Data Center Registry
Beacon Falls Data Center Campus (1 Lopus Road)
Beacon Falls, New Haven County, Connecticut
Beacon Falls Data Center Campus (1 Lopus Road) is a proposed data center in Beacon Falls, Connecticut (New Haven County), operated by O&G Industries. The public record puts it at 100 MW planned. It is the subject of active public debate, with hearings, petitions, or organized opposition on record.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- O&G Industries
- Facility type
- Data center
- Location
- 1 Lopus Road, Beacon Falls, New Haven County, CT, 06403
- Coordinates
- 41.4423, -73.0643 (approximate)
- Power capacity
- 100 MW planned
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Power source
- Mixed
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Contested
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Yes. Beacon Falls Data Center Campus (1 Lopus Road) in Beacon Falls, New Haven County, Connecticut is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. Courant (2026-09-21): an August 2026 town information meeting; three online petitions with more than 3,000 signatures; residents calling for a moratorium (none passed yet)
How the community has taken it
Reception is a sourced signal, not an editorial judgment: contested means active public debate is on record, with hearings, petitions, or organized opposition, without litigation.
Courant (2026-09-21): an August 2026 town information meeting; three online petitions with more than 3,000 signatures; residents calling for a moratorium (none passed yet)
Power and water
Listing: utility-delivered power combined with Class I fuel cells and carbon capture; the Courant reports 33 fuel cells planned
Notes on the record
O&G Industries (master developer) is marketing a 44+/49-acre former gravel-pit site off Lopus Road beside Route 8 for a 294,000 sq ft data center campus: 100 MW ultimate capacity (listing specs say 112.5 MW), sold as AI/cloud capacity and powered by utility service plus Class I fuel cells (33 fuel cells, per the Courant) with carbon capture. As of 2026-09-21 no formal application had been filed with the town. Residents approved a 32 MW data center on the same property in 2022, but it never materialized. aiClassification is not set: the AI framing comes from a marketing listing, not a committed tenant.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- TierPoint Waterbury · Waterbury · TierPoint8 mi · Operating
- CogNovum Data Center (80 Merritt Boulevard) · Trumbull · CogNovum15 mi · Operating · 6.75 MW · Contested
- ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue) · Bristol · ReNew Developers17 mi · Proposed · Contested
- Energy & Innovation Park Data Center (480 Myrtle Street) · New Britain · EIP Investment21 mi · Proposed · 44 MW
- CyrusOne NYM5 (Norwalk) · Norwalk · CyrusOne28 mi · Operating · 4 MW
Questions people ask about this site
Is there opposition to the Beacon Falls Data Center Campus (1 Lopus Road) in Beacon Falls?
Yes. Beacon Falls Data Center Campus (1 Lopus Road) in Beacon Falls, New Haven County, Connecticut is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. Courant (2026-09-21): an August 2026 town information meeting; three online petitions with more than 3,000 signatures; residents calling for a moratorium (none passed yet)
Has anyone filed a lawsuit over the Beacon Falls Data Center Campus (1 Lopus Road)?
No lawsuit over Beacon Falls Data Center Campus (1 Lopus Road) appears in the record we track as of September 30, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Beacon Falls Data Center Campus (1 Lopus Road) use?
No water withdrawal figure for Beacon Falls Data Center Campus (1 Lopus Road) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Beacon Falls Data Center Campus (1 Lopus Road), and how big is it?
O&G Industries is the operator on record. Capacity on record is 100 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Beacon Falls Data Center Campus (1 Lopus Road)," updated September 30, 2026, https://suedatacenters.org/data-centers/og-industries-beacon-falls-ct.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/og-industries-beacon-falls-ct, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Beacon Falls Data Center, 1 Lopus Road, 294,000 SF, 100 MW campus (marketing listing) · The Agency CRE · retrieved September 30, 2026
- 2.CT town turns against data centers: 'Yes, please' becomes 'No way' (Hartford Courant, 2026-09-21) · Hartford Courant via Yahoo News · retrieved September 30, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us