for Air Force Research Laboratory)Operating
- Servpac MTP Building 2Mililani, Honolulu Co. · ServpacProposed
Idaho
9 sites · 2 contested
- Gemstone Technology ParkKuna, Ada Co. · Diode VenturesProposedContested
- Lex Developments AI Data Center (former Hoku polysilicon site)Pocatello, Bannock Co. · Lex DevelopmentsCancelledContested
- Meta Kuna Data CenterKuna, Ada Co. · MetaUnder constructionSupported
- GeoBitmine Bingham County FacilityAberdeen, Bingham Co. · GeoBitmineProposed6 MW
- FBI Grey Wolf Data CenterPocatello, Bannock Co. · Federal Bureau of Investigation (U.S. Department of Justice)Operating
- Idaho National Laboratory Collaborative Computing Center (C3)Idaho Falls, Bonneville Co. · Idaho National Laboratory (U.S. Department of Energy)Operating
- OrbitCom Coeur d'Alene Data CenterCoeur d'Alene, Kootenai Co. · OrbitComOperating
- Peak Digital Solutions, Orofino FacilityOrofino, Clearwater Co. · T-REX Acquisition Corp (Peak Digital Solutions LLC)Operating
- T5 NampaNampa, Canyon Co. · T5 Data CentersPermitted
Illinois
67 sites · 10 contested
- Joliet Technology CenterJoliet, Will Co. · HW Technology Park (Hillwood Investment Properties / PowerHouse Data Centers)Permitted1.8 GWIn litigation
- Project Cardinal Data Center CampusYorkville, Kendall Co. · Pioneer Development LLCPermitted1.8 GWIn litigation
- T5 Chicago IV (CHI IV)Grayslake, Lake Co. · T5 Data CentersUnder construction1.6 GWIn litigation
- Steward Drive Data Center (Rochelle)Rochelle, Ogle Co. · Midwest Power Investors LLC (LFF Industrial)Cancelled150 MWOpposed
- Brennan Barrington Hills Data CenterBarrington Hills · Brennan Investment GroupCancelledOpposed
- Lutticken Farm Data Center (Pekin)Pekin, Tazewell Co. · Western Hospitality PartnersCancelledOpposed
- Project Kilo Data Center (South Elgin)South Elgin, Kane Co. · White Rose PartnersProposedOpposed
- Meridian Technology ParkClarksdale, Christian Co. · Eagle Rock PartnersProposed1 GWContested
- CyrusOne Sangamon County Data Center CampusSangamon Co. · CyrusOnePermitted630 MWContested
- Aligned Coal City CampusCoal City, Grundy Co. · Aligned Data CentersProposedContested
- Cloverleaf Troy Data Center CampusTroy, Madison Co. · Cloverleaf InfrastructureProposed500 MWMixed reception
- Edged Chicago Campus, Aurora (ORD01)Aurora, DuPage Co. · Edged USUnder construction72 MWMixed reception
- Hut 8 Batavia Data CenterBatavia, Kane Co. · Batavia DC Corp (Hut 8 Corp subsidiary)Under construction50 MWMixed reception
- Morris Technology ParkMorris, Grundy Co. · TractPermitted1 GWSupported
- Prime ORD Chicago CampusElk Grove Village, Cook Co. · Prime Data CentersUnder construction175 MWSupported
- Meta DeKalb Data CenterDeKalb, DeKalb Co. · MetaOperatingSupported
- Rock Air Data Center CampusRockford · Monarch EnergyProposed1.4 GW
- Logan Prairie Data CenterLatham, Logan Co. · Hut 8 CorpProposed500 MW
- TA Realty Elk Grove Village Data CenterElk Grove Village, Cook Co. · TA RealtyUnder construction250 MW
- CyrusOne CHI1-CHI3 (Aurora)Aurora, Kane Co. · CyrusOneOperating109 MW
- Sangha Systems Hennepin (82 River North)Hennepin, Putnam Co. · Sangha SystemsOperating82 MW
- Metro Edge IMD1Chicago, Cook Co. · Metro Edge Development PartnersPermitted53 MW
- Aligned ORD-01Northlake, Cook Co. · Aligned Data CentersOperating48 MW
- STACK CHI01Elk Grove Village, Cook Co. · STACK InfrastructureOperating40 MW
- Stream Chicago III (ORDC)Elk Grove Village, Cook Co. · Stream Data CentersUnder construction40 MW
- Iron Mountain CHI-1Des Plaines, Cook Co. · Iron Mountain Data CentersOperating36 MW
- NTT Chicago CH1 Data CenterItasca, DuPage Co. · NTT Global Data CentersOperating36 MW
- NTT Chicago CH2 Data CenterItasca, DuPage Co. · NTT Global Data CentersOperating36 MW
- T5 @ Chicago III (Northlake)Northlake, Cook Co. · T5 Data CentersUnder construction36 MW
- Stream Chicago II (ORDB)Elk Grove Village, Cook Co. · Stream Data CentersOperating32 MW
- Stream Chicago I (ORDA)Elk Grove Village, Cook Co. · Stream Data CentersOperating31 MW
- Skybox Chicago IElk Grove Village, Cook Co. · Skybox DatacentersOperating30 MW
- Centersquare ORD2 (Elk Grove Village)Elk Grove Village · Centersquare (Csquare)Operating25.9 MW
- Lambda Chicago EdgeConneX AI FactoryChicago, Cook Co. · LambdaUnder construction23 MW
- Serverfarm CH1Chicago, Cook Co. · ServerfarmOperating21.5 MW
- HydraVault ChicagoChicago, Cook Co. · HydraVaultUnder construction20 MW
- CoreSite CH2Chicago, Cook Co. · CoreSiteOperating18 MW
- CyrusOne Wood Dale CampusWood Dale, DuPage Co. · CyrusOneUnder construction18 MW
- Volo Data CenterVolo, Lake Co. · Chirisa Technology ParksOperating14 MW
- DataBank ORD4 (Chicago Tri-State)Oak Brook, DuPage Co. · DataBankOperating8.75 MW
- EdgeConneX CHI02Elk Grove Village, Cook Co. · EdgeConneXOperating7 MW
- Element Critical Chicago OneWood Dale, DuPage Co. · Element CriticalOperating7 MW
- Element Critical Chicago TwoWood Dale, DuPage Co. · Element CriticalOperating5 MW
- DataBank ORD3 (Mount Prospect)Mount Prospect, Cook Co. · DataBankOperating2.7 MW
- Aligned ORD-02Northlake, Cook Co. · Aligned Data CentersOperating
- Aligned ORD-03Elk Grove Village, Cook Co. · Aligned Data CentersUnder construction
- Centersquare ORD4 (Lisle)Lisle, DuPage Co. · Centersquare (Csquare)Operating
- CloudHQ Mount Prospect (ORD) CampusMount Prospect, Cook Co. · CloudHQUnder construction
- Compass Datacenters Hoffman Estates CampusHoffman Estates, Cook Co. · Compass DatacentersUnder construction
- CoreSite CH1Chicago, Cook Co. · CoreSiteOperating
- CyrusOne Yorkville Technology Campus (CHI-11)Yorkville, Kendall Co. · CyrusOneUnder construction
- Digital Realty CH2Elk Grove Village, Cook Co. · Digital RealtyOperating
- Digital Realty Chicago CH1Elk Grove Village, Cook Co. · Digital RealtyOperating
- Digital Realty ORD10Chicago, Cook Co. · Digital RealtyOperating
- Digital Realty ORD11Chicago, Cook Co. · Digital RealtyOperating
- Digital Realty ORD12Franklin Park, Cook Co. · Digital RealtyOperating
- Equinix CH1Chicago, Cook Co. · EquinixOperating
- Equinix CH7Westmont, DuPage Co. · EquinixOperating
- Equinix CH8 MinookaMinooka, Grundy Co. · EquinixProposed
- Microsoft Elk Grove Data CenterElk Grove Village, Cook Co. · MicrosoftUnder construction
- Microsoft Hoffman Estates Data CenterHoffman Estates, Cook Co. · MicrosoftOperating
- Microsoft Northlake Data CenterNorthlake, Cook Co. · MicrosoftOperating
- Netrality 717 South WellsChicago, Cook Co. · Netrality Data CentersOperating
- Oracle Elk Grove Village Data CenterElk Grove Village, Cook Co. · OracleProposed
- Project Steel Data Center CampusYorkville, Kendall Co. · PrologisPermitted
- QTS Chicago 1Chicago, Cook Co. · QTS Data CentersOperating
- T5 Chicago IIElk Grove Village, Cook Co. · T5 Data CentersOperating
Indiana
32 sites · 16 contested
- Google Project Louie (Morgan County)Monrovia, Morgan Co. · GoogleUnder construction390 MWIn litigation
- Sabey Decatur Technology ParkDecatur Township, Marion Co. · Sabey Data CentersPermitted250 MWIn litigation
- Metrobloks Martindale-Brightwood Data CenterIndianapolis, Marion Co. · MetrobloksPermitted75 MWIn litigation
- Wolcott Data CenterWolcott, White Co. · Blue Ladder DevelopmentPermittedIn litigation
- Meta Jeffersonville Data CenterJeffersonville, Clark Co. · MetaUnder construction407 MWOpposed
- Bristol Innovation ParkBristol, Elkhart Co. · The Province GroupProposedOpposed
- Hancock County MegaSiteHancock Co. · Surge Development LLCCancelledOpposed
- Jefferson Proving Ground Data CenterMadison, Jefferson Co. · UndisclosedPermittedOpposed
- Logix Reality Frankfort Data CenterFrankfort, Clinton Co. · Logix Reality LLCCancelledOpposed
- New Carlisle Chicago Trail Data Center (rezoning denied)New Carlisle, St. Joseph Co. · UndisclosedCancelledOpposed
- Outrigger Industrial Washington Data CenterWashington, Daviess Co. · Outrigger IndustrialCancelledOpposed
- AWS Hobart CampusHobart, Lake Co. · Amazon Web ServicesUnder construction2.4 GWContested
- Amazon Project RainierNew Carlisle, St. Joseph Co. · Amazon Web ServicesOperating2.2 GWContested
- Project ShirleyEagle Creek Township, Lake Co. · Sentinel Data CentersProposed500 MWContested
- DC BLOX Warren Township Data CenterWarren Township, Marion Co. · DC BLOXPermitted78 MWContested
- QLEVR Charlestown Data CenterCharlestown, Clark Co. · QLEVR LLCProposed3 MWContested
- Heartland Industrial Park (Fluidstack Sullivan County Campus)Merom, Sullivan Co. · FluidstackUnder construction2.1 GWMixed reception
- Microsoft Granger Data CenterGranger, St. Joseph Co. · MicrosoftUnder construction1 GWMixed reception
- Google Fort Wayne Data Center (Project Zodiac)Fort Wayne, Allen Co. · GoogleOperatingMixed reception
- Meta Lebanon (Project Domino)Lebanon, Boone Co. · MetaUnder construction1 GWSupported
- AWS Wheatfield Campus (Project Rise)Wheatfield, Jasper Co. · Amazon Web ServicesPermittedSupported
- Vantage Pittsboro CampusPittsboro, Hendricks Co. · Vantage Data CentersPermitted400 MW
- CoreWeave Digital CrossroadsHammond, Lake Co. · CoreWeaveCancelled180 MW
- AboutBit Merom Cryptocurrency Mining FacilityMerom, Sullivan Co. · AboutBitProposed115 MW
- Google Michigan City Data CenterMichigan City, LaPorte Co. · GoogleUnder construction
- Jumping Bison Greensburg Data CenterGreensburg, Decatur Co. · Jumping Bison LLCProposed
- Karis Critical Deep River CampusMerrillville, Lake Co. · Karis CriticalProposed
- Merrillville Technology ParkMerrillville, Lake Co. · The Province GroupProposed
- Microsoft La Porte Data CenterLa Porte, La Porte Co. · MicrosoftUnder construction
- Prologis Shelbyville Data Center CampusShelbyville, Shelby Co. · PrologisPermitted
- Terra Hosting Vermillion Rise FacilityNewport, Vermillion Co. · Terra HostingOperating
- Wylie Capital Broadway Data CenterMerrillville, Lake Co. · Wylie CapitalProposed
Iowa
48 sites · 10 contested
- Salix Data Center Site (Midwest Capital Group)Salix, Woodbury Co. · Midwest Capital Group (MidAmerican Energy)ProposedIn litigation
- MCNI Concord Township Data Center (rezoning denied)Garner, Hancock Co. · MCNIProposedOpposed
- Simple Mining Cedar Falls (rezoning defeated)Cedar Falls, Black Hawk Co. · Simple MiningCancelledOpposed
- Applied Digital Adair County Data CenterAdair, Adair Co. · Applied DigitalProposed200 MWContested
- LightEdge Ames Edge Colocation Data CenterAmes, Story Co. · LightEdge SolutionsProposed25 MWContested
- PathOne Sioux County Data Center (Hull)Hull, Sioux Co. · PathOne Data CentersProposed25 MWContested
- Google Palo Data Center CampusPalo, Linn Co. · GoogleProposedContested
- QTS Clinton Data Center CampusClinton, Clinton Co. · QTS Data CentersProposedContested
- Tract Norwalk Data Center Park (Project West)Norwalk, Warren Co. · TractProposedContested
- Wahawk Power Data CenterWaterloo, Black Hawk Co. · Wahawk Power, LLCProposedContested
- Oppidan Cedar Rapids Data CenterCedar Rapids, Linn Co. · OppidanPermitted10 MWMixed reception
- MiningStore Eldora Township SiteEldora, Hardin Co. · MiningStorePermitted5 MWMixed reception
- MiningStore Union Township SiteUnion, Hardin Co. · MiningStorePermitted5 MWMixed reception
- Meta Davenport Data CenterDavenport, Scott Co. · MetaProposedMixed reception
- Microsoft Project Ginger West Data CenterWest Des Moines, Polk Co. · MicrosoftUnder constructionMixed reception
- Microsoft Van Meter Data Center (Vision Park)Van Meter, Dallas Co. · MicrosoftProposedMixed reception
- QTS Cedar Rapids Data Center CampusCedar Rapids, Linn Co. · QTS Data CentersUnder construction1.1 GWSupported
- Tract Altoona Technology ParkAltoona, Polk Co. · TractPermitted1 GWSupported
- Meta Altoona Data Center CampusAltoona, Polk Co. · MetaOperating350 MWSupported
- Google Cedar Rapids Data Center CampusCedar Rapids, Linn Co. · GoogleUnder constructionSupported
- COPT Defense Van Meter Data Center Shell SiteVan Meter, Dallas Co. · COPT Defense PropertiesProposed1 GW
- Edged Ankeny (Des Moines) Data CenterAnkeny, Polk Co. · Edged EnergyUnder construction13.2 MW
- Oppidan Des Moines Data CenterDes Moines, Polk Co. · OppidanOperating5 MW
- Cologix DSM2 (Cedar Falls)Cedar Falls, Black Hawk Co. · CologixOperating1 MW
- Ark Data Centers Marion (Cedar Rapids)Marion, Linn Co. · Ark Data Centers (formerly Involta)Operating0.81 MW
- Cologix DSM1 (Financial Center)Des Moines, Polk Co. · CologixOperating0.6 MW
- Apple Waukee Data CenterWaukee, Dallas Co. · AppleOperating
- Aureon 616 Data CenterDes Moines, Polk Co. · AureonOperating
- Bluebird Quad Cities Data CenterBettendorf, Scott Co. · Bluebird NetworkOperating
- CyrusOne OCB1 Council Bluffs Data CenterCouncil Bluffs, Pottawattamie Co. · CyrusOneOperating
- Edged Council Bluffs Data Center Campus (Project Lola)Council Bluffs, Pottawattamie Co. · Edged EnergyUnder construction
- Fidium Des Moines Data CenterDes Moines, Polk Co. · Fidium (Consolidated Communications)Operating
- Google Council Bluffs Data CenterCouncil Bluffs, Pottawattamie Co. · GoogleOperating
- InfoBunker Underground Data CenterBoone, Boone Co. · InfoBunker, LLCOperating
- ITS Iowa Data Center (Monticello)Monticello, Jones Co. · Infrastructure Technology Solutions (ITS)Operating
- LightEdge Altoona Data Center CampusAltoona, Polk Co. · LightEdge SolutionsOperating
- Microsoft Project Alluvion Data CenterWest Des Moines, Polk Co. · MicrosoftOperating
- Microsoft Project Ginger East Data CenterWest Des Moines, Polk Co. · MicrosoftUnder construction
- Microsoft Project Mountain Data CenterWest Des Moines, Dallas Co. · MicrosoftOperating
- Microsoft Project Osmium Data CenterWest Des Moines, Warren Co. · MicrosoftUnder construction
- Microsoft Project Ruthenium Data CenterWest Des Moines, Madison Co. · MicrosoftProposed
- MiningStore Grundy Center FacilityGrundy Center, Grundy Co. · MiningStoreCancelled
- MiningStore St. Anthony SiteSt. Anthony, Marshall Co. · MiningStoreOperating
- Simple Mining Cascade (Dubuque County)Cascade, Dubuque Co. · Simple MiningProposed
- Simple Mining ManchesterManchester, Delaware Co. · Simple MiningPermitted
- South Front Networks IA-Davenport Interconnection FacilityDavenport, Scott Co. · South Front NetworksOperating
- TierPoint Newton Data CenterNewton, Jasper Co. · TierPointOperating
- US Signal IA01 Des Moines Data Center (Waukee)Waukee, Dallas Co. · US SignalOperating
Kansas
12 sites · 6 contested
- Project Red WolfKansas City, Wyandotte Co. · Red Wolf DCD Properties LLCProposed600 MWIn litigation
- DAMAC Digital Logistics Park Data CenterEdgerton, Johnson Co. · DAMAC Digital Solutions Kansas, LLCPermittedIn litigation
- Beale Infrastructure Gardner CampusGardner, Johnson Co. · Beale InfrastructureProposedOpposed
- Crypto Colo Center McLouth Data Center (proposed), cancelledMcLouth, Jefferson Co. · Crypto Colo Center CorpCancelledOpposed
- Evolution Technology Bitcoin Mine (Bourbon County)Uniontown, Bourbon Co. · Evolution TechnologyOperatingOpposed
- Google Project Helium (Barber County)Sharon, Barber Co. · GooglePermittedContested
- Beale Project Pilot (De Soto)De Soto, Johnson Co. · Beale InfrastructureUnder constructionMixed reception
- Project YardbirdKansas City, Wyandotte Co. · PowerTransitionsProposed200 MW
- DataBank MCI3 South Lake Campus Data CenterLenexa, Johnson Co. · DataBankOperating12.75 MW
- DataBank MCI2 Pine Ridge Data CenterOverland Park, Johnson Co. · DataBankOperating2 MW
