NCAR-Wyoming Supercomputing Center is an operating data center in Cheyenne, Wyoming (Laramie County), operated by University Corporation for Atmospheric Research (UCAR). The public record puts it at announced 2012.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- University Corporation for Atmospheric Research (UCAR)
- Facility type
- Data center
- Location
- Veta Drive, Cheyenne, Laramie County, WY, 82009
- Coordinates
- 41.1289, -104.8974
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- 2012
- Utility
- Cheyenne Light, Fuel and Power (Black Hills Corporation)
- Power source
- Grid
- Cooling
- Hybrid
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- October 2012OperatingComputing operations began in October 2012. Source: Wikipedia
Opposition and litigation at this site
Nothing on record as of September 2, 2026. No lawsuit, organized opposition, or contested hearing over NCAR-Wyoming Supercomputing Center in Cheyenne, Laramie County, Wyoming appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Wind supplies at least 10% of the center's power; the primary grid source is coal.
The facility uses ambient outside air for cooling roughly 96% of the year and specialized cooling-tower equipment otherwise, a seasonal switch between dry and evaporative modes. Water consumption is reported as about 40% lower than a traditional design.
Notes on the record
High-performance computing and data-archival facility in the North Range Business Park, Cheyenne, operated by NCAR for UCAR under a partnership with the State of Wyoming and the University of Wyoming. 153,000 total square feet with 24,000 square feet of raised-floor modules. Coordinates and street are corroborated by the OpenStreetMap building tagged telecom=data_center with operator 'University Corporation for Atmospheric Research'. No megawatt figure is published in the sources read, so no capacity is recorded.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Project Tembo · Cheyenne · Google4 mi · Under construction · 2.7 GW · Mixed reception
- CleanSpark Cheyenne Bitcoin Mining Campus · Cheyenne · CleanSpark, Inc.4 mi · Operating · 75 MW
- Crypto Knight Hosting Cheyenne Bitcoin Mining Facility · Cheyenne · Crypto Knight Hosting4 mi · Operating
- Microsoft Cheyenne Mega-Campus Expansion · Cheyenne · Microsoft6 mi · Permitted · Supported
- Lunavi Cheyenne Data Center · Cheyenne · Lunavi6 mi · Operating · 8 MW
- Meta Cheyenne Data Center · Cheyenne · Meta7 mi · Under construction · 109 MW · Supported
- Related Digital Cheyenne Data Center Campus · Cheyenne · Related Digital8 mi · Under construction · 302 MW
- EchoStar Cheyenne Data Center and Satellite Uplink Facility · Cheyenne · EchoStar9 mi · Operating
Questions people ask about this site
Is there opposition to the NCAR-Wyoming Supercomputing Center data center in Cheyenne?
Nothing on record as of September 2, 2026. No lawsuit, organized opposition, or contested hearing over NCAR-Wyoming Supercomputing Center in Cheyenne, Laramie County, Wyoming appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the NCAR-Wyoming Supercomputing Center data center?
No lawsuit over NCAR-Wyoming Supercomputing Center appears in the record we track as of September 2, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does NCAR-Wyoming Supercomputing Center use?
No water withdrawal figure for NCAR-Wyoming Supercomputing Center is on record here. Cooling is recorded as hybrid, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates NCAR-Wyoming Supercomputing Center, and how big is it?
University Corporation for Atmospheric Research (UCAR) is the operator on record. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "NCAR-Wyoming Supercomputing Center," updated September 2, 2026, https://suedatacenters.org/data-centers/ncar-wyoming-supercomputing-center-cheyenne-wy.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/ncar-wyoming-supercomputing-center-cheyenne-wy, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.NCAR-Wyoming Supercomputing Center - Computational and Information Systems Lab · NCAR/UCAR · retrieved September 2, 2026
- 2.NCAR-Wyoming Supercomputing Center · Wikipedia · retrieved September 2, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us