Equinix MI6, Doral
Doral, Miami-Dade County, Florida · All 34 Equinix sites
Equinix MI6, Doral is an operating data center in Doral, Florida (Miami-Dade County), operated by Equinix.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Equinix
- Facility type
- Data center
- Location
- 1525 NW 98th Court, Doral, Miami-Dade County, FL, 33172
- Coordinates
- 25.7878, -80.3546 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- air
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 21, 2026OperatingActive PeeringDB facility record (11 networks, 1 IX) and live colocation listing as of retrieval. Source: PeeringDB
Opposition and litigation at this site
Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over Equinix MI6, Doral in Doral, Miami-Dade County, Florida appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Inflect listing describes air-cooled DX CRACs (N+2), no cooling-water circuit identified.
Notes on the record
One-story facility of 108,336 sq ft total / 75,043 sq ft usable per Inflect; N+1 isolated-redundant UPS, N+2 cooling, raised floor; PCI DSS, ISO 27001, SOC 2. Equinix's own MI6 page returned 403 and is not cited.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- CoreSite MI2, Doral · Doral · CoreSite1 mi · Operating
- QTS Miami (MIA1) · Sweetwater · QTS Data Centers2 mi · Operating · 2 MW
- RadiusDC Miami I · Sweetwater · RadiusDC2 mi · Operating · 9.2 MW
- Metrobloks MIA-A1 (MB01) · Miami · Metrobloks3 mi · Proposed · 15.2 MW
- EdgeConneX MIA03 (Beacon Station, withdrawn) · Medley · EdgeConneX6 mi · Cancelled
- CoreSite MI1, Miami · Miami · CoreSite8 mi · Operating
- Iron Mountain MIA-1 · Westview · Iron Mountain9 mi · Under construction · 16 MW · Contested
- Equinix MI1 (NAP of the Americas) · Miami · Equinix10 mi · Operating
Questions people ask about this site
Is there opposition to the Equinix MI6, Doral data center in Doral?
Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over Equinix MI6, Doral in Doral, Miami-Dade County, Florida appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Equinix MI6, Doral data center?
No lawsuit over Equinix MI6, Doral appears in the record we track as of September 21, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Equinix MI6, Doral use?
No water withdrawal figure for Equinix MI6, Doral is on record here. Cooling is recorded as air, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Equinix MI6, Doral, and how big is it?
Equinix is the operator on record. We hold 34 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Equinix MI6, Doral," updated September 21, 2026, https://suedatacenters.org/data-centers/equinix-mi6-doral-fl.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/equinix-mi6-doral-fl, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.PeeringDB facility record, Equinix MI6 Miami, Doral · PeeringDB · retrieved September 21, 2026
- 2.Equinix MI6, building and services listing · Inflect · retrieved September 21, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us