- QTS Overland Park Data Center (OVP1)Overland Park, Johnson Co. · QTS Data CentersOperating
- TierPoint Kansas City - LenexaLenexa, Johnson Co. · TierPointOperating
Kentucky
17 sites · 6 contested
- TenKey LandCo Project Lionsgate, Franklin Data CenterFranklin, Simpson Co. · TenKey LandCo I LLCProposedIn litigation
- Project Lincoln: OC Data CenterLa Grange, Oldham Co. · Western Hospitality PartnersCancelled600 MWOpposed
- PowerHouse Data Centers, Louisville (Camp Ground Road)Louisville, Jefferson Co. · PowerHouse Data CentersUnder construction402 MWOpposed
- Panattoni Burgin Data Center CampusBurgin, Mercer Co. · PanattoniProposedOpposed
- Cave Point Commerce CenterCave City, Barren Co. · Kentucky Industrial Alliance LLCProposed1.2 GWContested
- Carrollton Industrial CampusCarrollton, Carroll Co. · PowerHouse Data Centers / Poe CompaniesProposedContested
- TeraWulf Muskie Data Campus (EastPark)Ashland, Greenup Co. · TeraWulfProposed1 GWMixed reception
- Justified Data CampusHawesville, Hancock Co. · TeraWulfUnder construction401 MWMixed reception
- Paducah Site AI Data Center CampusKevil, McCracken Co. · BrookfieldProposed1.8 GW
- Core Scientific Calvert City Data Center (Calvert 1, 2 & 3)Calvert City, Marshall Co. · Core ScientificOperating150 MW
- Riot Platforms Paducah FacilityPaducah, McCracken Co. · Riot PlatformsOperating100 MW
- Blockware Solutions Pike County FacilityBelfry, Pike Co. · Blockware SolutionsOperating75 MW
- Riot Platforms Calvert City FacilityCalvert City, Marshall Co. · Riot PlatformsOperating25 MW
- Soluna Project SophieMurray, Calloway Co. · Soluna HoldingsOperating25 MW
- Flexential Louisville - DowntownLouisville, Jefferson Co. · FlexentialOperating
- Flexential Louisville - East (NAS-equivalent LOU-East)Louisville, Jefferson Co. · FlexentialOperating
- Kentucky Enterprise Industrial Park Data CenterPikeville, Pike Co. · MD Squared Power LLCProposed
Louisiana
13 sites · 3 contested
- Amazon Web Services Shreveport Campus (Resilient Technology Park)Shreveport, Caddo Co. · Amazon Web ServicesProposedIn litigation
- MS Solar Grid Data (New Orleans East)New Orleans, Orleans Co. · MS Solar Grid DataCancelledOpposed
- Meta HyperionDelhi vicinity, Richland Co. · MetaUnder construction2 GWContested
- Amazon Web Services Bossier Parish Campus (Benton)Benton, Bossier Co. · Amazon Web ServicesUnder constructionMixed reception
- Amazon Web Services Caddo Parish Campus (Blanchard)Blanchard, Caddo Co. · Amazon Web ServicesUnder constructionMixed reception
- Hut 8 River Bend AI Data Center CampusSt. Francisville, West Feliciana Co. · Hut 8Under construction330 MWSupported
- Applied Digital Delta Forge 1 AI Factory CampusBoyce, Rapides Co. · Applied Digital CorporationUnder construction300 MW
- Cogent Communications New Orleans (650 Poydras)New Orleans, Orleans Co. · Cogent CommunicationsOperating0.75 MW
- Bossier Parish Campus (with Amazon)Benton, Bossier Co. · STACK InfrastructureUnder construction
- Caddo Parish Campus (with Amazon)Blanchard, Caddo Co. · STACK InfrastructureUnder construction
- DartPoints SHV01 ShreveportShreveport, Caddo Co. · DartPointsOperating
- EdgeConneX SLI01 (Slidell)Slidell, St. Tammany Co. · EdgeConneXOperating
- Fogo Data Centers New OrleansNew Orleans, Orleans Co. · Fogo SolutionsOperating
Maine
6 sites · 2 contested
- Wiscasset Data Center (Old Ferry Road Site)Wiscasset, Lincoln Co. · Unnamed developer (NDA with town)ProposedOpposed
- Loring LiquidCool Data Center (Green 4 Maine Campus)Limestone, Aroostook Co. · LiquidCool Solutions / Green 4 MaineProposed50 MWContested
- Sentinel Data Centers Androscoggin Mill Campus, JayJay, Franklin Co. · Sentinel Data CentersCancelled82 MWSupported
- Nautilus Data Technologies Data Center (Former Great Northern Paper Mill / One North)Millinocket, Penobscot Co. · Nautilus Data TechnologiesCancelled60 MW
- CENTRA Digital Interconnect -- 340 Cumberland (PMW01)Portland, Cumberland Co. · CENTRA Digital InterconnectOperating
- FirstLight Brunswick Data CenterBrunswick, Cumberland Co. · FirstLight FiberOperating
Maryland
23 sites · 7 contested
- Brightseat Tech ParkLandover, Prince George's Co. · Lerner Enterprises / The Tower Companies (Brightseat Associates LLC)Permitted820 MWOpposed
- Dickerson Data CenterDickerson, Montgomery Co. · Atmosphere Data CentersProposed360 MWOpposed
- Rowan Digital Infrastructure Frederick Campus (Bauxite I)Adamstown, Frederick Co. · Rowan Digital InfrastructureUnder construction300 MWOpposed
- Aligned Data Centers IAD-04 FrederickAdamstown, Frederick Co. · Aligned Data CentersUnder construction72 MWOpposed
- TeraWulf Morgantown Generating Station AI CampusCharles Co. · TeraWulfProposed1 GWContested
- 1500 Woodlawn Drive Data Center CampusWoodlawn, Baltimore Co. · Security Land and Development LPProposed150 MWContested
- Globalinx Fastnet Cable Landing StationBerlin, Worcester Co. · Globalinx (GLX)Proposed5 MWContested
- AWS Calvert County Data Center CampusLusby, Calvert Co. · Amazon Web ServicesCancelledMixed reception
- Appeal Digital ParkLusby, Calvert Co. · Natelli HoldingsProposed300 MW
- AiNET CyberNAPGlen Burnie, Anne Arundel Co. · AiNETOperating80 MW
- AiNET One Market Center (Baltimore Carrier Hotel)Baltimore · AiNETOperating80 MW
- Aligned Data Centers IAD-06 FrederickFrederick, Frederick Co. · Aligned Data CentersUnder construction72 MW
- 12401 Prosperity Drive Data CenterSilver Spring, Montgomery Co. · Sansone Group / PrisedaOperating35.2 MW
- Expedient Baltimore - Tide PointBaltimore, Baltimore city Co. · ExpedientOperating2 MW
- DataBank BWI1 (Downtown Baltimore Data Center)Baltimore · DataBankOperating1.5 MW
- Expedient BWI1 (Owings Mills)Owings Mills, Baltimore Co. · ExpedientOperating0.8 MW
- Cogent Data Center, ElkridgeElkridge, Howard Co. · Cogent CommunicationsOperating
- Lumen Baltimore 1Baltimore, Baltimore city Co. · Lumen TechnologiesOperating
- Quantum FrederickFrederick, Frederick Co. · TPG Real Estate Partners / Catellus Development CorporationUnder construction
- Rowan Digital Infrastructure Bauxite IIFrederick, Frederick Co. · Rowan Digital InfrastructurePermitted
- Rowan Digital Infrastructure Bauxite IIIFrederick, Frederick Co. · Rowan Digital InfrastructurePermitted
- TierPoint Baltimore - BWILinthicum Heights, Anne Arundel Co. · TierPointOperating
- TierPoint Baltimore (Russell Street)Baltimore · TierPointOperating
Massachusetts
13 sites · 2 contested
- Markley Group One Lowell Data CenterLowell, Middlesex Co. · Markley GroupOperatingIn litigation
- Servistar Realties Westfield Data Center CampusWestfield, Hampden Co. · Servistar RealtiesProposed42 MWContested
- Markley Group Boston (One Summer Street / BOSIX)Boston, Suffolk Co. · Markley GroupOperating30 MW
- Massachusetts Green High Performance Computing CenterHolyoke, Hampden Co. · MGHPCC consortium (BU/Harvard/MIT/Northeastern/UMass/Yale)Operating15 MW
- Iron Mountain Boston Data Center (BOS-1)Northborough, Worcester Co. · Iron MountainOperating3.6 MW
- 365 Data Centers Marlborough (MA1)Marlborough, Middlesex Co. · 365 Data CentersOperating2.8 MW
- Amazon Data Services GraftonGrafton, Worcester Co. · Amazon Data ServicesProposed
- Amazon Data Services WestboroughWestborough, Worcester Co. · Amazon Data ServicesProposed
- CoreSite BO1 - Boston, MASomerville, Middlesex Co. · CoreSiteOperating
- Digital Realty BOS14Needham, Norfolk Co. · Digital RealtyOperating
- Equinix BO1Waltham, Middlesex Co. · EquinixOperating
- TierPoint Boston - AndoverAndover, Essex Co. · TierPointOperating
- TierPoint Boston Data Center (Marlborough)Marlborough, Middlesex Co. · TierPointOperating
Michigan
36 sites · 20 contested
- Stargate The Barn CampusSaline Township, Washtenaw Co. · OpenAI / Oracle / Related DigitalUnder construction1.4 GWIn litigation
- Hyperscale Data Dowagiac CampusDowagiac, Cass Co. · Hyperscale Data, Inc.Under construction340 MWIn litigation
- Gibraltar Data Center (former McLouth Steel site)Gibraltar, Wayne Co. · Raeden (with Cal Realty / Ferragon Corp.)Proposed100 MWIn litigation
- Dafter Township Bitcoin MineDafter, Chippewa Co. · Odessa PartnersOperatingIn litigation
- Allen Park Data CenterAllen Park, Wayne Co. · Solstice DataCancelled26 MWOpposed
- Howell Township Hyperscale Data CenterHowell, Livingston Co. · Stantec Consulting Michigan / Randee LLCCancelledOpposed
- Kalkaska GoKalkaska Co. · Rocklocker LLCCancelledOpposed
- Thor Equities Augusta Township Data Center (Form8tion)Augusta Township, Washtenaw Co. · Thor EquitiesCancelledOpposed
- U-M / Los Alamos Research Computing CenterYpsilanti, Washtenaw Co. · University of Michigan (with Los Alamos National Laboratory)ProposedOpposed
- Washington Township Technical CampusWashington, Macomb Co. · PrologisCancelledOpposed
- Wixom Road Data Center CampusWixom, Oakland Co. · Wixom Industrial One / Sansone GroupProposedOpposed
- Alterra Marshall Technology & Energy CenterMarshall, Calhoun Co. · Alterra DevelopmentProposed1.4 GWContested
- Project CannoliVan Buren Township, Wayne Co. · GoogleProposed1 GWContested
- Metrobloks Southfield Data CenterSouthfield, Oakland Co. · MetrobloksPermitted100 MWContested
- Buick City Data CenterFlint, Genesee Co. · Hillwood-SterlingProposedContested
- Grand River Power Company Smithville Bitcoin MineEaton Rapids, Eaton Co. · Grand River Power CompanyOperatingContested
- Mason / Vevay Township Data Center (unnamed developer)Mason, Ingham Co. · Undisclosed developer (represented by Dykema Gossett PLLC)ProposedContested
- Microsoft Dorr Township Data CenterDorr Township, Allegan Co. · MicrosoftProposedContested
- Microsoft Gaines Township Data CenterGaines Township, Kent Co. · MicrosoftProposedContested
- Project FlexLyon Township, Oakland Co. · Verrus (Sidewalk Infrastructure Partners)ProposedContested
- Oakland University Campus Computing FacilityAuburn Hills, Oakland Co. · Fairmount Properties (with Oakland University)Proposed26 MWMixed reception
- Deep Green Lansing Data CenterLansing, Ingham Co. · Deep GreenCancelled24 MWMixed reception
- Microsoft Lowell Township Data CenterLowell Township, Kent Co. · MicrosoftProposedMixed reception
- Project Cherry BlossomFrenchtown Township, Monroe Co. · Cloverleaf InfrastructureProposedMixed reception
- Switch Pyramid CampusGaines Township, Kent Co. · SwitchUnder construction320 MWSupported
- 123NET Southfield DC1Southfield, Oakland Co. · 123NETOperating4 MW
- 123NET DC4 Grand Rapids Data CenterByron Center, Kent Co. · 123NETOperating
- 123NET Southfield DC2 (Southfield Data Center NW)Southfield, Oakland Co. · 123NETOperating
- 123NET Southfield DC3 (Southfield Data Center W)Southfield, Oakland Co. · 123NETOperating
- 365 Data Centers Detroit (DT1)Southfield, Oakland Co. · 365 Data CentersOperating
- EdgeConneX DET01Detroit (Oakland County), Oakland Co. · EdgeConneXOperating
- US Signal MI01 Grand Rapids Data CenterKentwood, Kent Co. · US SignalOperating
- US Signal MI02 Grand Rapids Data CenterByron Center, Kent Co. · US SignalOperating
- US Signal MI03 Detroit Data CenterBelleville, Wayne Co. · US SignalOperating
- US Signal MI04 Detroit Data CenterSouthfield, Oakland Co. · US SignalOperating
- US Signal MI05 Detroit Data CenterAuburn Hills, Oakland Co. · US SignalOperating
Minnesota
26 sites · 6 contested
- Google Hermantown Data CenterHermantown, St. Louis Co. · GoogleProposed600 MWIn litigation
- Google Project Skyway (Pine Island)Pine Island, Goodhue Co. · GoogleProposedIn litigation
- Nobles County Powered Data ParkWorthington, Nobles Co. · Geronimo Power (Brookfield Asset Management subsidiary)Proposed400 MWOpposed
- Apple Valley Technology Park (Oppidan/Rockport)Apple Valley, Dakota Co. · Oppidan Investment CompanyCancelledOpposed
- Revolve Labs Moose Lake (withdrawn)Moose Lake, Carlton Co. · Revolve LabsCancelledOpposed
- Revolve Labs Windom (withdrawn)Windom, Cottonwood Co. · Revolve LabsCancelledOpposed
- Amazon Becker Data Center (Suspended)Becker, Sherburne Co. · Amazon Web ServicesCancelledMixed reception
- Connect Data Centers, Eagan (powered by Oppidan)Eagan, Dakota Co. · Oppidan Investment CompanyUnder constructionMixed reception
- Meta Rosemount Data CenterRosemount, Dakota Co. · MetaUnder construction75 MWSupported
- Farmington Technology Park (Tract)Farmington, Dakota Co. · TractProposed708 MW
- Elk River Data Center (Elk River Capital / Swervo Development)Elk River, Sherburne Co. · Elk River Capital LLC (Swervo Development Corp affiliate)Cancelled33 MW
- Revolve Labs GlencoeGlencoe, McLeod Co. · Revolve LabsOperating20 MW
- Centersquare Shakopee (MSP1 Campus)Shakopee, Scott Co. · Centersquare (fka Cyxtera / Evoque; site originally built by Compass Datacenters)Operating19.1 MW
- AAIM Data Centers, Blue Earth (Minnesota 1)Blue Earth, Faribault Co. · AAIM Data CentersOperating15 MW
- CENTRA MSP1Eagan, Dakota Co. · CENTRA Digital InterconnectUnder construction12 MW
- DataBank Brooklyn Park CampusBrooklyn Park, Hennepin Co. · DataBankOperating9 MW
- Flexential Minneapolis - Chaska (MSP01)Chaska, Carver Co. · FlexentialOperating9 MW
- DataBank East Twin Cities Data Center (MSP2)Eagan, Dakota Co. · DataBankOperating5 MW
- LightEdge Chaska (fka Stream Data Centers Minneapolis I)Chaska, Carver Co. · LightEdge (GI Partners)Operating3.6 MW
- Vaultas St. CloudSt. Cloud, Stearns Co. · VaultasProposed0.6 MW
- Archer Datacenter FaribaultFaribault, Rice Co. · Archer DatacenterProposed
- H5 Data Centers St. PaulSt. Paul, Ramsey Co. · H5 Data CentersOperating
- Lumen Minneapolis 3Minneapolis, Hennepin Co. · Lumen TechnologiesOperating
- Microsoft Becker Data CenterBecker, Sherburne Co. · MicrosoftProposed
- Monticello Tech Park (Monticello Tech LLC / Frattalone)Monticello, Wright Co. · Frattalone Companies (via Monticello Tech, LLC)Proposed
- Scannell Properties Monticello Tech ParkMonticello, Wright Co. · Scannell Properties LLCProposed
Mississippi
15 sites · 3 contested
- xAI SouthavenSouthaven, DeSoto Co. · xAIOperating2 GWIn litigation
- AWS Project Atlas, Madison County Mega Site (Canton)Canton, Madison Co. · Amazon Web ServicesUnder construction1 GWContested
- Prado AI / PraCon Global AI Industrial CampusRidgeland, Madison Co. · PraCon Global Investment GroupProposedContested
- Compass Datacenters Lauderdale County Hyperscale CampusMeridian, Lauderdale Co. · Compass DatacentersUnder construction500 MWMixed reception
- AVAIO Digital TaurusBrandon, Rankin Co. · AVAIO Digital PartnersUnder construction116 MWMixed reception
- CleanSpark Clinton Bitcoin Mining FacilitiesClinton, Hinds Co. · CleanSpark, Inc.Operating16.5 MW
- Columbus Bitcoin Mining Facility (formerly Greenidge Columbus)Columbus, Lowndes Co. · LM Funding America, Inc. (Power & Compute)Operating8.5 MW
- AWS Clinton Data CenterClinton, Hinds Co. · Amazon Web ServicesUnder construction
- AWS Costas Property Campus (Ridgeland)Ridgeland, Madison Co. · Amazon Web ServicesUnder construction
- AWS Project Steamboat, Warren County Data Center CampusVicksburg, Warren Co. · Amazon Web ServicesProposed
- CleanSpark Meridian Bitcoin Mining FacilityMeridian, Lauderdale Co. · CleanSpark, Inc.Operating
- CleanSpark Vicksburg Bitcoin Mining FacilityVicksburg, Warren Co. · CleanSpark, Inc.Operating
- CleanSpark Wiggins Bitcoin Mining FacilityWiggins, Stone Co. · CleanSpark, Inc.Operating
- Gawk Enerpower Amory Bitcoin Mining FacilityAmory, Monroe Co. · Gawk Enerpower LtdUnder construction
