Florida has a moderate, growing data center market in Miami, Jacksonville, and Tampa, with no documented data center litigation as of August 2026. What Florida residents near these facilities should watch for, the legal options available, and how to tell us about your situation.
Florida at a glance
Fast growth
- Market size
- Moderate and growing across three metro clusters
- Hot spots
- Miami, Jacksonville, Tampa
- Key operators
- Colocation and connectivity operators anchor Miami; no contested hyperscale campus documented
- Documented disputes
- None documented as of August 2026
- Statewide action
- None documented as of August 2026
Key Takeaways
- No data center lawsuit or formal dispute is documented in Florida as of August 2026, even as the market grows across Miami, Jacksonville, and Tampa.
- Miami's role as the connectivity gateway to Latin America keeps its facilities in urban commercial zones, the siting pattern least likely to generate neighbor litigation.
- The growth to watch is at the edges: as AI-scale projects hunt for land and power, proposals on cheaper suburban and rural land are where fights start in every other state.
- Florida residents affected by a facility hold the standard toolkit: private nuisance claims, zoning appeals, and ordinance enforcement, all stronger with early documentation.
- Homeowners near new construction should watch wells, drainage, and flooding: construction-phase damage claims are among the most common data center disputes nationally.
Data centers in Florida, from the registry
All 65 sites65 sites on the public record: 43 operating, 3 under construction, 1 permitted, 11 proposed, 7 cancelled. 14 carry documented opposition or litigation. 3.1 GW planned.
By county, alphabetically. Each profile carries capacity, land, utility, water, subsidies, jobs, a timeline, and every source.
Alachua County (1 site)
- University of Florida Data Center (East Campus, HiPerGator) · Gainesville · University of FloridaOperating
Brevard County (1 site)
- SD Data Center, Melbourne · Melbourne · SD Data Center (Gogo Inc.; formerly Satcom Direct)Operating
Broward County (4 sites)
- Volico FLL1 (500 Green Road) · Pompano Beach · Volico (Biznesshosting, Inc.)Operating · 2 MW
- 365 Data Centers Fort Lauderdale (FLL) · Fort Lauderdale · 365 Data CentersOperating
- Cogent Hollywood, FL Data Center · Pembroke Park · Cogent CommunicationsOperating
- Flexential Fort Lauderdale (FLL01/02) · Fort Lauderdale · FlexentialOperating
Citrus County (1 site)
- Holder Industrial Park Data Center Expansion (withdrawn) · Lecanto · Deltona CorporationCancelled · Opposed
Collier County (1 site)
- SkyLink Data Centers, Naples · Naples · SkyLink Data CentersOperating
DeSoto County (1 site)
- DCIP DeSoto County Data Center (Roan Street) · Arcadia · DCIP Group (DeSoto County Industrial Park)Permitted · Opposed
Duval County (6 sites)
- ColoCSX (CSX Data Center) · Jacksonville · ColoCSX (CSX Transportation)Operating · 6 MW
- Cologix JAX1 · Jacksonville · CologixOperating
- Cologix JAX2 · Jacksonville · CologixOperating
- EdgeConneX Jacksonville JAX01 · Jacksonville · EdgeConneXOperating
- Flexential Jacksonville · Jacksonville · FlexentialOperating
- TierPoint Jacksonville Data Center · Jacksonville · TierPointOperating
Flagler County (1 site)
- DC BLOX Palm Coast Cable Landing Station · Palm Coast · DC BLOXUnder construction · 10 MW · Contested
Hillsborough County (7 sites)
- Centersquare Tampa TPA1 · Tampa · CentersquareOperating · 9 MW
- AceHost Marion Mining Facility · Tampa · AceHostOperating · 3 MW
- Flexential Tampa - North (TPA03) · Tampa · FlexentialOperating · 3 MW
- Flexential Tampa - West · Tampa · FlexentialOperating · 1.81 MW
- H5 Data Centers Tampa (Franklin Exchange, formerly 365 Data Centers TA1) · Tampa · H5 Data Centers (HyscaleIX JV with Novacap)Operating
- Hivelocity Tampa 1 (TPA1) · Tampa · HivelocityOperating
- Hivelocity Tampa 2 (TPA2) · Tampa · HivelocityOperating
Leon County (1 site)
- EdgeConneX TAL01, Tallahassee · Tallahassee · EdgeConneXOperating · 0.5 MW
Martin County (1 site)
- Silver Fox 606 AI Data Center Campus (withdrawn) · Indiantown · Silver Fox 606 LLCProposed · 1 GW · Contested
Miami-Dade County (17 sites)
- Iron Mountain MIA-1 · Westview · Iron MountainUnder construction · 16 MW · Contested
- Metrobloks MIA-A1 (MB01) · Miami · MetrobloksProposed · 15.2 MW
- Redivider Homestead Bitcoin Mining Facility · Homestead · Redivider Blockchain (joint venture with Esperanza Opportunity Fund)Proposed · 10 MW
- RadiusDC Miami I · Sweetwater · RadiusDCOperating · 9.2 MW
- EdgeConneX MIA02, Miami Gardens · Miami Gardens · EdgeConneXOperating · 6 MW
- iM Critical Miami Data Center · Miami · iM Critical (iM Data Centers)Operating · 5 MW
- Aptum Miami Data Center, Doral · Doral · Aptum TechnologiesOperating · 2 MW
- QTS Miami (MIA1) · Sweetwater · QTS Data CentersOperating · 2 MW
- DataBank MIA1, Downtown Miami · Miami · DataBankOperating · 1.6 MW
- EdgeConneX MIA01, Miami · Miami · EdgeConneXOperating · 1.5 MW
- CoreSite MI1, Miami · Miami · CoreSiteOperating
- CoreSite MI2, Doral · Doral · CoreSiteOperating
- Digital Realty MIA10 · Miami · Digital RealtyOperating
- EdgeConneX MIA03 (Beacon Station, withdrawn) · Medley · EdgeConneXCancelled
- Equinix MI1 (NAP of the Americas) · Miami · EquinixOperating
- Equinix MI2, Miami · Miami · EquinixOperating
- Equinix MI6, Doral · Doral · EquinixOperating
