ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue) is a proposed data center in Bristol, Connecticut (Hartford County), operated by ReNew Developers. The public record puts it at announced 2022. It is the subject of active public debate, with hearings, petitions, or organized opposition on record.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
ReNew Developers
Facility type
Data center
Location
234 Riverside Avenue, Bristol, Hartford County, CT, 06010
Coordinates
41.6700, -72.9341 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
2022
Utility
Eversource
Power source
On site gas
On site generation
4 MW
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Contested
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. April 2026
    Proposed
    Bristol Inland Wetlands commission approved the wetlands application with stipulations; the data-center building still needs local site-plan and building approvals Source: The Bristol Edition

Opposition and litigation at this site

Yes. ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue) in Bristol, Hartford County, Connecticut is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. The Bristol Edition reports residents only learned of the 2022-era project recently, and the City Council and mayor pushed the Zoning Commission to roll back the data-center rules the project relies on

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: contested means active public debate is on record, with hearings, petitions, or organized opposition, without litigation.

The Bristol Edition reports residents only learned of the 2022-era project recently, and the City Council and mayor pushed the Zoning Commission to roll back the data-center rules the project relies on

Source: The Bristol Edition

Power and water

Siting Council staff report: 13 Bloom Energy ES-5 solid-oxide fuel cells running on natural gas, in parallel with the grid, supplying about 99% of the data center's base load; the Eversource interconnection is for backup

City and mayor describe closed-loop liquid cooling with no withdrawal from or discharge to the Pequabuck River; the mayor estimated annual water use at about 30% of a local grocery store's

Notes on the record

Small edge/'micro cloud' data center on a 1.62-acre remediated brownfield (former Dodge Village dealership) beside the Pequabuck River. Building size varies across sources: the city says ~15,000 sq ft, the Siting Council staff report is referenced in press as ~15,000 gross sq ft over two stories, and The Bristol Edition reported 27,000 sq ft (April 2026) and 14,000 sq ft (August 2026); no single figure is recorded. The Siting Council's Petition 1540 approval (2022-12-08, construction extension 2025-09-19) covers only the fuel-cell plant; the data-center building still needs Bristol land-use and building approvals. In August 2026 the Zoning Commission took up an amendment to drop the 5,001 to 250,000 sq ft data-center category and require special permits, and the mayor urged limiting data centers over 15,000 sq ft; together these could block the project at its current size. The 4 MW is the on-site fuel-cell rating, not IT load, so capacityMw is omitted.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue)?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue) data center in Bristol?

Yes. ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue) in Bristol, Hartford County, Connecticut is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. The Bristol Edition reports residents only learned of the 2022-era project recently, and the City Council and mayor pushed the Zoning Commission to roll back the data-center rules the project relies on

Has anyone filed a lawsuit over the ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue) data center?

No lawsuit over ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue) appears in the record we track as of September 30, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue) use?

No water withdrawal figure for ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue), and how big is it?

ReNew Developers is the operator on record. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue)," updated September 30, 2026, https://suedatacenters.org/data-centers/renew-riverside-bristol-ct.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/renew-riverside-bristol-ct, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.City of Bristol, Data Center Overview from the Mayor (Riverside Avenue micro cloud building, 4 MW fuel cell, approvals timeline) · City of Bristol, CT · retrieved September 30, 2026
  2. 2.Connecticut Siting Council, Petition No. 1540 staff report (draft), ReNew Developers LLC, 4.0 MW customer-side fuel cell at 234 Riverside Avenue serving a data center · Connecticut Siting Council · retrieved September 30, 2026
  3. 3.Inland Wetlands approves permit for Riverside Avenue data center · The Bristol Edition · retrieved September 30, 2026
  4. 4.Zoning Commission to take up vape shops, data center at special meeting · The Bristol Edition · retrieved September 30, 2026
  5. 5.Mayor's column: Let's talk about data center · The Bristol Edition · retrieved September 30, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us