- MACROHARDRR (xAI Southaven Data Center III)Southaven, DeSoto Co. · xAIOperating
Missouri
20 sites · 6 contested
- Google Project Spade CampusNew Florence, Montgomery Co. · GoogleUnder construction1.2 GWIn litigation
- Nebius AI Factory (Independence)Independence, Jackson Co. · Nebius GroupUnder construction1.2 GWIn litigation
- Festus Data Center CampusFestus, Jefferson Co. · CRG (Clayco)Permitted600 MWIn litigation
- Armory Innovation District Data CenterSt. Louis · Contour / TerraWatt (with Steadfast City, THO Investments, ARCO, Lewis Rice)Permitted120 MWIn litigation
- AWS Project Green CampusNew Florence, Montgomery Co. · Amazon Web ServicesUnder constructionContested
- Project Butterfly (former Emerson campus)Ferguson, St. Louis Co. · SSL Investments / Next Revolution TechnologiesProposedContested
- Metrobloks Liberty CampusLiberty, Clay Co. · MetrobloksProposed150 MWMixed reception
- Crusoe Warrenton CampusWarrenton, Warren Co. · CrusoePermittedMixed reception
- Meta Kansas City NorthlandKansas City, Clay Co. · MetaOperating750 MWSupported
- White Cloud AcresBarnard, Nodaway Co. · Scale MicrogridsProposed600 MW
- Cloverleaf Troy CampusTroy, Lincoln Co. · Cloverleaf InfrastructureProposed500 MW
- Google Project MicaKansas City, Clay Co. · GoogleUnder construction500 MW
- Lambda Kansas City AI SupercomputerKansas City, Platte Co. · LambdaUnder construction100 MW
- Patmos KC Star Building CampusKansas City, Jackson Co. · Patmos HostingOperating35 MW
- Diamond Farms (Gateway Digital Campus)Villa Ridge, Franklin Co. · Provident Data CentersProposed
- Hematite Bitcoin Mining FacilityHematite, Jefferson Co. · NYDIG / Global Connect CommunicationsPermitted
- Marshfield Data Center (Lumon Solutions)Marshfield, Webster Co. · Lumon Solutions Marshfield, LLCUnder construction
- Netrality 210 North Tucker (St. Louis)St. Louis, St. Louis city Co. · Netrality Data CentersOperating
- Project KestrelKansas City, Platte Co. · Shenandoah Computing LLCPermitted
- TierPoint St. Louis - OliveSaint Louis, St. Louis City Co. · TierPointOperating
Montana
8 sites · 1 contested
- Bonner Mill Bitcoin Mine (Project Spokane / HyperBlock)Bonner, Missoula Co. · HyperBlock Inc.CancelledOpposed
- Big Sky Digital Infrastructure CampusBillings, Yellowstone Co. · Quantica InfrastructureProposed1 GWMixed reception
- Atlas Power Butte Data CenterButte, Silver Bow Co. · Atlas PowerOperating300 MWMixed reception
- Sentinum BNI Montana Bitcoin Mining FacilitySidney, Richland Co. · Sentinum (Hyperscale Data)Operating125 MW
- Bitzero Polson Data Center (SKQ/Salish-Kootenai Dam)Polson, Lake Co. · BitzeroProposed50 MW
- Sabey Data Centers Butte Campus (Montana Connections)Butte, Silver Bow Co. · Sabey Data CentersCancelled50 MW
- Big Horn Data Hub (Hardin Generating Station)Hardin, Big Horn Co. · Beowulf Electricity & DataCancelled
- NYDIG DFM Kraken Central SiteSidney vicinity (unincorporated), Richland Co. · NYDIG DFMPermitted
Nebraska
24 sites · 4 contested
- Jigowatt Stanton Bitcoin MineStanton, Stanton Co. · JigowattOperating70 MWOpposed
- ArchGreen Doniphan Data Center (proposed)Doniphan, Hall Co. · ArchGreen InfrastructureProposedOpposed
- Sagebrush Hallam Hyperscale Campus (proposed)Hallam, Lancaster Co. · Sagebrush Infrastructure PartnersProposed1.7 GWContested
- Google Nebraska AI Campus (proposed)Otoe Co. · GoogleProposed1 GWContested
- Meta Sarpy Campus (Springfield expansion)Springfield, Sarpy Co. · MetaUnder constructionMixed reception
- BginUSA York Data Mining ComplexYork, York Co. · BginUSAPermittedSupported
- Google Papillion Data CenterPapillion, Sarpy Co. · GoogleOperatingSupported
- MARA Kearney FacilityKearney, Buffalo Co. · MARA HoldingsOperating100 MW
- H5 Data Centers Omaha (La Vista)La Vista, Sarpy Co. · H5 Data CentersOperating17.3 MW
- Fortitude Aurora Nebraska FacilityAurora, Hamilton Co. · FortitudeOperating15 MW
- ArchGreen Grand Island Data CenterGrand Island, Hall Co. · ArchGreen InfrastructureOperating14 MW
- Fortitude Prosser Nebraska FacilityProsser, Adams Co. · FortitudeOperating12.5 MW
- Fortitude Grand Island Nebraska FacilityGrand Island, Hall Co. · FortitudeOperating12 MW
- 1623 FarnamOmaha, Douglas Co. · 1623 FarnamOperating8 MW
- TierPoint Omaha - Bellevue Data CenterBellevue, Sarpy Co. · TierPointOperating5.5 MW
- Binary Net The Vault Data CenterLincoln, Lancaster Co. · Binary NetOperating
- First National Technology Solutions Omaha Data CenterOmaha, Douglas Co. · First National Technology SolutionsOperating
- Foundry Digital Minden Site (former Compute North expansion)Minden, Kearney Co. · Foundry DigitalProposed
- Google Lincoln Data CenterLincoln, Lancaster Co. · GoogleUnder construction
- Google Omaha Data CenterOmaha, Douglas Co. · GoogleOperating
- LightEdge Omaha Data CenterPapillion, Sarpy Co. · LightEdgeOperating
- Scott Data CenterOmaha, Douglas Co. · Scott DataOperating
- Sequitor Edge Kearney Data CenterKearney, Buffalo Co. · Sequitor EdgePermitted
- TierPoint Omaha - Midlands Data CenterPapillion, Sarpy Co. · TierPointOperating
Nevada
41 sites · 7 contested
- Monarch Data CenterYerington, Lyon Co. · Copia PowerPermitted1 GWOpposed
- Townsite Solar 2 Boulder City Data CenterBoulder City, Clark Co. · Townsite Solar 2 LLCProposed167 MWOpposed
- Manse Technology CampusPahrump, Nye Co. · Manse Technology Campus LLCProposedOpposed
- Fleet Data Centers Storey County Campus (South Valley & Peru Ridge)McCarran, Storey Co. · Fleet Data CentersUnder construction400 MWContested
- Microsoft Silver Springs Data Center CampusSilver Springs, Lyon Co. · MicrosoftProposedContested
- Microsoft Victory Logistics District CampusFernley, Lyon Co. · MicrosoftProposedContested
- Switch LAS 19Enterprise, Clark Co. · SwitchPermittedContested
- Tract Silver Springs Data Center ParkSilver Springs, Lyon Co. · TractProposed1.6 GWSupported
- Switch CITADEL CampusMcCarran, Storey Co. · SwitchOperating650 MWSupported
- Vantage Data Centers NV1McCarran, Storey Co. · Vantage Data CentersUnder construction224 MWSupported
- Tract Virginia Highlands Technology ParkLockwood, Storey Co. · TractProposed2.5 GW
- Peru Shelf Technology ParkStorey Co. · TractUnder construction810 MW
- Switch Tahoe Reno 1 (The Citadel Campus)McCarran, Storey Co. · SwitchOperating650 MW
- EdgeCore Reno Data Center CampusMcCarran, Storey Co. · EdgeCore Digital InfrastructureUnder construction216 MW
- Novva Las Vegas Data CenterNorth Las Vegas, Clark Co. · Novva Data CentersOperating100 MW
- PowerHouse Reno CampusMcCarran, Storey Co. · PowerHouse Data CentersUnder construction65 MW
- Novva Tahoe Reno Data CenterMcCarran, Storey Co. · Novva Data CentersOperating60 MW
- Jet.AI Moapa Data Center CampusMoapa, Clark Co. · Jet.AI Inc.Proposed50 MW
- Flexential Las Vegas - North (LAS04)North Las Vegas, Clark Co. · FlexentialOperating9 MW
- Cobalt Cheyenne Data CenterLas Vegas, Clark Co. · Cobalt Data CentersOperating5.5 MW
- DataBank LAS1Las Vegas, Clark Co. · DataBankOperating3.35 MW
- EdgeConneX Las Vegas (EDCLAS01)Las Vegas, Clark Co. · EdgeConneXOperating0.75 MW
- Amazon Data Services Reno Data Center CampusSparks, Storey Co. · Amazon Web ServicesUnder construction
- Apple Reno Data Center (Reno Technology Park)Sparks, Washoe Co. · AppleOperating
- Colovore Reno 1 (RN01)McCarran, Storey Co. · ColovorePermitted
- Fiberhub LAS1Las Vegas, Clark Co. · Fiberhub (VegasNAP, LLC)Operating
- Flexential Las Vegas - DowntownLas Vegas, Clark Co. · FlexentialOperating
- Google Data CenterStorey Co. · GoogleOperating
- Google Henderson Data CenterHenderson, Clark Co. · GoogleOperating
- Novva Apex Industrial Park Data CenterNorth Las Vegas, Clark Co. · Novva Data CentersProposed
- Switch Apex Industrial Park Land PositionNorth Las Vegas, Clark Co. · SwitchProposed
- Switch Edge 1Las Vegas, Clark Co. · SwitchOperating
- Switch Las Vegas 10Las Vegas, Clark Co. · SwitchOperating
- Switch Las Vegas 11Las Vegas, Clark Co. · SwitchOperating
- Switch Las Vegas 12Las Vegas, Clark Co. · SwitchOperating
- Switch Las Vegas 14Las Vegas, Clark Co. · SwitchOperating
- Switch Las Vegas 5Las Vegas, Clark Co. · SwitchOperating
- Switch Las Vegas 7Enterprise, Clark Co. · SwitchOperating
- Switch Las Vegas 9Las Vegas, Clark Co. · SwitchOperating
- Switch Tahoe Reno 2 (The Citadel Campus)McCarran, Storey Co. · SwitchOperating
- Switch Tahoe Reno 3 (The Citadel Campus)McCarran, Storey Co. · SwitchOperating
New Hampshire
6 sites · 0 contested
- ColoSpace Bedford Data CenterBedford, Hillsborough Co. · ColoSpace, Inc.Operating
- Consolidated Communications Manchester Data CenterManchester, Hillsborough Co. · Consolidated CommunicationsOperating
- Dynamic Internet Salem Data CenterSalem, Rockingham Co. · Dynamic InternetOperating
- FairPoint Laconia Data CenterLaconia, Belknap Co. · FairPoint CommunicationsOperating
- FirstLight Manchester Data CenterManchester, Hillsborough Co. · FirstLight FiberOperating
- FirstLight Portsmouth, NH Data CenterPortsmouth, Rockingham Co. · FirstLightOperating
New Jersey
23 sites · 3 contested
- Nebius Vineland Data CenterVineland, Cumberland Co. · Nebius GroupOperating300 MWContested
- CoreWeave NEST CampusKenilworth, Union Co. · CoreWeaveUnder construction250 MWContested
- Andover HPC Data Center (former Newton Airport Site)Andover, Sussex Co. · Andover HPC DevelopmentProposedContested
- A1 Data Center CampusMillville, Cumberland Co. · A1 Data CenterCancelled1.4 GW
- 165 Halsey StreetNewark, Essex Co. · Tishman Real EstateOperating80 MW
- QTS Piscataway 1Piscataway, Middlesex Co. · QTS Data CentersOperating65 MW
- CyrusOne NYM1 (Somerset)Somerset, Somerset Co. · CyrusOneOperating30 MW
- Iron Mountain Data Centers NJE-1Edison, Middlesex Co. · Iron MountainOperating30 MW
- Cologix Cedar Knolls CampusCedar Knolls, Morris Co. · CologixOperating
- Cologix NNJ3Parsippany, Morris Co. · CologixOperating
- CoreSite NY2 - Secaucus, NJSecaucus, Hudson Co. · CoreSiteOperating
- Digital Realty Clifton CampusClifton, Passaic Co. · Digital RealtyOperating
- Digital Realty New York EWR10Weehawken, Hudson Co. · Digital RealtyOperating
- Digital Realty New York EWR11Piscataway Township, Middlesex Co. · Digital RealtyOperating
- Digital Realty New York EWR12Piscataway Township, Middlesex Co. · Digital RealtyOperating
- Digital Realty Somerset (650 Randolph Road)Franklin Township (Somerset), Somerset Co. · Digital RealtyOperating
- Equinix NY11Carteret, Middlesex Co. · EquinixOperating
- Equinix NY3Secaucus, Hudson Co. · EquinixUnder construction
- Equinix NY4Secaucus, Hudson Co. · EquinixOperating
- Equinix NY5Secaucus, Hudson Co. · EquinixOperating
- Equinix NY7North Bergen, Hudson Co. · EquinixOperating
- Lumen Weehawken 1 Data CenterWeehawken, Hudson Co. · Lumen TechnologiesOperating
- NYSE Data Center (Mahwah)Mahwah, Bergen Co. · New York Stock ExchangeOperating
New Mexico
11 sites · 5 contested
- Green Data Socorro CampusSocorro, Socorro Co. · Green Data (Green Data Centers)Cancelled2 GWOpposed
- Atterix Raton Advanced Digital HubRaton, Colfax Co. · Atterix LLCProposed50 MWOpposed
- Green Data Spaceport America Data CenterSierra Co. · Green Data / Aetherion Inc.Cancelled5 MWOpposed
- Stargate Project JupiterSanta Teresa, Dona Ana Co. · OpenAI / Oracle / STACK InfrastructureUnder construction1 GWContested
- WestBlock Capital Bitcoin Mine (Shiprock)Shiprock, San Juan Co. · WestBlock CapitalCancelled15 MWContested
- Meta Los Lunas AI ExpansionLos Lunas, Valencia Co. · MetaUnder constructionMixed reception
- Zenith Volts Roswell / Chaves County Data CenterRoswell, Chaves Co. · Zenith Volts Corp.Permitted1.2 GWSupported
- Lea County Data CenterLovington, Lea Co. · New Era Energy & Digital, Inc.Proposed7 GW
- Connect Albuquerque (Westpointe 40)Albuquerque, Bernalillo Co. · Connect Data Centers (Oppidan Investment Company)Operating10 MW
- Centersquare ABQ1Albuquerque, Bernalillo Co. · Centersquare (formerly Cyxtera Technologies / Evoque Data Center Solutions)Operating
- H5 Data Centers AlbuquerqueAlbuquerque, Bernalillo Co. · H5 Data CentersOperating
New York
38 sites · 13 contested
- Digihost / Digi Power X, Fortistar North TonawandaNorth Tonawanda, Niagara Co. · Digihost (Digi Power X)Operating120 MWIn litigation
- Greenidge GenerationDresden, Yates Co. · Greenidge GenerationOperating106 MWIn litigation
- American Bitcoin, Niagara Falls ("Alpha Site")Niagara Falls, Niagara Co. · American Bitcoin (Hut 8)Operating50 MWIn litigation
- Treetop East Fishkill Data Center (proposed, no application filed)East Fishkill, Dutchess Co. · Treetop DevelopmentProposed1 GWOpposed
- STREAM U.S. Data Centers at STAMPAlabama, Genesee Co. · Stream U.S. Data Centers LLCProposed500 MWOpposed
- TeraWulf AI Data Center Campus, LansingLansing, Tompkins Co. · TeraWulfProposed400 MWOpposed
- Ranalli Lysander Data CenterLysander, Onondaga Co. · RanalliProposed300 MWOpposed
- North Country Collocation Services Massena Data Center (former Reynolds site)Massena, St. Lawrence Co. · North Country Collocation Services (NCCS)Proposed635 MWContested
- Riverview Innovation & Technology CampusTonawanda, Erie Co. · Riverview Innovation & Technology CampusProposed300 MWContested
- Brookhaven Digital Infrastructure Facility (WF Industrial / Wildflower, Yaphank)Yaphank, Suffolk Co. · WF Industrial (Wildflower)Proposed176.6 MWContested
- Blockfusion Niagara Falls Facility (North East Data)Niagara Falls, Niagara Co. · BlockfusionOperating100 MWContested
- Eco-Yotta Data Center (proposed, County Route 9)Oneonta, Otsego Co. · Eco-Yotta Inc.ProposedContested
- JPMorgan Chase Data Center, OrangeburgOrangeburg, Rockland Co. · JPMorgan ChaseOperatingContested
- Niagara Digital CampusNiagara Falls, Niagara Co. · Urbacon Data Centre SolutionsProposed135 MWMixed reception
- 9LDG Niagara AI Data CenterNiagara Falls, Niagara Co. · 9 Lives Digital Group (9LDG)ProposedSupported
- TeraWulf Lake MarinerBarker, Niagara Co. · TeraWulfOperating750 MW
- Coinmint (Massena East / former Alcoa Smelter)Massena, St. Lawrence Co. · CoinmintOperating435 MW
- Turin Hoefler Avenue AI Data Center (former Remington Arms plant, Site C)Ilion, Herkimer Co. · Turin Hoefler Avenue LLCProposed200 MW
- Bloomberg LP Data CenterOrangeburg, Rockland Co. · Bloomberg LPOperating50 MW
- Digihost, Erie County (Buffalo)Buffalo, Erie Co. · Digihost (Digi Power X)Operating42 MW
- DataBank LGA3 (Orangeburg Data Center Campus)Orangeburg, Rockland Co. · DataBankOperating40 MW
- SDC Manhattan (Intergate.Manhattan), 375 Pearl StreetNew York, New York Co. · Sabey Data CentersOperating18 MW
- 60 Hudson StreetNew York, New York Co. · Multi-tenant carrier hotel (Hudson Interxchange, Digital Realty, DataBank, Equinix, and 100+ telecom tenants)Operating15 MW
- H5 Data Centers Buffalo I (formerly Yahoo Lockport)Lockport, Niagara Co. · H5 Data CentersOperating15 MW
- Coinmint Plattsburgh (Skyway Plaza)Plattsburgh, Clinton Co. · CoinmintOperating10 MW
- H5 Data Centers Buffalo IILockport, Niagara Co. · H5 Data CentersOperating7.2 MW
- 32 Avenue of the AmericasNew York, New York Co. · Multi-tenant carrier hotel (Digital Realty, CoreSite, and other carrier/telecom tenants)Operating
- 325 Hudson StreetNew York, New York Co. · Netrality Properties (JV with Jamestown, LP); H5 Data Centers operates colocation space in the buildingOperating
- Digital Realty JFK10 (111 Eighth Avenue)New York, New York Co. · Digital RealtyOperating
- Empire AI BetaBuffalo, Erie Co. · Empire AI consortium (hosted by the University at Buffalo, SUNY)Operating
- Empire AI GammaBuffalo, Erie Co. · Empire AI consortium (hosted by the University at Buffalo, SUNY)Under construction
- Equinix NY9New York, New York Co. · EquinixOperating
- Kenwood Commons Technology CampusAlbany, Albany Co. · Guild VenturesProposed
- Lumen Albany 4Albany, Albany Co. · Lumen TechnologiesOperating
- Rochester ColoPittsford, Monroe Co. · Rochester Colo (James Salviski)Operating
- Telehouse New York (Staten Island Teleport)Staten Island, Richmond Co. · Telehouse America (KDDI)Operating
- Telehouse New York Chelsea (85 10th Avenue)New York, New York Co. · Telehouse America (KDDI)Operating
- TierPoint Hawthorne (11 & 17 Skyline Drive)Hawthorne, Westchester Co. · TierPointOperating
North Carolina
43 sites · 16 contested
- Project Delta Data Center, Stokes CountyWalnut Cove, Stokes Co. · Undisclosed (rezoning applicant: Engineered Land Solutions)ProposedIn litigation
- Project Accelerate, Matthews (East John Street)Matthews, Mecklenburg Co. · Crosland SoutheastCancelled600 MWOpposed
- Natelli New Hill Digital CampusNew Hill, Wake Co. · Natelli HoldingsCancelled300 MWOpposed
- PRSM Group Cumberland County AI Data Center (undisclosed industrial park)Cumberland Co. · PRSM GroupProposed225 MWOpposed
- Flexential Salisbury (Henderson Grove Church Road)Salisbury, Rowan Co. · FlexentialProposed55 MWOpposed
- Long Ferry Road Data Center Campus (Rowan County)Rowan Co. · Undisclosed developerProposedOpposed
- PrimeBlock Murphy Bitcoin Mine (Harshaw Road)Murphy, Cherokee Co. · PrimeBlockOperatingOpposed
- Radius DC Raleigh IRaleigh, Wake Co. · Undisclosed (annexation petitioner: Radius DC Raleigh I)ProposedOpposed
- Compass Statesville CampusStatesville, Iredell Co. · Compass DatacentersProposed500 MWContested
- Digital Realty Moores Chapel Data Center CampusCharlotte, Mecklenburg Co. · Digital RealtyPermitted400 MWContested
- PowerHouse Charlotte CampusCharlotte, Mecklenburg Co. · PowerHouse Data CentersUnder construction300 MWContested
- American Tower Reedy Creek Data Center (East Charlotte)Charlotte, Mecklenburg Co. · American TowerProposedContested
- Microsoft Person County Mega ParkRoxboro, Person Co. · MicrosoftPermittedContested
- Natelli Vance County Campus (proposed)Henderson, Vance Co. · Natelli InvestmentsProposedContested
- Rural Hall Data Center (The Drox Group)Rural Hall, Forsyth Co. · The Drox GroupCancelledContested
- Terra Nexus Custer Avenue Data Center (Fayetteville)Fayetteville, Cumberland Co. · Terra Nexus VenturesProposedContested
- PointOne Lower Moncure Road Data Center (Lee County)Sanford, Lee Co. · PointOneProposed90 MWMixed reception
- Project Q, Quiet Data Centers Enfield (Halifax County)Enfield, Halifax Co. · Quiet Data Centers Halifax Inc.Proposed88 MWMixed reception
- Terra Nexus Rockingham Data Center (Old Cheraw Highway)Rockingham, Richmond Co. · Terra Nexus Land Fund I, LLCProposedMixed reception
- Kingsboro AI Data Center CampusRocky Mount, Edgecombe Co. · Energy Storage SolutionsPermitted900 MWSupported
- WhiteFiber NC-1 AI Data Center CampusMadison, Rockingham Co. · WhiteFiber (Bit Digital)Operating200 MWSupported
- Amazon Web Services Richmond County Data Center CampusRockingham, Richmond Co. · Amazon Web ServicesUnder constructionSupported
- Meta Forest City Data CenterForest City, Rutherford Co. · MetaOperatingSupported
- Core Scientific Marble Data CenterMarble, Cherokee Co. · Core ScientificOperating65 MW
- ImpactData GreensboroGreensboro, Guilford Co. · ImpactDataUnder construction20 MW
- Flexential Charlotte - South (CLT01/02/03)Charlotte, Mecklenburg Co. · FlexentialOperating2.36 MW
- Advanced Internet Technologies (AIT) Fayetteville Data CenterFayetteville, Cumberland Co. · Advanced Internet Technologies, Inc.Operating
- Apple Maiden Data Center (iCloud)Maiden, Catawba Co. · AppleOperating
- Deep River Data AI Data Center (Cumnock, Lee County)Cumnock, Lee Co. · Deep River DataProposed
- Energy Storage Solutions Fayetteville AI Data Center CampusFayetteville, Cumberland Co. · Energy Storage SolutionsProposed
- Flexential Charlotte - North (CLT04/05)Charlotte, Mecklenburg Co. · FlexentialOperating
- Flexential Raleigh (RAL02/RAL03)Morrisville, Wake Co. · FlexentialOperating
- Google Lenoir Data CenterLenoir, Caldwell Co. · GoogleOperating
- Microsoft Conover Data CenterConover, Catawba Co. · MicrosoftUnder construction
- Microsoft Hickory Data CenterHickory, Catawba Co. · MicrosoftUnder construction
- Microsoft Maiden Data CenterMaiden, Catawba Co. · MicrosoftUnder construction
- Mooresville CampusMooresville, Iredell Co. · TractCancelled
- Plan C Crypto Fayetteville (Dedication Drive)Fayetteville, Cumberland Co. · Plan C CryptoOperating
- Segra Charlotte Data Center (International Airport Drive)Charlotte, Mecklenburg Co. · SegraOperating
- Segra Raleigh Data Center (Garner Station Boulevard)Raleigh, Wake Co. · SegraOperating
- Segra Winston-Salem Data CenterWinston-Salem, Forsyth Co. · SegraOperating
- T5@CharlotteKings Mountain, Cleveland Co. · T5 Data CentersOperating
- TierPoint Charlotte - Center ParkCharlotte, Mecklenburg Co. · TierPointOperating
North Dakota
9 sites · 4 contested
- Atlas Power Data Center (Williston)Williston, Williams Co. · Atlas PowerOperating700 MWIn litigation
- Applied Digital Polaris Forge 3Hanover, Oliver Co. · Applied Digital CorporationProposed430 MWContested
- Applied Digital Polaris Forge 2Harwood, Cass Co. · Applied Digital CorporationUnder construction280 MWContested
- Enerfore Pleasant Valley Data CenterTioga, Williams Co. · Enerfore DigitalUnder construction30 MWContested
- Applied Digital Polaris Forge 1Ellendale, Dickey Co. · Applied Digital CorporationUnder construction400 MWSupported
- Bitzero Nekoma Data Center (Stanley R. Mickelsen Safeguard Complex)Nekoma, Cavalier Co. · BitzeroOperating300 MW
- Applied Digital Jamestown FacilityJamestown, Stutsman Co. · Applied Digital CorporationOperating106 MW
- Core Scientific Grand Forks Data Center (Grand Forks 1)Grand Forks, Grand Forks Co. · Core ScientificOperating100 MW
- Greenidge Underwood (North Dakota)Underwood, McLean Co. · Greenidge GenerationOperating7.5 MW
Ohio
99 sites · 25 contested
- Bitdeer Clarington HPC/AI CampusClarington, Monroe Co. · BitdeerUnder construction570 MWIn litigation
- Amazon Web Services Wilmington Data Center CampusWilmington, Clinton Co. · Amazon Web ServicesProposedIn litigation
- Bristolville 25Lordstown, Trumbull Co. · Bristolville 25 Developer LLC / BHGH PropertiesProposedIn litigation
- Project DazzlerFranklin Furnace, Scioto Co. · GooglePermittedIn litigation
- East 55th Street Data Center (Slavic Village)Cleveland, Cuyahoga Co. · Lakeland Equity GroupCancelled150 MWOpposed
- Ashville CampusAshville, Pickaway Co. · EdgeConneXProposedOpposed
- PRSM Preble County Data Center CampusMonroe Township, Preble Co. · PRSM GroupCancelledOpposed
- Saadia Holding Athens-Dover Township Data CenterThe Plains, Athens Co. · Saadia Holding LLCProposedOpposed
- SR-14 Data Center Proposal (Ravenna)Ravenna, Portage Co. · Ray Harner (landowner-developer)ProposedOpposed
- AWS Project Galaxy, Sidney, OHSidney, Shelby Co. · Amazon Web ServicesUnder construction1.5 GWContested
- AWS Sprigg Township Data Center Campus (Buck Canyon)Manchester, Adams Co. · Amazon Web Services (land held via Buck Canyon Properties)Permitted1.3 GWContested
- Bitdeer Shalersville Data Center CampusShalersville Township, Portage Co. · BitdeerProposed750 MWContested
- Oregon Industrial Park Data Center CampusOregon, Lucas Co. · Capacity LLC (Vantage Data Centers named as prospective developer)Proposed500 MWContested
- Prologis Project MilaTrenton, Butler Co. · PrologisPermitted250 MWContested
- Bitdeer Massillon FacilityMassillon, Stark Co. · BitdeerOperating221 MWContested
- Aligned Data Centers, PataskalaPataskala, Licking Co. · Aligned Data CentersCancelled200 MWContested
- Cologix COL5Lewis Center, Delaware Co. · CologixUnder construction75 MWContested
- Ardent Technologies Wilmington Data CenterWilmington, Clinton Co. · Ardent TechnologiesProposedContested
- AWS Cosgray Road CampusHilliard, Franklin Co. · Amazon Web ServicesOperatingContested
- AWS Trenton / Madison-St. Clair Township CampusTrenton, Butler Co. · Amazon Web ServicesProposedContested
- Hamilton Innovation CenterHamilton, Butler Co. · Logistix Property GroupProposedContested
- Hanging Rock / Haverhill Data CenterHanging Rock, Lawrence Co. · Strata Expense (backed by Supermicro + Ravel)Under constructionContested
- Mount Orab Mega-Site Data Center CampusMount Orab, Brown Co. · DB Stu LLCProposedContested
- Project KlondikePiqua, Miami Co. · MetaPermittedContested
- Whitetail Creek Data CenterNiles / Weathersfield Township, Trumbull Co. · BitdeerProposedContested
- PORTS-Pike Technology CampusPiketon, Pike Co. · SB EnergyUnder construction10 GWMixed reception
- Meta PrometheusNew Albany, Licking Co. · MetaUnder construction1 GWMixed reception
- Cologix Johnstown AI-Ready CampusJohnstown, Licking Co. · CologixUnder construction800 MWMixed reception
- Amazon Perry Township Data CenterCanton, Stark Co. · Amazon Web ServicesUnder construction240 MWMixed reception
- 5C Group / Vultr Data Center (Prime Ohio)Springfield, Clark Co. · 5C Group (Hypertec Cloud + 5C Data Centers); tenant Vultr (The Constant Company, LLC)Under construction150 MWMixed reception
- AWS Industrial Parkway Campus (Jerome Township)Plain City, Union Co. · Amazon Web ServicesOperatingMixed reception
- AWS Warner Road Campus (Jerome Township)Plain City, Union Co. · Amazon Web ServicesOperatingMixed reception
- Google Project BOSC (Lima)Lima, Allen Co. · GooglePermittedMixed reception
- Meta Bowling Green (Project Accordion)Bowling Green, Wood Co. · MetaUnder constructionMixed reception
- Stargate Lordstown CampusLordstown, Trumbull Co. · OpenAI / SoftBank / OracleUnder construction1.5 GWSupported
- Aligned Data Centers, Conesville Industrial ParkConesville, Coshocton Co. · Aligned Data CentersUnder construction340 MWSupported
- Vantage Data Centers OH1Johnstown, Licking Co. · Vantage Data CentersUnder construction192 MWSupported
- Microsoft Heath Data CenterHeath, Licking Co. · MicrosoftUnder constructionSupported
- Microsoft Hebron Data CenterHebron, Licking Co. · MicrosoftUnder constructionSupported
- Vantage Data Centers OH2 (Millersport Campus)Millersport, Fairfield Co. · Vantage Data CentersUnder construction696 MW
- EdgeConneX MCN New Albany (South Campus)New Albany, Licking Co. · EdgeConneXUnder construction224 MW
- Cipher Digital UlyssesMorgan Co. · Cipher Digital (formerly Cipher Mining)Proposed200 MW
- HashWorks Powered Land, Waterford SiteWashington Co. · HashWorks Powered Land Waterford LLC (land entity tied to Cipher Digital / Sabre 56)Proposed200 MW
- BIT Mining / Viking Data Centers, AkronAkron, Summit Co. · BIT Mining / Viking Data CentersOperating150 MW
- MARA Findlay Data CenterFindlay, Hancock Co. · MARA HoldingsUnder construction150 MW
- QTS New Albany 1New Albany, Licking Co. · QTS Data CentersUnder construction144 MW
- Aligned NEO-01Sandusky (Perkins Township), Erie Co. · Aligned Data CentersUnder construction96 MW
- QTS New Albany 2New Albany, Licking Co. · QTS Data CentersUnder construction78 MW
- STACK Infrastructure NAL01 (New Albany)New Albany, Franklin Co. · STACK InfrastructureOperating60 MW
- Standard Power CoshoctonCoshocton, Coshocton Co. · Standard PowerOperating50 MW
- Edged ColumbusNew Albany, Franklin Co. · Edged (an Endeavour company)Operating24 MW
- Cologix COL3 (Columbus)Columbus, Franklin Co. · CologixOperating18 MW
- CyrusOne CIN2 (Cincinnati)Cincinnati, Hamilton Co. · CyrusOneOperating14 MW
- Expedient CMH3 (Lewis Center)Lewis Center, Delaware Co. · ExpedientOperating7 MW
- Cogent Data Center AkronAkron, Summit Co. · Cogent CommunicationsOperating5 MW
- Expedient CMH2 (Dublin)Dublin, Franklin Co. · ExpedientOperating4.8 MW
- AgriFORCE Bitcoin Mining Facility, West PointWest Point, Columbiana Co. · AgriFORCE Growing Systems Ltd.Operating3 MW
- Lumen Akron 2Akron, Summit Co. · Lumen TechnologiesOperating3 MW
- AgriFORCE Bitcoin Mining Facility, East PalestineEast Palestine, Columbiana Co. · AgriFORCE Growing Systems Ltd.Operating2 MW
- Expedient CMH1 (Upper Arlington)Upper Arlington, Franklin Co. · ExpedientOperating1.6 MW
- Iron Mountain OHS-1 (Miamisburg)Miamisburg, Montgomery Co. · Iron MountainOperating1.4 MW
- Ark Data Centers Akron I (fka Involta)Akron, Summit Co. · Ark Data Centers (formerly Involta)Operating1 MW
- Ark Data Centers Akron II (fka Involta)Akron, Summit Co. · Ark Data Centers (formerly Involta)Operating1 MW
- DataBank Cleveland (CLE1)Cleveland, Cuyahoga Co. · DataBankOperating0.4 MW
- Aligned HPC Campus at Former Pixelle Paper Mill (Chillicothe)Chillicothe, Ross Co. · Aligned Data Centers (in partnership with U.S. Paper Mill LLC / U.S. Medical Glove Company)Proposed
- Ark Data Centers Independence (fka Involta)Independence, Cuyahoga Co. · Ark Data Centers (formerly Involta)Operating
- AWS Crosby Court CampusPlain City, Franklin Co. · Amazon Web ServicesOperating
- AWS Fayette County (Jefferson Township)Jeffersonville, Fayette Co. · Amazon Web ServicesUnder construction
- AWS Hayden Run CampusHilliard, Franklin Co. · Amazon Web ServicesOperating
- AWS New Albany (2550 Beech Road)New Albany, Licking Co. · Amazon Web ServicesOperating
- AWS New Albany (3180 Beech Road)New Albany, Licking Co. · Amazon Web ServicesOperating
- AWS New Albany (Beech/Miller Road Campus)New Albany, Licking Co. · Amazon Web ServicesUnder construction
- AWS New Albany (Newton Court)New Albany, Licking Co. · Amazon Web ServicesOperating
- AWS Project CosmosMarysville, Union Co. · Amazon Web ServicesUnder construction
- AWS Scioto Darby CampusHilliard, Franklin Co. · Amazon Web ServicesOperating
- AWS Wilmington Data Center CampusWilmington, Clinton Co. · Amazon Web ServicesProposed
- Cologix COL1 (Columbus)Columbus, Franklin Co. · CologixOperating
- Cologix COL2 (Columbus)Columbus, Franklin Co. · CologixOperating
- Cologix COL4 (Columbus)Columbus, Franklin Co. · CologixOperating
- CyrusOne CIN3 (Cincinnati-Mason)Mason, Warren Co. · CyrusOneOperating
- CyrusOne New Albany COL-1Johnstown, Licking Co. · CyrusOneUnder construction
- DataYard Dayton Data CenterDayton, Montgomery Co. · DataYardOperating
- Encore Technologies BLU1 (Blue Ash)Blue Ash, Hamilton Co. · Encore TechnologiesOperating
- Expedient Cleveland (NEO 151 / NEO 152)Garfield Heights, Cuyahoga Co. · ExpedientOperating
- Flexential Cincinnati (CIN01/02)West Chester Township, Butler Co. · FlexentialOperating
- Google Lancaster Data CenterLancaster, Fairfield Co. · GoogleOperating
- Google New Albany Data CenterNew Albany, Franklin Co. · GoogleOperating
- H5 Data Centers Cincinnati ICincinnati, Hamilton Co. · H5 Data CentersOperating
- H5 Data Centers ClevelandCleveland, Cuyahoga Co. · H5 Data CentersOperating
- Lumen Cincinnati 1 (400 Pike Street)Cincinnati, Hamilton Co. · Lumen TechnologiesOperating
- Lumen Cleveland 1Cleveland, Cuyahoga Co. · Lumen TechnologiesOperating
- MARA Hannibal Data CenterHannibal, Monroe Co. · MARA HoldingsOperating
- MARA Hopedale Data CenterHopedale, Harrison Co. · MARA HoldingsOperating
- QTS New Albany IIINew Albany, Franklin Co. · QTS Data CentersUnder construction
- QTS New Albany IVNew Albany, Licking Co. · QTS Data CentersPermitted
- QTS Van Wert Data Center CampusVan Wert, Van Wert Co. · QTS Data CentersProposed
- Racksquared Data Center (Columbus)Columbus, Franklin Co. · Racksquared Data Centers, LLCOperating
- State of Ohio Computer Center (SOCC)Columbus, Franklin Co. · State of OhioOperating
- T5@ClevelandCleveland, Cuyahoga Co. · T5 Data CentersOperating
Oklahoma
43 sites · 6 contested
- Cloverleaf Project Open SkyPiedmont, Canadian Co. · Cloverleaf InfrastructureProposed1.5 GWContested
- Beltline Energy Piedmont SitePiedmont, Kingfisher Co. · Beltline EnergyProposedContested
- Fluidstack Okmulgee County Data CenterOkmulgee, Okmulgee Co. · FluidstackProposedContested
- Google Stillwater Data Center CampusStillwater, Payne Co. · GoogleUnder constructionContested
- Meta Project Anthem, TulsaTulsa, Tulsa Co. · MetaUnder constructionContested
- Project Spring (Sand Springs)Sand Springs, Osage Co. · GoogleProposedContested
- Potentia Oklahoma Campus 02 (Inola)Inola, Rogers County Co. · Potentia, Inc.Proposed2 GWMixed reception
- Polaris Technologies Muskogee Bitcoin Mining Facility ("Project Bifrost")Muskogee, Muskogee Co. · Polaris Technologies, Inc.Operating400 MWMixed reception
- Google Pryor Data Center Campus (Mayes County Expansion)Pryor, Mayes Co. · GoogleOperatingMixed reception
- Core Scientific Muskogee CampusMuskogee, Muskogee Co. · Core ScientificUnder construction1 GWSupported
- Cerebras Oklahoma City Data CenterOklahoma City, Oklahoma Co. · Cerebras SystemsOperating10 MWSupported
- Beltline Energy Oklahoma City CampusOklahoma City, Oklahoma Co. · Beltline EnergyProposedSupported
- Google Muskogee County Data Center CampusesCouncil Hill, Muskogee Co. · GoogleProposedSupported
- Project ClydesdaleOwasso, Tulsa Co. · Beale InfrastructureUnder constructionSupported
- IREN Woods County CampusAlva, Woods Co. · IREN (Iris Energy)Proposed1.6 GW
- CloudBurst Oklahoma City CampusOklahoma City, Oklahoma Co. · CloudBurst Data CentersProposed200 MW
- Host Digital Northeast Oklahoma Data CenterTulsa · Host Digital Infrastructure LLCOperating43 MW
- Pawhuska AI Data CenterPawhuska, Osage Co. · Buckley Bros Holdings LLCProposed10 MW
- American Tower EDC Oklahoma (Oklahoma City)Oklahoma City, Oklahoma County Co. · American TowerProposed4 MW
- ValorC3 Oklahoma City Data CenterOklahoma City, Oklahoma County Co. · ValorC3 Data CentersOperating1.25 MW
- ENGUARD Data Center (Jackson Technical)Tulsa, Tulsa County Co. · Jackson TechnicalOperating0.4 MW
- Black Bear AI Data Center CampusPerry, Noble County Co. · Oklahoma AI Ventures LLC (Jericho Energy Ventures / Comstock Holding Companies JV)Proposed
- Boomtown Lawton Data Center, cancelledLawton, Comanche Co. · BoomtownCancelled
- Cherokee Data Center (Tulsa)Tulsa, Tulsa County Co. · Hewlett-PackardOperating
- Cogent Oklahoma City Data CenterOklahoma City, Oklahoma County Co. · Cogent CommunicationsOperating
- Isocentric Networks Tulsa Data CenterTulsa, Tulsa Co. · Isocentric NetworksOperating
- Luther Horizon Technology ParkLuther, Oklahoma Co. · Beltline EnergyProposed
- MIDCON Recovery Solutions Data CenterOklahoma City, Oklahoma County Co. · MIDCON Recovery SolutionsOperating
- Northern Data North American Operational Center (Pryor), cancelledPryor, Mayes Co. · Northern Data AGCancelled
- OCOSA Communications Tulsa Data Center (321 S Boston)Tulsa, Tulsa County Co. · OCOSA CommunicationsOperating
- Philcade Data CenterTulsa, Tulsa County Co. · Kanbar PropertiesOperating
- Project Atlas (Coweta), withdrawnCoweta, Wagoner Co. · Beale InfrastructureCancelled
- Project MustangClaremore, Rogers Co. · Beale InfrastructureProposed
- RACK59 Data CenterOklahoma City, Oklahoma Co. · RACK59Operating
- TierPoint Oklahoma City (OKC / OKC2)Oklahoma City, Oklahoma Co. · TierPointOperating
- TierPoint Tulsa - ArcherTulsa, Tulsa Co. · TierPointOperating
- TierPoint Tulsa - State FarmTulsa, Tulsa Co. · TierPointOperating
- Tulsa Technology ExchangeTulsa, Tulsa County Co. · Facility Gateway CorporationOperating
- TulsaConnect Downtown (DC-5)Tulsa, Tulsa Co. · TulsaConnectOperating
- TulsaConnect East (DC-3)Tulsa, Tulsa Co. · TulsaConnectOperating
- TulsaConnect Tulsa Data Center (DC-1)Tulsa, Tulsa County Co. · TulsaConnectOperating
- TulsaConnect Tulsa Data Center (DC-2)Tulsa, Tulsa County Co. · TulsaConnectOperating
- Windstream Wholesale Oklahoma City Data CenterOklahoma City, Oklahoma County Co. · WindstreamOperating
Oregon
42 sites · 5 contested
- Roundhouse Cascade Locks Data CenterCascade Locks, Hood River Co. · Roundhouse Digital InfrastructureCancelled30 MWOpposed
- Boxminer La Pine Bitcoin Mining FacilityLa Pine, Deschutes Co. · Boxminer (Hidden Pines LLC)Cancelled20 MWOpposed
- Google The Dalles Data Center CampusThe Dalles, Wasco Co. · GoogleOperating300 MWContested
- Crane PDX01Forest Grove, Washington Co. · Crane Data CentersUnder construction76 MWContested
- CoreSite Hillsboro Data Campus (HI1/HI2)Hillsboro, Washington Co. · CoreSiteProposedContested
- Amazon Boardman Exascale Data Center CampusBoardman, Morrow Co. · Amazon Web ServicesProposed1 GWMixed reception
- Meta Prineville Data Center CampusPrineville, Crook Co. · MetaOperating400 MWMixed reception
- Oakline at Mill CreekSalem, Marion Co. · VerrusProposedMixed reception
- SDC Umatilla CampusUmatilla, Umatilla Co. · Sabey Data CentersUnder construction150 MWSupported
- Percheron Data CenterBoardman area (Tower Road), Morrow Co. · Rowan Green Data (DBA Rowan Digital Infrastructure)Under construction300 MW
- STACK POR03Hillsboro, Washington Co. · STACK InfrastructureOperating200 MW
- QTS Hillsboro 2Hillsboro, Washington Co. · QTS Data CentersOperating180 MW
- STACK Hillsboro CampusHillsboro, Washington Co. · STACK InfrastructureProposed75 MW
- Crane PDX02Forest Grove, Washington Co. · Crane Data CentersUnder construction48 MW
- STACK POR01Hillsboro, Washington Co. · STACK InfrastructureOperating40 MW
- Flexential Portland - Hillsboro 3Hillsboro, Washington Co. · FlexentialOperating36 MW
- Flexential Portland - Hillsboro 5Hillsboro, Washington Co. · FlexentialOperating36 MW
- NTT Hillsboro HI1 Data CenterHillsboro, Washington Co. · NTT Global Data CentersOperating36 MW
- Flexential Portland - Hillsboro 6Hillsboro, Washington Co. · FlexentialProposed27 MW
- STACK POR02Hillsboro, Washington Co. · STACK InfrastructureOperating24 MW
- QTS Hillsboro 1Hillsboro, Washington Co. · QTS Data CentersOperating20 MW
- Flexential Portland - Hillsboro 2Hillsboro, Washington Co. · FlexentialOperating18 MW
- Flexential Portland - Hillsboro 4 (PDX04)Hillsboro, Washington Co. · FlexentialOperating18 MW
- Pittock Block (PTOR1)Portland, Multnomah Co. · 1547 Critical Systems RealtyOperating8 MW
- Oracle Hillsboro Data CenterHillsboro, Washington Co. · OracleOperating7 MW
- Flexential Portland - Hillsboro 1 (PDX01)Hillsboro, Washington Co. · FlexentialOperating5.3 MW
- DMG Blockchain Boardman FacilityBoardman, Morrow Co. · DMG Blockchain SolutionsProposed3.75 MW
- Abundant Mines, Cascade Locks FacilityCascade Locks, Hood River Co. · Abundant Mines (Good Life Realty LLC)Operating
- Aligned PDX-01Hillsboro, Washington Co. · Aligned Data CentersOperating
- Apple Prineville Data Center CampusPrineville, Crook Co. · AppleOperating
- AWS Arlington Data Center CampusArlington, Gilliam Co. · Amazon Web ServicesProposed
- AWS Hermiston Data Center CampusesHermiston, Umatilla Co. · Amazon Web ServicesOperating
- AWS PDX 154 (Boardman Airport Campus)Boardman, Morrow Co. · Amazon Web ServicesPermitted
- AWS Umatilla Data Center CampusUmatilla, Umatilla Co. · Amazon Web ServicesOperating
- Digital Realty PDX10Hillsboro, Washington Co. · Digital RealtyOperating
- Digital Realty PDX11Hillsboro, Washington Co. · Digital RealtyOperating
- Digital Realty PDX12Hillsboro, Washington Co. · Digital RealtyOperating
- EdgeConneX POR01/POR02 (Hillsboro campus)Hillsboro, Washington Co. · EdgeConneXOperating
- Google The Dalles Data Center, 3500 River Road (Port of The Dalles)The Dalles, Wasco Co. · GoogleUnder construction
- H5 Data Centers PortlandPortland, Multnomah Co. · H5 Data CentersOperating
- QTS Hillsboro 3Hillsboro, Washington Co. · QTS Data CentersUnder construction
- US Signal OR01 BendBend, Deschutes Co. · US SignalOperating
Pennsylvania
59 sites · 20 contested
- TECfusions Keystone ConnectUpper Burrell Township, Westmoreland Co. · TECfusionsProposed3 GWIn litigation
- Gouldsboro Data Center Campus (Project Gold)Clifton Township, Lackawanna Co. · 1778 Rich Pike LLCProposed1.5 GWIn litigation
- Sentinel East Whiteland Data CenterEast Whiteland Township, Chester Co. · Sentinel Data CentersUnder construction300 MWIn litigation
- Pennhurst Data Center CampusSpring City, Chester Co. · Penn Hurst HoldingsProposedIn litigation
- Powder Mills Data Center CampusLawrence Co. · Stonebridge AssociatesProposedIn litigation
- Project HazelnutHazle Township, Luzerne Co. · NorthPoint Development (NP Hazleton Holdings 1 LLC)ProposedIn litigation
- Triboro Industrial Park / Triboro Commerce ParkJessup / Olyphant, Lackawanna Co. · Ercor Triboro LLC (Sansone Group)PermittedIn litigation
- Limerick Township Data Center Campus (MCD 7)Limerick Township, Montgomery Co. · MCD 7 LLCProposed750 MWOpposed
- MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant)Conshohocken, Montgomery Co. · MLP VenturesProposedOpposed
- Renaissance Park and Innovation Data Center CampusKing of Prussia, Montgomery Co. · MLP VenturesProposedOpposed
- South Annville Township Data Center Campus (withdrawn)South Annville Township, Lebanon Co. · Inch & Co. / Eastern Land & Resources Co. (1235 Martina Drive Owner)CancelledOpposed
- Wildcat Ridge AI Data Center CampusArchbald, Lackawanna Co. · Cornell Realty ManagementProposed1.6 GWContested
- PAX, Pennsylvania Digital ICarlisle, Cumberland Co. · PowerHouse Data CentersUnder construction1.4 GWContested
- Breaker Street Data Center CampusJessup, Lackawanna Co. · Breaker Street Associates LLC (Catalyst Commercial Development)Proposed600 MWContested
- CoreWeave Lancaster Data CenterLancaster, Lancaster Co. · CoreWeaveProposed300 MWContested
- Springdale Data Center (former Cheswick Generating Station)Springdale, Allegheny Co. · Allegheny DC Property Co., LLCPermitted180 MWContested
- Big Beaver CampusBig Beaver, Beaver Co. · SwitchProposedContested
- Cetronia Road Data Center (former Air Products site)Trexlertown, Lehigh Co. · Air ProductsCancelledContested
- Muncy Data CenterMuncy, Lycoming Co. · Danko Holdings IIPermittedContested
- York 2 Energy Center Data CenterPeach Bottom Township, York Co. · Energy Capital PartnersProposedContested
- Homer City Energy CampusHomer City, Indiana Co. · Homer City RedevelopmentUnder construction4.5 GWMixed reception
- Shippingport Industrial ParkShippingport, Beaver Co. · Aligned Data CentersUnder construction2 GWMixed reception
- AWS Cumulus Data Center Campus, Salem TownshipSalem Township, Luzerne Co. · Amazon Web ServicesUnder construction960 MWMixed reception
- Amazon Web Services Innovation Campus, Falls TownshipFalls Township, Bucks Co. · Amazon Web ServicesUnder constructionMixed reception
- Project GravityArchbald, Lackawanna Co. · Archbald 25 Developer LLCProposedMixed reception
- Stowe Township Data Center (former railcar plant)Stowe Township, Allegheny Co. · SunCap IndustriesProposedMixed reception
- Zediker Station Data Center SiteSouth Strabane Township, Washington Co. · CNX ResourcesProposedSupported
- 4-3 Glenbrook Group Salem Township Data Center Campus (Salem 3)Salem Township, Luzerne Co. · 4-3 Glenbrook GroupProposed3.5 GW
- Scrubgrass Generating PlantKennerdell, Venango Co. · Bitfarms Ltd. (Keel Infrastructure Corp.)Operating1.3 GW
- Mudiita Ransom Township Data Center CampusRansom Township, Lackawanna Co. · Mudiita Land Venture LLCCancelled750 MW
- Aliquippa Data Center (former J&L Steel site)Aliquippa, Beaver Co. · Five 9s DigitalProposed496 MW
- Panther Creek HPC/AI Data Center CampusNesquehoning, Carbon Co. · Bitfarms Ltd.Under construction350 MW
- Panther Creek PlantNesquehoning, Carbon Co. · Bitfarms Ltd. (Keel Infrastructure Corp.)Operating350 MW
- Big Digital Energy Midland FacilityMidland, Beaver Co. · Big Digital EnergyOperating120 MW
- Bitfarms Sharon Facility (former Westinghouse plant)Sharon, Mercer Co. · Bitfarms Ltd. (Keel Infrastructure Corp.)Operating110 MW
- Iron Mountain WPA-1 (Boyers underground data center)Boyers, Butler Co. · Iron MountainOperating40 MW
- Ardent Data Centers Pittsburgh (McKees Rocks)McKees Rocks, Allegheny Co. · Ardent Data Centers (Northern Data Group)Operating20 MW
- DataBank PIT2 (Summit Park)Pittsburgh, Allegheny Co. · DataBankOperating5 MW
- DataBank PIT1 (Downtown Pittsburgh)Pittsburgh, Allegheny Co. · DataBankOperating1.9 MW
- Expedient PIT1 (Green Tree / Pittsburgh South)Pittsburgh, Allegheny Co. · ExpedientOperating1.8 MW
- AWS Kline Township Data Center CampusKline Township, Schuylkill Co. · Amazon Web ServicesProposed
- Big Digital Energy Bellefonte FacilityBellefonte, Centre Co. · Big Digital EnergyOperating
- Eynon Jermyn Road Data Center Campus (former auto salvage yard)Archbald, Lackawanna Co. · Five Up Realty LLCProposed
- Fairview Crossroads Data CenterFairview Township, York Co. · Elysian PartnersProposed
- Flexential Allentown Data Center (ABE01)Allentown, Lehigh Co. · FlexentialOperating
- Flexential Philadelphia - Collegeville (PHL01)Collegeville, Montgomery Co. · FlexentialOperating
- Iron City Wells A.I. Data CenterKarthaus Township, Clearfield Co. · Iron City Wells, LLCPermitted
- Longhorn Pad A Wellhead Bitcoin MineHorton Township, Elk Co. · Diversified Production LLCOperating
- Lumen NorristownNorristown, Montgomery Co. · Lumen TechnologiesOperating
- Nautilus Cryptomine - Building 1Berwick (Salem Township), Luzerne Co. · Talen EnergyOperating
- Netrality 401 North BroadPhiladelphia, Philadelphia Co. · Netrality Data CentersOperating
- Nova Energy Natural Gas-Powered Cryptomine (Frenchcreek Township)Venango Co. · Nova Energy LLCOperating
- Project Atlas Data Center Campus (South Whitehall Township)South Whitehall Township, Lehigh Co. · CDE Acquisitions, LLCProposed
- Prologis Allen Township Data Center (2500 Liberty Drive)Allen Township, Northampton Co. · PrologisPermitted
- QTS Salem Township Data Center Campus (Salem 2)Salem Township, Luzerne Co. · QTS Data CentersProposed
- Slate Belt Holdings Data Center Campus (Upper Mount Bethel)Upper Mount Bethel Township, Northampton Co. · Slate Belt Holdings LLC (Talen Energy / River Pointe Logistics joint venture)Proposed
- Talen Energy Montour Data Center CampusWashingtonville, Montour Co. · Talen EnergyProposed
- TierPoint Allentown TekParkBreinigsville, Lehigh Co. · TierPointOperating
- TierPoint Valley ForgeNorristown, Montgomery Co. · TierPointOperating
Rhode Island
1 sites · 1 contested
- Hanton City Business Park (data center anchor)Smithfield, Providence Co. · Hanton City Investments LLCProposedOpposed
South Carolina
20 sites · 4 contested
- Project Altair (Mid-Carolina Commerce Park II)Prosperity, Newberry Co. · Undisclosed developer (Project Altair)CancelledOpposed
- Project Liberty (Stream Data Centers, Marion County Industrial Park)Marion, Marion Co. · Stream Data Centers (site entity: Eagle Myra, LLC)CancelledOpposed
- Project BoulderColleton Co. · Eagle Rock PartnersProposed1 GWContested
- Project Alpaca (Midway Green Industrial Park)Union, Union Co. · Volt Edge EnergyProposed49 MWContested
- Meta Aiken Data CenterGraniteville, Aiken Co. · MetaUnder construction200 MWSupported
- DartPoints Greenville Data CenterGreenville, Greenville Co. · DartPointsOperating12.5 MWSupported
- Google Ridgeville Data Center (Project Dawson)Ridgeville, Dorchester Co. · GoogleUnder constructionSupported
- Savannah River Site AI Data Center (Amentum)Barnwell Co. · AmentumProposed1 GW
- NorthMark Strategies Spartanburg High-Performance Computing CenterSpartanburg, Spartanburg Co. · Valara Holdings (NorthMark Strategies)Under construction450 MW
- Cielo Digital Infrastructure Gaffney CampusGaffney, Cherokee Co. · Cielo Digital Infrastructure, LLCProposed300 MW
- Greenidge Spartanburg (South Carolina)Spartanburg, Spartanburg Co. · Greenidge GenerationCancelled100 MW
- DC BLOX Camp Hall Data Center CampusBerkeley Co. · DC BLOXProposed45 MW
- DC BLOX Myrtle Beach Cable Landing StationMyrtle Beach, Horry Co. · DC BLOXOperating19 MW
- Genesis Digital Assets Anderson Bitcoin Mining Data CenterAnderson, Anderson Co. · Genesis Digital AssetsOperating18 MW
- Genesis Digital Assets Union-Lockhart Bitcoin Mining Data CentersLockhart, Union Co. · Genesis Digital AssetsOperating15 MW
- DC BLOX Greenville Data CenterGreenville, Greenville Co. · DC BLOXOperating
- Google Berkeley County Data Center (Moncks Corner)Moncks Corner, Berkeley Co. · GoogleOperating
- Google Winding Woods CampusSt. George, Dorchester Co. · GoogleUnder construction
- Project Spero (TigerDC), Tyger River Industrial ParkSpartanburg Co. · TigerDCCancelled
- QTS York County Data Center CampusYork Co. · QTS Data CentersUnder construction
South Dakota
6 sites · 2 contested
- Sioux Falls Technology Park (Gemini Data Center)Sioux Falls, Minnehaha Co. · Gemini Data Center SD LLCPermitted500 MWContested
- Leola Data CenterLeola, McPherson Co. · Leola Data Center, LLCProposed50 MWContested
- Big Watt Digital Sully Buttes Mining FacilityOnida, Sully Co. · Big Watt DigitalOperating300 MWSupported
- Applied Digital Deuel County AI CampusToronto, Deuel Co. · Applied Digital CorporationCancelled430 MW
- Sequitor Edge Rapid CityRapid City, Pennington Co. · Sequitor EdgeProposed
- TierPoint Sioux Falls - WestSioux Falls, Minnehaha Co. · TierPointOperating
Tennessee
40 sites · 8 contested
- ColossusMemphis, Shelby Co. · xAIOperating1.2 GWIn litigation
- CleanSpark Limestone Bitcoin Mining Facility (closed 2026)Limestone, Washington Co. · CleanSpark, Inc.CancelledIn litigation
- DC BLOX Nashville (Grassmere Park)Nashville, Davidson Co. · DC BLOXProposed50 MWOpposed
- CleanSpark Mountain City Bitcoin Mining FacilityMountain City, Johnson Co. · CleanSpark, Inc.Proposed30 MWOpposed
- Hixson Data Center (McMinnville)McMinnville, Warren Co. · Hixson Data CenterProposed25 MWOpposed
- Jailhouse Studios (former Hamilton County Jail)Chattanooga, Hamilton Co. · Urban Story VenturesProposedOpposed
- Fisk University Quantum Leap Innovation & Technology CenterNashville, Davidson Co. · Fisk UniversityProposed30 MWContested
- Project River Data CenterCleveland, Bradley Co. · Wright Brothers ConstructionProposedContested
- Cielo Montgomery County AI CampusClarksville, Montgomery Co. · Cielo Digital InfrastructureProposed350 MWMixed reception
- Neural Nexus Innovation DistrictMemphis, Shelby Co. · Legacy Power CapitalProposedMixed reception
- Meta Gallatin Data Center CampusGallatin, Sumner Co. · MetaOperating300 MWSupported
- Centersquare Gallatin (NAS) CampusGallatin, Sumner Co. · CentersquareOperating100 MW
- Bitdeer Knoxville AI Datacenter (5101 S. National Drive)Knoxville, Knox Co. · BitdeerUnder construction86 MW
- CleanSpark Lenoir City Bitcoin Mining FacilityLenoir City, Loudon Co. · CleanSpark, Inc.Operating40 MW
- 5C MEM01 Memphis (former Fred's headquarters)Memphis, Shelby Co. · 5C Data CentersProposed15 MW
- RadiusDC Nashville INashville, Davidson Co. · RadiusDCUnder construction12 MW
- Flexential Nashville - FranklinFranklin, Williamson Co. · FlexentialOperating6 MW
- Flexential Nashville - Cool SpringsFranklin, Williamson Co. · FlexentialOperating3.15 MW
- Data Suites MurfreesboroMurfreesboro, Rutherford Co. · Data SuitesOperating2 MW
- DC BLOX Chattanooga (807 E 16th Street)Chattanooga, Hamilton Co. · DC BLOXOperating1 MW
- DataBank MEM1 (Memphis)Memphis, Shelby Co. · DataBankOperating0.45 MW
- CleanSpark Campbell Junction Bitcoin Mining FacilityCampbell Junction, Cumberland Co. · CleanSpark, Inc.Operating
- CleanSpark Decatur Bitcoin Mining FacilityDecatur, Meigs Co. · CleanSpark, Inc.Operating
- CleanSpark Jellico Bitcoin Mining FacilityJellico, Campbell Co. · CleanSpark, Inc.Operating
- CleanSpark Maynardville Bitcoin Mining FacilityMaynardville, Union Co. · CleanSpark, Inc.Operating
- CleanSpark New Tazewell Bitcoin Mining FacilityNew Tazewell, Claiborne Co. · CleanSpark, Inc.Operating
- CleanSpark Oneida Bitcoin Mining FacilityOneida, Scott Co. · CleanSpark, Inc.Operating
- CleanSpark West Crossville Bitcoin Mining FacilityCrossville, Cumberland Co. · CleanSpark, Inc.Operating
- CleanSpark Winfield Bitcoin Mining FacilityWinfield, Scott Co. · CleanSpark, Inc.Operating
- Collierville Enterprise Data Center (FedEx World Technology Center Campus)Collierville, Shelby Co. · Aphorio CarterOperating
- Colossus 2 (Whitehaven)Memphis, Shelby Co. · xAIOperating
- EdgeConneX NAS01 NashvilleNashville, Davidson Co. · EdgeConneXOperating
- Flexential Nashville - Brentwood (NAS01/04)Brentwood, Williamson Co. · FlexentialOperating
- Google Montgomery County Data CenterClarksville, Montgomery Co. · GoogleOperating
- Litewire McMinnville (former A.O. Smith Building)McMinnville, Warren Co. · LitewireOperating
- MinihardMemphis, Shelby Co. · xAIUnder construction
- Oak Ridge Reservation AI Data Center Sites (DOE land lease)Oak Ridge, Roane Co. · U.S. Department of EnergyProposed
- The Fort (TenHats Knoxville Data Center)Knoxville, Knox Co. · TenHats (formerly SH Data Technologies)Operating
- The STEM Practice Sycamore View AI Data CenterMemphis, Shelby Co. · Golden Acquisitions / The STEM PracticeUnder construction
- TierPoint NashvilleFranklin, Williamson Co. · TierPointOperating
Texas
132 sites · 15 contested
- Project AquilaHill Co. · RCM Hill, LLCProposed1.2 GWIn litigation
- MARA Granbury FacilityGranbury, Hood Co. · MARA HoldingsOperating300 MWIn litigation
- Fort SpunkyHood Co. · Pacifico EnergyProposed100 MWIn litigation
- Barrio Energy Tyler Data Center (West Erwin Street)Tyler, Smith Co. · Barrio Energy / Barrio Resources LLC (with Vulcan Core)Proposed12 MWIn litigation
- PowerHouse Caldwell County Data CenterUhland, Caldwell Co. · PowerHouse Data CentersProposed4 GWContested
- Project Merlin (Helios II)McGregor, McLennan Co. · Galaxy DigitalProposed3.5 GWContested
- Comanche CircleTolar, Hood Co. · Sailfish Digital Ventures (SDV)Proposed2 GWContested
- Crusoe Victoria AI FactoryVictoria, Victoria Co. · CrusoeProposed1.5 GWContested
- Meta El Paso AI Data Center CampusEl Paso, El Paso Co. · MetaUnder construction1 GWContested
- Riot Platforms Corsicana FacilityCorsicana, Navarro Co. · Riot PlatformsOperating1 GWContested
- Nexus Hubbard Data Center & Power CampusHubbard, Hill Co. · Nexus Data CentersUnder construction612 MWContested
- Cipher McLennan HPC Data CenterWaco, McLennan Co. · Cipher DigitalProposed500 MWContested
- Telios Quinlan CampusQuinlan, Hunt Co. · Core ScientificProposed430 MWContested
- Project MatadorAmarillo, Carson Co. · Fermi AmericaUnder constructionContested
- Westline Site / Dove Creek Technology CampusSan Angelo (Tankersley area, unincorporated), Tom Green Co. · Beacon Data Centers (via Westline TX Holdings)ProposedContested
- IREN Sweetwater CampusSweetwater, Nolan Co. · IREN (Iris Energy)Under construction2 GWMixed reception
- CloudBurst San Marcos GigaCenterSan Marcos, Hays Co. · CloudBurst Data CentersUnder construction1.2 GWMixed reception
- Stargate AbileneAbilene, Taylor Co. · OpenAI / Oracle / CrusoeOperating1.2 GWMixed reception
- Aligned Data Centers Project CaprockAbernathy, Hale Co. · Aligned Data CentersUnder construction540 MWMixed reception
- Hut 8 Beacon Point AI CampusRobstown, Nueces Co. · Hut 8Under construction352 MWMixed reception
- Rowan Project TempleTemple, Bell Co. · Rowan Digital InfrastructureUnder construction300 MWMixed reception
- Google Haskell County Data Center CampusHaskell, Haskell Co. · GoogleUnder constructionMixed reception
- Google Meitner Energy CenterPampa, Gray Co. · GoogleUnder constructionMixed reception
- Google Red Oak CampusRed Oak, Ellis Co. · GoogleOperatingMixed reception
- Microsoft San Antonio SAT89/SAT90 Data CentersCastroville, Medina Co. · MicrosoftUnder constructionMixed reception
- Red Oak CampusRed Oak, Ellis Co. · Compass DatacentersProposedMixed reception
- Microsoft Pecos Data Center CampusPecos, Reeves Co. · MicrosoftProposed2 GWSupported
- Galaxy Helios Data Center CampusAfton, Dickens Co. · Galaxy DigitalUnder construction1.6 GWSupported
- Vantage Frontier CampusShackelford Co. · Vantage Data CentersUnder construction1.4 GWSupported
- Lancium Clean Campus (Crusoe / Stargate Site 1)Abilene, Taylor Co. · CrusoeOperating1.2 GWSupported
- Stargate Milam County CampusMilam Co. · OpenAI / SoftBank (SB Energy)Under construction1.2 GWSupported
- Goodnight CampusClaude, Armstrong Co. · Google / CrusoeUnder construction933 MWSupported
- IREN Horizon, Childress, TXChildress, Childress Co. · IREN (Iris Energy)Under construction750 MWSupported
- GW RanchPecos Co. · Pacifico EnergyProposed7.7 GW
- Data City, TexasLaredo, Webb Co. · Energy Abundance Development CorporationProposed5 GW
- Poolside Project Horizon AI CampusPecos Co. · Poolside AIProposed2 GW
- Tract Caldwell Valley Technology ParkUhland, Caldwell Co. · TractProposed2 GW
- PowerHouse Grand Prairie CampusGrand Prairie, Ellis Co. · PowerHouse Data CentersUnder construction1.8 GW
- Core Scientific Pecos AI CampusPecos, Reeves Co. · Core ScientificUnder construction1.5 GW
- Cipher Colchis CampusSan Angelo, Tom Green Co. · Cipher DigitalProposed1 GW
- Site MAT 1177Matagorda Co. · MARA HoldingsProposed1 GW
- Helios (Galaxy Digital / CoreWeave)Afton, Dickens Co. · Galaxy DigitalOperating800 MW
- CyrusOne Freestone Energy Center CampusFairfield, Freestone Co. · CyrusOneUnder construction760 MW
- Riot Platforms Whinstone FacilityRockdale, Milam Co. · Riot PlatformsOperating750 MW
- Energy Vault Snyder AI CampusSnyder, Scurry Co. · Energy Vault, Inc.Under construction500 MW
- STACK DFW02 (Lancaster)Lancaster, Dallas Co. · STACK InfrastructureUnder construction500 MW
- Tesla Cortex 2.0 AI Training Cluster (Giga Texas)Austin, Travis Co. · TeslaUnder construction500 MW
- Red Oak CampusRed Oak, Ellis Co. · DataBankUnder construction480 MW
- CyrusOne Bosque County Campus (Thad Hill Energy Center)Bosque Co. · CyrusOneUnder construction400 MW
- AUS02 / Cedar Creek CampusCedar Creek, Bastrop Co. · EdgeConneXUnder construction384 MW
- Lancium Fort Stockton Clean CampusFort Stockton, Pecos Co. · LanciumOperating325 MW
- Big Digital Energy-10NetZero Hood County AI Data Center CampusHood Co. · Big Digital Energy, Inc. / 10NetZero, Inc. (50/50 joint venture)Proposed311 MW
- Cipher Barber Lake CampusColorado City, Mitchell Co. · Cipher DigitalUnder construction300 MW
- Cipher Black Pearl CampusWink, Winkler Co. · Cipher DigitalUnder construction300 MW
- CleanSpark Brazoria County (Second Texas) CampusBrazoria Co. · CleanSpark, Inc.Proposed300 MW
- Peak Mining Texas 1 (Saxet Energy Park)Corpus Christi, Nueces Co. · Peak MiningOperating300 MW
- Peak Mining Texas 2Corpus Christi, Nueces Co. · Peak MiningUnder construction300 MW
- PowerHouse Circle T Data Center CampusWestlake · PowerHouse Data CentersProposed300 MW
- CleanSpark Austin County AI Data Center CampusAustin Co. · CleanSpark, Inc.Proposed285 MW
- King Mountain Facility (50% JV)McCamey, Upton Co. · Hut 8Operating280 MW
- Core Scientific Denton Data Center (Denton 1)Denton, Denton Co. · Core ScientificUnder construction260 MW
- Texas Critical Data Centers (TCDC)Ector Co. · Sharon AI + New Era Energy & Digital (joint venture)Proposed250 MW
- Crow Holdings Stemmons Corridor Data Center CampusDallas, Dallas Co. · Crow Holdings (developed and leased by CleanArc Data Centers)Proposed245 MW
- Cipher Digital Odessa FacilityOdessa, Ector Co. · Cipher DigitalOperating207 MW
- Hut 8 Vega FacilityAmarillo, Potter Co. · American Bitcoin (Hut 8)Operating205 MW
- Core Scientific Austin Data Center (Austin 1)Austin, Travis Co. · Core ScientificOperating200 MW
- Crusoe Nolan County Data CenterSweetwater, Nolan Co. · Crusoe Energy SystemsProposed200 MW
- Marathon Digital Garden City FacilityGarden City, Glasscock Co. · MARA HoldingsOperating200 MW
- Prometheus Hyperscale Kaufman County CampusKaufman Co. · Prometheus HyperscaleProposed200 MW
- Switch: The Rock (Round Rock)Round Rock, Williamson Co. · SwitchUnder construction185 MW
- Bitdeer Rockdale FacilityRockdale, Milam Co. · BitdeerOperating170 MW
- Fluidstack Abernathy AI CampusAbernathy, Hale Co. · FluidstackUnder construction168 MW
- Soluna Project KatiRaymondville, Willacy Co. · Soluna HoldingsUnder construction166 MW
- QTS Irving 1Irving, Dallas Co. · QTS Data CentersOperating165 MW
- Meta Temple Data CenterTemple, Bell Co. · MetaOperating152 MW
- Flexential Kaufman County Campus (Talty)Talty, Kaufman Co. · FlexentialProposed108 MW
- Cipher Stingray HPC Data CenterAndrews, Andrews Co. · Cipher DigitalUnder construction100 MW
- Lambda Plano AI Data Center (Aligned DFW-04)Plano, Collin Co. · LambdaUnder construction100 MW
- Soluna Project EllenRio Hondo, Cameron Co. · Soluna HoldingsProposed100 MW
- Soluna Project FeiChildress, Childress Co. · Soluna HoldingsProposed100 MW
- Soluna Project DorothySilverton, Briscoe Co. · Soluna HoldingsOperating98 MW
- STACK DFW01 (Plano)Plano, Collin Co. · STACK InfrastructureOperating80 MW
- Soluna Project AnnieParis, Lamar Co. · Soluna HoldingsProposed75 MW
- Cipher Reveille HPC Data CenterCotulla, La Salle Co. · Cipher DigitalProposed70 MW
- Hut 8 Salt Creek FacilityCulberson Co. · American Bitcoin (Hut 8)Operating63 MW
- Aligned DFW-01Plano, Collin Co. · Aligned Data CentersOperating60 MW
- CyrusOne DFW3-DFW5 (Allen)Allen, Collin Co. · CyrusOneOperating50 MW
- Stream Data Centers DFWA (DFW VII)Garland, Dallas Co. · Stream Data CentersOperating43 MW
- Alborz Bitcoin MineHappy, Randall Co. · WindHQ LLC / Canaan Inc.Operating40 MW
- Bear Bitcoin MineAndrews, Andrews Co. · WindHQ LLC / Canaan Inc.Operating40 MW
- Chief Mountain Bitcoin MineAndrews, Andrews Co. · WindHQ LLC / Canaan Inc.Operating40 MW
- Skybox Houston OneKaty, Harris Co. · Skybox DatacentersOperating26 MW
- MARA Flared/Stranded-Gas Mining Fleet (TX + ND)Midland/Odessa area (representative) · MARA HoldingsOperating25 MW
- Edged Dallas (Irving)Irving, Dallas Co. · Edged EnergyOperating24 MW
- HyperDataGrid Lufkin Data Center (Former Timber Mill Site)Lufkin, Angelina Co. · HyperDataGridProposed20 MW
- QumulusAI Denton Modular Data CenterDenton, Denton Co. · QumulusAI, Inc.Proposed20 MW
- Sangha Renewables Ector County Bitcoin Mining FacilityOdessa, Ector Co. · Sangha RenewablesOperating19.9 MW
- Flexential Dallas - PlanoPlano, Collin Co. · FlexentialOperating13 MW
- Prime DFW01-01Dallas, Dallas Co. · Prime Data CentersOperating8 MW
- Element Critical Austin OneAustin, Travis Co. · Element CriticalOperating5 MW
- Soluna Project GraceSilverton, Briscoe Co. · Soluna HoldingsUnder construction2 MW
- Aligned DFW-03Mansfield, Tarrant Co. · Aligned Data CentersOperating
- Amazon Pecos County Data Center CampusPecos Co. · Amazon Data Services, Inc.Proposed
- AWS Project Eagle (Wharton County)Boling, Wharton Co. · Amazon Data Services, Inc.Proposed
- AWS Project Spectrum (Somervell/Hood County)Somervell Co. · Amazon Data Services, Inc.Proposed
- BlockchAIn Collin County AI GPU Hosting SiteCollin Co. · BlockchAIn Digital Infrastructure, Inc.Under construction
- BlockchAIn Reeves County AI GPU Hosting SiteReeves Co. · BlockchAIn Digital Infrastructure, Inc.Proposed
- BlockchAIn Wise County Data Mining SiteWise Co. · BlockchAIn Digital Infrastructure, Inc.Under construction
- Cipher Mikeska HPC Data CenterBrady, McCulloch Co. · Cipher DigitalProposed
- Cipher Milsing HPC Data CenterHuntsville, Walker Co. · Cipher DigitalProposed
- CyrusOne SAT1 (San Antonio)San Antonio, Bexar Co. · CyrusOneOperating
- CyrusOne SAT2-SAT4 (San Antonio)San Antonio, Bexar Co. · CyrusOneOperating
- Digital Realty AUS11Austin, Travis Co. · Digital RealtyOperating
- Equinix Dallas DA11Dallas, Dallas Co. · EquinixOperating
- Equinix Dallas DA12 (West Dallas)Dallas, Dallas Co. · EquinixProposed
- Flexential Dallas - Downtown DallasDallas, Dallas Co. · FlexentialOperating
- Flexential Dallas - RichardsonRichardson, Dallas Co. · FlexentialOperating
- Google Wilbarger County CampusVernon, Wilbarger Co. · GoogleUnder construction
- Lumen Austin 1Austin, Travis Co. · Lumen TechnologiesOperating
- Lumen Austin 3Austin, Travis Co. · Lumen TechnologiesOperating
- Lumen Dallas 1Dallas, Dallas Co. · Lumen TechnologiesOperating
- Lumen Dallas 6Dallas, Dallas Co. · Lumen TechnologiesOperating
- Lumen San Antonio 2San Antonio, Bexar Co. · Lumen TechnologiesOperating
- Meta Fort Worth Data CenterFort Worth, Tarrant Co. · MetaOperating
- Microsoft Irving Data CentersIrving, Dallas Co. · MicrosoftProposed
- NTT Global Data Centers Dallas TX1Garland, Dallas Co. · NTT Global Data CentersOperating
- QTS-Lancium Hall County Data Center CampusTurkey, Hall Co. · QTS Data Centers / LanciumProposed
- RELLIS Data and Research CenterBryan, Brazos Co. · ThisWay Global, Inc.Under construction
- TierPoint DallasDallas, Dallas Co. · TierPointOperating
- TierPoint Dallas-AllenAllen, Collin Co. · TierPointOperating
- Vantage San Antonio TX11San Antonio, Bexar Co. · Vantage Data CentersOperating
- Vantage San Antonio TX22San Antonio, Bexar Co. · Vantage Data CentersUnder construction
Utah
45 sites · 3 contested
- Volition Spanish Fork Data CenterSpanish Fork, Utah Co. · Volition IndustriesProposed250 MWOpposed
- Summit Ridge Data CenterSantaquin, Utah Co. · Data Center Power CompanyUnder constructionOpposed
- Stratos AI Data Center CampusLucin, Box Elder Co. · O'Leary DigitalProposed9 GWContested
- Joule Energy and Data Center CampusHolden, Millard Co. · Joule Capital PartnersUnder construction4 GWMixed reception
- QTS Eagle Mountain Data Center CampusEagle Mountain, Utah Co. · QTS Data CentersUnder construction200 MWMixed reception
- Meta Eagle Mountain Data Center CampusEagle Mountain, Utah Co. · MetaOperatingMixed reception
- Creekstone Energy Delta GigasiteDelta, Millard Co. · Creekstone EnergyUnder construction10 GW
- Antelope Data Center (Project Antelope)Cedar City, Iron Co. · Pronghorn Development LLCPermitted1.5 GW
- Red Butte Energy and Data Center CampusNewcastle, Iron Co. · BrightNightProposed1.5 GW
- QTS Eagle Mountain IIFairfield, Utah Co. · QTS Data CentersUnder construction650 MW
- Tooele Valley Data Center CampusBurmester, Tooele Co. · Zenith DevelopmentProposed500 MW
- Tract Eagle Mountain Data Center ParkEagle Mountain, Utah Co. · TractProposed400 MW
- Novva West Jordan CampusWest Jordan, Salt Lake Co. · Novva Data CentersOperating175 MW
- CirrusDS View 78 Data CenterMidvale, Salt Lake Co. · Cirrus Data ServicesOperating112 MW
- Aligned Salt Lake City Campus (SLC-01/02/03)West Jordan, Salt Lake Co. · Aligned Data CentersOperating60 MW
- BluSky AI Delta Data CenterDelta, Millard Co. · BluSky AI Inc.Proposed50 MW
- BluSky AI Milford CampusMilford, Beaver Co. · BluSky AI Inc.Proposed9.3 MW
- eBay Topaz Data CenterSouth Jordan, Salt Lake Co. · eBayOperating7.2 MW
- Lumen Salt Lake City Sites (Salt Lake 1, 2 and 4)Salt Lake City, Salt Lake Co. · LumenOperating6 MW
- BluSky AI Nephi SkyMod SiteNephi, Juab Co. · BluSky AI Inc.Permitted4 MW
- FiberState SLC1Draper, Salt Lake Co. · FiberStateOperating4 MW
- ValorC3 Saint George Data CenterSt. George, Washington Co. · ValorC3Operating4 MW
- Lumen Ogden 1Ogden, Weber Co. · LumenOperating3 MW
- Newfold Digital Utah County Data CenterProvo, Utah Co. · Newfold DigitalOperating3 MW
- Flexential Salt Lake City - DowntownSalt Lake City, Salt Lake Co. · FlexentialOperating2.65 MW
- Flexential CottonwoodCottonwood Heights, Salt Lake Co. · FlexentialOperating2 MW
- Regence BlueCross BlueShield Salt Lake City Data CenterCottonwood Heights, Salt Lake Co. · Regence BlueCross BlueShieldOperating2 MW
- Voonami Orem Data CenterOrem, Utah Co. · VoonamiOperating2 MW
- DataBank SLC1 (Salt Lake City Carrier Hotel)Salt Lake City, Salt Lake Co. · DataBankOperating1 MW
- EdgeConneX SLC01West Valley City, Salt Lake Co. · EdgeConneXOperating1 MW
- Unisys Salt Lake CitySalt Lake City, Salt Lake Co. · UnisysOperating1 MW
- Aligned SLC-04West Valley City, Salt Lake Co. · Aligned Data CentersOperating
- CyrusOne Dugway Proving Ground Data CenterTooele Co. · CyrusOneProposed
- DataBank Granite Point Campus (SLC2-SLC6)Bluffdale, Salt Lake Co. · DataBankOperating
- Fibernet Orem Data CenterOrem, Utah Co. · FibernetOperating
- Flexential Salt Lake City - Fair ParkSalt Lake City, Salt Lake Co. · FlexentialOperating
- Flexential Salt Lake City - LindonLindon, Utah Co. · FlexentialOperating
- Flexential Salt Lake City - MillcreekSalt Lake City, Salt Lake Co. · FlexentialOperating
- Flexential Salt Lake City - South Valley (SLC09)West Jordan, Salt Lake Co. · FlexentialOperating
- Google Eagle Mountain SiteEagle Mountain, Utah Co. · GoogleProposed
- Nine Mile Data Center (Uinta Basin Data Center Project)Myton, Duchesne Co. · Nine Mile Data, LLCPermitted
- Oracle Salt Lake CitySalt Lake City, Salt Lake Co. · OracleOperating
- Oracle West Jordan Data Center (Project Sequoia)West Jordan, Salt Lake Co. · OracleOperating
- Senawave Salt Lake CityWest Valley City, Salt Lake Co. · SenawaveOperating
- Syringa Networks West ValleyWest Valley City, Salt Lake Co. · Syringa NetworksOperating
Vermont
3 sites · 0 contested
- FirstLight Data Center (Williston, VT)Williston, Chittenden Co. · FirstLight FiberOperating
- Proposed St. Albans, VT Data Center (Unbuilt)St. Albans, Franklin Co. · Unnamed developerCancelled
- Tech Vault Data CenterSouth Burlington, Chittenden Co. · Tech Vault, Inc.Operating
Virginia
140 sites · 25 contested
- Tuckahoe Technology ParkGoochland Co. · TractProposed900 MWIn litigation
- Blackwell Road Data Center (Warrenton)Warrenton, Fauquier Co. · Amazon Data ServicesPermitted40 MWIn litigation
- Bermuda Hundred Data Center (Old Bermuda Hundred Road)Chester, Chesterfield Co. · Undisclosed (landowner: Washington Single Family Fund3)ProposedIn litigation
- Birchwood Data CampusKing George, King George Co. · Amazon Web ServicesPermittedIn litigation
- Hunting Hawk Technology ParkGlen Allen, Hanover Co. · HHHuntCancelled900 MWOpposed
- Mountain Road Technology ParkHanover Co. · TractCancelled900 MWOpposed
- 1500 Gateway Data Center (denied)Fredericksburg · 1500 Gateway LLC (Penzance)CancelledOpposed
- Etheridge Lakes Data Center (Great Bridge)Chesapeake, Chesapeake (independent city) Co. · Emerald Lakes Estates (Doug Fuller)CancelledOpposed
- Prince William Digital GatewayGainesville, Prince William Co. · QTS / Compass DatacentersCancelledOpposed
- Project Flash (Summit View Business Park)Rocky Mount, Franklin Co. · CrusoeCancelledOpposed
- Remington Technology ParkRemington, Fauquier Co. · PointOne Holdings Inc.Permitted600 MWContested
- Wise Innovation Hub (OASIS)Wise Co. · Wise Innovation Hub Venture LLCProposed600 MWContested
- Gainesville Crossing Digital Campus (GCDC)Gainesville, Prince William Co. · Corscale Data Centers (Patrinely / USAA Real Estate)Under construction300 MWContested
- 58 East Data Campus (Route 58 East Data Center Campus)Ringgold, Pittsylvania Co. · Anchorstone Advisors LLCPermittedContested
- Amazon Devlin Technology ParkBristow, Prince William Co. · Amazon Web ServicesPermittedContested
- Convergent Technology ParkRemington, Fauquier Co. · Convergent VA LLCProposedContested
- Cross Mill CenterLeesburg, Loudoun Co. · JK Land HoldingsPermittedContested
- Crossroads Technology CampusSpotsylvania Co. · RCK Digital Crossroads LLCProposedContested
- CyrusOne Vint Hill CampusVint Hill, Fauquier Co. · CyrusOneProposedContested
- Gigaland Data CentersRemington, Fauquier Co. · Gigaland LLCProposedContested
- Potomac Church Technology CenterFredericksburg, Stafford Co. · Amazon Data ServicesUnder constructionContested
- Project PeanutChester, Chesterfield Co. · GoogleUnder constructionContested
- Project SkyeMidlothian, Chesterfield Co. · GooglePermittedContested
- Solis Arx Progress Park Data Center CampusMax Meadows, Wythe Co. · Solis ArxProposedContested
- Vint Hill CornersVint Hill, Fauquier Co. · Vint Hill Corners LLCProposedContested
- Stafford Technology CampusFalmouth, Stafford Co. · STACK InfrastructurePermitted1.1 GWMixed reception
- CleanArc VA1Ruther Glen, Caroline Co. · CleanArc Data CentersUnder construction900 MWMixed reception
- PowerHouse 95Spotsylvania, Spotsylvania Co. · PowerHouse Data CentersUnder construction800 MWMixed reception
- Equinix Ashburn Campus (DC1-DC15)Ashburn, Loudoun Co. · EquinixOperating500 MWMixed reception
- CloudHQ Manassas MCC CampusManassas, Prince William Co. · CloudHQUnder construction382 MWMixed reception
- Chirisa Technology Park, Richmond (Chester)Chester, Chesterfield Co. · PowerHouse Data CentersUnder construction120 MWMixed reception
- Berry Hill / Southern Virginia MegasiteBerry Hill, Pittsylvania Co. · STACK InfrastructureProposedMixed reception
- Carter's Store Tech CampusSpotsylvania, Spotsylvania Co. · Amazon Web ServicesPermittedMixed reception
- Cosner Technology CampusMassaponax, Spotsylvania Co. · Amazon Web ServicesUnder constructionMixed reception
- Hunters Ridge South Data Center CampusSpotsylvania, Spotsylvania Co. · American Real Estate Partners (AREP)PermittedMixed reception
- King George Technology CenterKing George, King George Co. · Green Energy VenturesProposedMixed reception
- Microsoft Bristow Data Center Campus (MNZ03)Bristow, Prince William Co. · MicrosoftOperatingMixed reception
- QTS White Oak Technology Park II (RIC5)Sandston, Henrico Co. · QTS Data CentersPermittedMixed reception
- Red Ace Data CenterCulpeper, Culpeper Co. · Red Ace Capital ManagementPermittedMixed reception
- Summit Crossing Tech CampusMassaponax, Spotsylvania Co. · Amazon Web ServicesUnder constructionMixed reception
- TAC Data Centers Wythe County CampusWythe Co. · TAC Data Centers (The Ardent Companies)Proposed1 GWSupported
- Lake Anna Technology Campus (LATC)Louisa, Louisa Co. · Amazon Web ServicesUnder construction600 MWSupported
- Google Project LochMidlothian, Chesterfield Co. · GooglePermittedSupported
- North Creek Technology Campus (NCTC)Louisa, Louisa Co. · Amazon Web ServicesProposed3 GW
- Hanover Technology ParkHanover Co. · TractUnder construction2.4 GW
- EdgeCore Shannon Hill Data Center CampusLouisa Co. · EdgeCore Digital InfrastructureProposed1.1 GW
- AWS Mattermeade Tech CampusBowling Green, Caroline Co. · Amazon Web ServicesProposed770 MW
- AVAIO Appomattox Data Center CampusAppomattox, Appomattox County Co. · AVAIO Digital PartnersPermitted300 MW
- Greenlin ParkLeesburg, Loudoun Co. · JK Land HoldingsPermitted300 MW
- NuVu County Drive Data Center CampusPetersburg · NuVu Real EstatePermitted300 MW
- EdgeCore Culpeper Data Center CampusCulpeper, Culpeper Co. · EdgeCore Digital InfrastructureProposed216 MW
- Iron Mountain White Oak Technology Park CampusHenrico, Henrico Co. · Iron MountainProposed200 MW
- Vantage Data Centers VA4 Stafford CampusStafford Co. · Vantage Data CentersUnder construction192 MW
- Project TallmadgeStrasburg, Shenandoah Co. · Takanock, LLCProposed180 MW
- STACK NVA Loudoun 144MW Hyperscale CampusAshburn, Loudoun Co. · STACK InfrastructurePermitted144 MW
- Menlo Digital Richmond Virginia Data Center (Jamestown Drive)Petersburg · Menlo DigitalPermitted104 MW
- Aurora AI FactoryManassas, Prince William Co. · Digital RealtyUnder construction96 MW
- Vantage Ashburn II (VA2)Sterling, Loudoun Co. · Vantage Data CentersOperating96 MW
- CyrusOne NVA5 (Sterling)Sterling, Loudoun Co. · CyrusOneOperating81 MW
- Yondr Manassas Data Center CampusManassas · Yondr Group / Cerberus Capital ManagementProposed72 MW
- Aligned IAD-01Ashburn, Loudoun Co. · Aligned Data CentersOperating60 MW
- QTS Ashburn 1Sterling, Loudoun Co. · QTS Data CentersOperating55 MW
- Sabey Intergate.Ashburn (Building A)Ashburn, Loudoun Co. · Sabey Data CentersUnder construction54 MW
- DC Blox Henrico County Campus (withdrawn)Henrico Co. · DC BLOXCancelled50 MW
- PowerHouse CTP-02Chester, Chesterfield Co. · PowerHouse Data CentersUnder construction50 MW
- CyrusOne NVA1, NVA2 & NVA3 (Sterling)Sterling, Loudoun Co. · CyrusOneOperating48 MW
- Digital Realty ACC3Ashburn, Loudoun Co. · Digital RealtyOperating36.4 MW
- Iron Mountain VA-4Manassas, Prince William Co. · Iron MountainOperating32 MW
- Iron Mountain VA-6Manassas, Prince William Co. · Iron MountainOperating32 MW
- NTT Ashburn VA5 Data CenterAshburn, Loudoun Co. · NTT Global Data CentersOperating32 MW
- CyrusOne NVA8 (Sterling)Sterling, Loudoun Co. · CyrusOneOperating24 MW
- STACK NVA01ASterling, Loudoun Co. · STACK InfrastructureOperating17 MW
- NTT Ashburn VA2 Data CenterAshburn, Loudoun Co. · NTT Global Data CentersOperating14 MW
- NTT Ashburn VA1 Data CenterAshburn, Loudoun Co. · NTT Global Data CentersOperating12.6 MW
- Blackstone Data Services, Bluestone Business and Technology ParkTazewell Co. · Blackstone Data ServicesOperating12 MW
- ADP Ladysmith Data HubRuther Glen, Caroline Co. · ADP Ladysmith Data Hub, LLCProposed
- Aligned IAD-03Ashburn, Loudoun Co. · Aligned Data CentersOperating
- Bridgefield Tech CenterAshburn, Loudoun Co. · Amazon Web ServicesProposed
- Bull Church Data CenterRuther Glen, Caroline Co. · NRD Retail, LLCProposed
- Cabin Field Road Data CenterCampbell Co. · Mesh Capital LLCProposed
- Chantilly PremierChantilly, Fairfax Co. · PenzanceUnder construction
- CloudHQ LC1Ashburn, Loudoun Co. · CloudHQOperating
- CloudHQ LC3Ashburn, Loudoun Co. · CloudHQUnder construction
- Cologix ASH1Ashburn, Loudoun Co. · CologixOperating
- Compass Datacenters Loudoun County I ("True North")Leesburg, Loudoun Co. · Compass DatacentersOperating
- CoreSite VA1 - Reston, VAReston, Fairfax Co. · CoreSiteOperating
- CoreSite VA3 - Reston, VAReston, Fairfax Co. · CoreSiteOperating
- Culpeper Acquisitions Brandy Station Campus (denied)Brandy Station, Culpeper Co. · Culpeper Acquisitions LLCCancelled
- CyrusOne NVA7 (Sterling)Sterling, Loudoun Co. · CyrusOneOperating
- Digital Realty 8100 Boone Boulevard (former DuPont Fabros VA3)Vienna, Fairfax Co. · Digital RealtyOperating
- Digital Realty ACC10Ashburn, Loudoun Co. · Digital RealtyOperating
- Digital Realty ACC9Ashburn, Loudoun Co. · Digital RealtyOperating
- Digital Realty IAD38Ashburn, Loudoun Co. · Digital RealtyOperating
- Digital Realty IAD41 (Building P)Ashburn, Loudoun Co. · Digital RealtyOperating
- Digital Realty IAD42 (Building R)Sterling, Loudoun Co. · Digital RealtyOperating
- Digital Realty IAD43 (Building S)Sterling, Loudoun Co. · Digital RealtyOperating
- Digital Realty IAD44Sterling, Loudoun Co. · Digital RealtyOperating
- Digital Realty IAD55Sterling, Loudoun Co. · Digital RealtyOperating
- Digital Realty IAD73Ashburn, Loudoun Co. · Digital RealtyOperating
- Digital Realty Northern Virginia ACC4Ashburn, Loudoun Co. · Digital RealtyOperating
- Digital Realty Northern Virginia ACC5Ashburn, Loudoun Co. · Digital RealtyOperating
- Digital Realty Northern Virginia IAD14Ashburn, Loudoun Co. · Digital RealtyOperating
- Digital Realty VA3Reston, Fairfax Co. · Digital RealtyOperating
- Digital Realty VA4Bristow, Prince William Co. · Digital RealtyOperating
- Dulles Cloud South (Dulles South Innovation Center)Gainesville, Prince William County Co. · UndisclosedCancelled
- Equinix DC2Ashburn, Loudoun Co. · EquinixOperating
- Equinix DC3Ashburn, Loudoun Co. · EquinixOperating
- Flexential Richmond (RIC01/02)Richmond, Henrico Co. · FlexentialOperating
- Google Arcola Data Center (Loudoun County)Sterling, Loudoun Co. · GoogleOperating
- Google Botetourt Center at Greenfield Data Center CampusDaleville, Botetourt Co. · GooglePermitted
- Iron Horse Data Center CampusHanover Co. · WestDulles PropertiesProposed
- Iron Mountain VA-2Manassas, Prince William Co. · Iron MountainOperating
- Iron Mountain VA-3Manassas, Prince William Co. · Iron MountainOperating
- Lumen AshburnAshburn, Loudoun Co. · Lumen TechnologiesOperating
- Lumen McLean 1McLean, Fairfax Co. · Lumen TechnologiesOperating
- Massaponax Tech CampusMassaponax, Spotsylvania Co. · Lavue Lane Owner LLCProposed
- Microsoft Boydton Campus (BN / Azure East US)Boydton, Mecklenburg Co. · MicrosoftOperating
- Microsoft Panhandle Road Campus (AVC17 expansion)Boydton, Mecklenburg Co. · MicrosoftProposed
- Microsoft Skipwith Road Campus (LYH03)Boydton, Mecklenburg Co. · MicrosoftPermitted
- Microsoft Tunstall Road Campus (Hillcrest / AVC09)South Hill, Mecklenburg Co. · MicrosoftPermitted
- Mineral Gap Data CenterWise, Wise Co. · DP FacilitiesOperating
- NTT Ashburn VA7 Data CenterAshburn, Loudoun Co. · NTT Global Data CentersUnder construction
- NTT Ashburn VA8 Data CenterAshburn, Loudoun Co. · NTT Global Data CentersOperating
- Old Ridge Road Data Center CampusDoswell, Hanover Co. · LS PowerCancelled
- Pairmont Data Center CampusSpotsylvania Co. · Eagle Rock PartnersProposed
- PowerHouse ABX-1Ashburn, Loudoun Co. · PowerHouse Data CentersOperating
- Project SissonStafford Co. · Peterson CompaniesProposed
- QTS Ashburn 2 (Ashburn-Lockridge)Sterling, Loudoun Co. · QTS Data CentersOperating
- QTS Richmond 1 DC1 (RIC1, White Oak Technology Park)Sandston, Henrico Co. · QTS Data CentersOperating
- Quantum Park Data Center ExpansionAshburn, Loudoun Co. · Quantum Park LLCProposed
- SAMX Data CentersRemington, Fauquier Co. · SAMX Data LLCProposed
- Spring Valley Technology ParkAshburn, Loudoun Co. · Active InfrastructureProposed
- Thornberry Data Center CampusRuther Glen, Caroline Co. · Thornberry, LLCProposed
- Thornburg Business ParkThornburg, Spotsylvania Co. · LID, LLC (with IWG Thornburg, LLC and JR Bluestar Thornburg, LLC)Proposed
- Thornburg Industrial Park Data Center CampusThornburg, Spotsylvania Co. · South Roxbury Mill LLC / Grindstone VA LLCProposed
- TWG Data Halifax Road Campus (former Collier Yard)Petersburg · Warrenton Group (TWG Data)Permitted
- Virginia Technology ParkClear Brook, Frederick Co. · Equus Capital PartnersProposed
- Wagner Road Data Center CampusPetersburg, Petersburg Co. · Wagner PropertiesPermitted
- Wellington Road Data Center Campus (Sharpless)Bristow, Prince William Co. · Sharpless Enterprises LLCPermitted
- Winchester GatewayWinchester, Frederick Co. · Winchester Gateway LLCProposed
Washington
42 sites · 3 contested
- STACK Infrastructure Goldendale Data CenterGoldendale, Klickitat Co. · STACK InfrastructureProposed958 MWOpposed
- Rock Point Data Center ProjectWest Plains, Spokane Co. · Apricus Energy PartnersProposed1 GWContested
- Blue Fern Cle Elum Data CenterCle Elum, Kittitas Co. · Blue Fern DevelopmentProposed20 MWContested
- AWS Wallula Gap CampusWallula, Walla Walla Co. · Amazon Web ServicesProposed300 MWMixed reception
- Microsoft Malaga CampusMalaga, Chelan Co. · MicrosoftUnder construction288 MWMixed reception
- Merkle Standard Usk FacilityUsk, Pend Oreille Co. · Merkle Standard (Allrise Capital)Operating100 MWMixed reception
- Atlas Agro Richland Data Center CampusRichland, Benton Co. · Atlas Agro North AmericaProposed320 MWSupported
- Microsoft East Wenatchee Data CenterEast Wenatchee, Douglas Co. · MicrosoftOperating180 MW
- CyrusOne PNW1Quincy, Grant Co. · CyrusOneOperating90 MW
- Sabey Intergate.Quincy CampusQuincy, Grant Co. · Sabey Data CentersOperating70 MW
- Vantage WA13Quincy, Grant Co. · Vantage Data CentersOperating64 MW
- Centeris South Hill Campus (SH1/SH2)Puyallup, Pierce Co. · Centeris (The Benaroya Company)Operating50 MW
- H5 Data Centers Quincy CampusQuincy, Grant Co. · H5 Data CentersOperating40 MW
- TiTAN (Serverfarm Moses Lake)Moses Lake, Grant Co. · Serverfarm LLCOperating22 MW
- Moses Lake FacilityMoses Lake, Grant Co. · Bitfarms Ltd. (Keel Infrastructure Corp.)Under construction18 MW
- Bitdeer Wenatchee (Pangborn) Data CenterEast Wenatchee, Douglas Co. · BitdeerUnder construction13 MW
- Salcido Pangborn Data CenterEast Wenatchee, Douglas Co. · Salcido Enterprises, LLCOperating10 MW
- Salcido Wheeler Data CenterMoses Lake, Grant Co. · Salcido Enterprises, LLCOperating4.8 MW
- Salcido Fortress Data CenterQuincy, Grant Co. · Salcido Enterprises, LLCOperating4.6 MW
- Salcido ELLER Data CenterDouglas Co. · Salcido Enterprises, LLCOperating4 MW
- Salcido Horizon Data CenterQuincy, Grant Co. · Salcido Enterprises, LLCOperating4 MW
- PNNL AI Data CenterRichland, Benton Co. · Battelle Memorial Institute (Pacific Northwest National Laboratory)Proposed2 MW
- Salcido Broadway Data CenterGrant Co. · Salcido Enterprises, LLCOperating2 MW
- Salcido Entiat Data CenterEntiat, Chelan Co. · Salcido Enterprises, LLCOperating2 MW
- Digital Realty SEA1 (Intergate Seattle-East, Bldg 4)Tukwila, King Co. · Digital RealtyOperating
- Giga Watt Mining Facility (former)East Wenatchee, Douglas Co. · Giga Watt Inc.Cancelled
- H5 Data Centers SeattleSeattle, King Co. · H5 Data CentersOperating
- Lumen SpokaneSpokane, Spokane Co. · Lumen TechnologiesOperating
- Microsoft Columbia Data Center (Quincy)Quincy, Grant Co. · MicrosoftOperating
- NTT Data Quincy Data CenterQuincy, Grant Co. · NTT DATAOperating
- Sabey Intergate.Columbia Building AEast Wenatchee, Douglas Co. · Sabey Data CentersOperating
- Sabey Intergate.East Building 1Tukwila, King Co. · Sabey Data CentersOperating
- Sabey Intergate.East Building 5 (SDC East 5)Tukwila, King Co. · Sabey Data CentersOperating
- Sabey Intergate.West Building ATukwila, King Co. · Sabey Data CentersOperating
- Sabey Intergate.West Building CTukwila, King Co. · Sabey Data CentersOperating
- Salcido Cashmere Data CenterCashmere, Chelan Co. · Salcido Enterprises, LLCOperating
- Salcido Columbia Data CenterWenatchee, Chelan Co. · Salcido Enterprises, LLCOperating
- TierPoint SpokaneLiberty Lake, Spokane Co. · TierPointOperating
- Trammell Crow Lewis & Clark Ranch Data CenterWest Richland, Benton Co. · Trammell Crow CompanyProposed
- Vantage Quincy WA11Quincy, Grant Co. · Vantage Data CentersOperating
- Vantage WA12Quincy, Grant Co. · Vantage Data CentersOperating
- Westin Building (Digital Realty Seattle SEA10)Seattle, King Co. · Digital RealtyOperating
Washington, D.C.
2 sites · 0 contested
- 365 Data Centers, Washington, D.C.Washington · 365 Data CentersOperating
- CoreSite DC1 - Washington, D.C.Washington, District of Columbia Co. · CoreSiteOperating
West Virginia
12 sites · 3 contested
- Ridgeline Data CenterTucker Co. · Fundamental Data LLCProposedOpposed
- Monarch Compute CampusPoint Pleasant, Mason Co. · NscaleUnder construction2 GWContested
- Bedington CampusBerkeley Co. · Penzance ManagementProposed600 MWContested
- Project TamarackWest Columbia, Mason Co. · Starwood Digital VenturesProposed2.2 GWMixed reception
- Google Putnam County Data CenterBuffalo, Putnam Co. · GoogleProposedMixed reception
- Adams Fork Energy Campus Data Center (Harless Industrial Park, Holden)Holden, Logan Co. · TransGas Development SystemsProposed
- Adams Fork Energy Campus Data Center (Twisted Gun Golf Course, Wharncliffe)Wharncliffe, Mingo Co. · TransGas Development SystemsProposed
- Alpha Technologies Huntington Headquarters Data CenterHuntington, Cabell Co. · Alpha TechnologiesUnder construction
- Alpha Technologies South Charleston DC01South Charleston, Kanawha Co. · Alpha TechnologiesOperating
- Berkeley/Jefferson County Data Center Campus (QTS Kearneysville)Kearneysville, Berkeley Co. · QTS Data CentersProposed
- Blockchain Power Corp. Blacksville Bitcoin Mining SiteBlacksville, Monongalia Co. · Blockchain Power Corp.Operating
- Hog Lick Aggregates Data Center / Microgrid ProposalWhite Hall, Marion Co. · Hog Lick AggregatesProposed
Wisconsin
28 sites · 11 contested
- Microsoft Mount Pleasant Data Center CampusMount Pleasant, Racine Co. · MicrosoftOperating1 GWIn litigation
- Stargate Lighthouse CampusPort Washington, Ozaukee Co. · Vantage Data CentersUnder construction902 MWIn litigation
- Cassville Data Center Campus (Undisclosed Developer)Cassville, Grant Co. · Undisclosed (major tech company, NDA not signed)CancelledOpposed
- Cloverleaf Carlton Data Center Site (Kewaunee County)Carlton, Kewaunee County Co. · Cloverleaf InfrastructureCancelledOpposed
- Cloverleaf Wrightstown Data Center Inquiry (Village of Wrightstown)Wrightstown, Brown County Co. · Cloverleaf InfrastructureProposedOpposed
- QTS Dane County Hyperscale Campus (DeForest)DeForest, Dane Co. · QTS Data CentersCancelledOpposed
- APECS Data Center Campus (Former GM Assembly Plant)Janesville, Rock Co. · Viridian Acquisitions LLCProposed800 MWContested
- Metered Mining Hammond Bitcoin Mining FacilityHammond, St. Croix Co. · Metered MiningPermitted6 MWContested
- Menomonie Data Center CampusMenomonie, Dunn Co. · Undisclosed (Balloonist LLC)ProposedContested
- Microsoft Kenosha Data Center CampusKenosha, Kenosha Co. · MicrosoftProposedContested
- SOS Limited Park Falls Crypto Mine (Former Flambeau River Paper Mill)Park Falls, Price County Co. · SOS LimitedOperatingContested
- Meta Beaver Dam Data Center CampusBeaver Dam, Dodge Co. · MetaUnder construction220 MWMixed reception
- Ark Data Centers Green Bay (Harrison Campus)Harrison, Calumet Co. · Involta (rebranded Ark Data Centers, May 2024)Operating20 MW
- DPO Wisconsin Rapids AI Computing FacilityWisconsin Rapids, Wood Co. · Digital Power OptimizationProposed20 MW
- Data Holdings Milwaukee Data CenterMilwaukee, Milwaukee Co. · Data Holdings LLCOperating10 MW
- Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro)Hatfield, Jackson Co. · Cascade Digital Power (Digital Power Optimization)Operating6 MW
- US Signal WI02 Madison (Fitchburg)Fitchburg, Dane Co. · US SignalOperating6 MW
- Expedient MKE1 (Milwaukee/Franklin)Franklin, Milwaukee Co. · ExpedientOperating1.6 MW
- US Signal WI01 MadisonMadison, Dane Co. · US SignalOperating0.15 MW
- EdgeConneX Madison (MAD01)Madison, Dane Co. · EdgeConneXOperating
- Epic Hosting Verona Data CenterVerona, Dane County Co. · Epic Hosting, LLC (Epic Systems)Permitted
- Lumen Madison 1Madison, Dane Co. · Lumen TechnologiesOperating
- Netsonic Green Bay Data CenterGreen Bay, Brown County Co. · Netsonic (Dynamic Ventures LLC)Operating
- Oppidan Beaver Dam Edge Data CenterBeaver Dam, Dodge County Co. · Oppidan Investment CompanyPermitted
- Project Cornmaze Data Center (Town of Beloit)Beloit, Rock Co. · Cambrin LLCProposed
- Stonebridge Pacific AI Data Center (Columbia County)Pacific, Columbia Co. · StonebridgeCancelled
- TierPoint MilwaukeeMilwaukee, Milwaukee Co. · TierPointOperating
- Wisconsin Rapids Data CenterWisconsin Rapids, Wood Co. · PCH WI Holdings LLCProposed
Wyoming
15 sites · 1 contested
- Prometheus Hyperscale Falls Ranch Data Center CampusGlenrock, Converse Co. · Prometheus HyperscaleProposed1.5 GWContested
- Project TemboCheyenne, Laramie Co. · GoogleUnder construction2.7 GWMixed reception
- Prometheus Hyperscale Atlas Industrial Park Data Center CampusEvanston, Uinta Co. · Prometheus HyperscalePermitted1.3 GWMixed reception
- Meta Cheyenne Data CenterCheyenne, Laramie Co. · MetaUnder construction109 MWSupported
- Highwire Energy Partners Bitcoin Mining Facility (Evansville)Evansville, Natrona Co. · Highwire Energy PartnersCancelledSupported
- Microsoft Cheyenne Mega-Campus ExpansionCheyenne, Laramie Co. · MicrosoftPermittedSupported
- Related Digital Cheyenne Data Center CampusCheyenne, Laramie Co. · Related DigitalUnder construction302 MW
- CleanSpark Cheyenne Bitcoin Mining CampusCheyenne, Laramie Co. · CleanSpark, Inc.Operating75 MW
- Lunavi Cheyenne Data CenterCheyenne, Laramie Co. · LunaviOperating8 MW
- Cogent Cheyenne Data CenterCheyenne, Laramie Co. · Cogent CommunicationsOperating2.5 MW
- Crypto Knight Hosting Cheyenne Bitcoin Mining FacilityCheyenne, Laramie Co. · Crypto Knight HostingOperating
- EchoStar Cheyenne Data Center and Satellite Uplink FacilityCheyenne, Laramie Co. · EchoStarOperating
- H6 Coin Newcastle Bitcoin Mining FacilityNewcastle, Weston Co. · H6 Coin LLCOperating
- NCAR-Wyoming Supercomputing CenterCheyenne, Laramie Co. · University Corporation for Atmospheric Research (UCAR)Operating
- Truss Energy Carpenter Data CenterCarpenter, Laramie Co. · Truss EnergyProposed
Questions about the registry
How many data centers are there in the United States?
This registry holds 1,576 US data center and crypto mining sites on the public record as of September 14, 2026: 745 operating, 241 under construction, 109 permitted, 391 proposed and 90 cancelled. It counts campuses and named facilities with a public source, not every leased suite in an office building, so it is a floor.
How much data center capacity is planned in the US?
318.2 GW of planned or under construction capacity is on record across 55 states, counting only sites where a megawatt figure appears in a permit, filing or named report.
How many data centers are facing opposition or lawsuits?
355 sites carry a documented reception of contested, opposed or in litigation. The full list, by state, is on the contested sites page.
Where does the data come from and can I use it?
The base is Compute Atlas version 1.32.0, an open survey under CC BY 4.0, joined to our case files and corrected where we have read the documents. The whole table is downloadable as CSV and JSON under the same license, with citation formats on the data page.
1,441 of 1,576 sites have a full profile. Missing a site or holding a document we do not? Tell us.
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us