Nassau County (1 site)
- NextNRG Nassau County Data Center & Energy Campus · NextNRGProposed · 200 MW · Contested
Okeechobee County (1 site)
- Okee-One Data Center Campus · Okeechobee · Indian River State CollegeCancelled · Opposed
Orange County (4 sites)
- HostDime Orlando Tier IV Data Center · Eatonville · HostDimeUnder construction · Contested
- Cogent Orlando Data Center · Orlando · Cogent CommunicationsOperating
- Colo Solutions Downtown Orlando · Orlando · Colo Solutions, LLCOperating
- CoreSite OR1, Orlando · Orlando · CoreSiteOperating
Osceola County (2 sites)
- La Rosa Holdings Tier III AI Data Center, St. Cloud · Saint Cloud · La Rosa Holdings Corp.Proposed · 1.5 MW
- US Development Yeehaw Junction Data Center Campus · Yeehaw Junction · US Development (end tenant undisclosed)Proposed
Palm Beach County (6 sites)
- Project Tango AI Data Center Campus · Loxahatchee · PBA Holdings (end tenant undisclosed)Cancelled · Contested
- 365 Data Centers Boca Raton (BC1) · Boca Raton · 365 Data CentersOperating
- 3EX Hosting Data Center, Boca Raton · Boca Raton · 3EX HostingOperating
- Cloud South West Palm Beach 1 · West Palm Beach · Cloud SouthOperating
- Cogent Boca Raton Data Center · Boca Raton · Cogent CommunicationsOperating
- Equinix MI3, Boca Raton · Boca Raton · EquinixOperating
Pinellas County (1 site)
- American Tower Pinellas Park Data Processing Facility · Pinellas Park · American TowerCancelled
Polk County (4 sites)
- Project Swan · Lakeland · Ryan Companies (end operator TBD)Cancelled · 100 MW · Opposed
- Florida Ecopark AI Data Center Campus · Fort Meade · Stonebridge (via Florida Ecopark LLC; end tenant undisclosed)Proposed · 1.2 GW · Contested
- Cielo Haines City Data Center · Haines City · Cielo Digital InfrastructureProposed · 300 MW · Contested
- Cologix LAK1, Lakeland · Lakeland · CologixOperating
Sarasota County (1 site)
- Deep Park Data Center (North Port 300) · North Port · North Port Holdings 300 LLC (end operator undisclosed)Proposed · Contested
St. Lucie County (3 sites)
- Willow Lakes Data Center (West Midway Road) · Fort Pierce · Willow Lakes LLC (end operator undisclosed)Proposed · Opposed
- Atlas Compute AI Data Center Campus · Fort Pierce · Atlas Compute (infrastructure by Penguin Solutions)Proposed · 240 MW
- Sentinel Grove Technology Park (Project Jarvis) · Fort Pierce · Undisclosed developer (marketed as 'Sentinel Grove Technology Park', county code-named 'Project Jarvis')Cancelled
In this article
Florida's data center market is real and growing, but it has not yet produced a lawsuit: no data center litigation is documented in the state as of August 2026. Miami anchors the market as the connectivity gateway between the United States and Latin America, with Jacksonville and Tampa building out capacity for the state's fast-growing population and business base. Most of that footprint sits in urban commercial and industrial zones, which is a big part of why Florida has stayed quiet while Virginia, Georgia, and Wisconsin fill court dockets. Here is what the Florida market looks like, what could change, and what legal options Floridians have if a facility starts affecting their home.
The data center footprint in Florida
Florida's market runs through three metros. Miami is the heavyweight, a global connectivity hub where subsea cables from Latin America and the Caribbean meet the U.S. network, supporting a dense cluster of colocation and carrier facilities. Jacksonville and Tampa host growing capacity serving regional business, healthcare, and government demand.
Most of this footprint is urban and commercial, tucked into business districts and industrial parks rather than rezoned farmland. That siting pattern matters: the states generating lawsuits are the ones where hyperscale campuses landed next to subdivisions and wells. Whether Florida stays quiet depends on where the AI buildout's next wave of projects goes looking for cheap land and power, and the state has plenty of both at its suburban and rural edges.
What Florida residents are dealing with
No organized pattern of Florida data center complaints is documented. For residents near existing or proposed sites, the national record identifies the pressure points:
- Noise. Around-the-clock cooling is the most common complaint near large facilities everywhere, and the basis of active suits in Texas and Wisconsin. Florida's heat means heavy cooling loads year round. See our noise issue page.
- Water and drainage. Construction near homes has produced well, sediment, and flooding complaints in other states, and Florida's shallow water table and storm drainage systems add local stakes. Our guide to construction damage claims covers these cases.
- Generators and emissions. Hurricane-prone Florida facilities carry large backup generator fleets, and generator testing and emissions are recurring complaint categories nationally.
- Electric bills. Large new loads can shift grid costs onto households unless regulators wall them off, the fight now running in Ohio and elsewhere.
Lawsuits and disputes in Florida
None documented as of August 2026. No nuisance suit, rezoning challenge, open meetings case, or moratorium bill tied to a Florida data center appears in the record. This page will be updated if that changes.
The national docket maps what a Florida fight would look like. Rezoning approvals have been voided over defective public notice in Virginia, seventeen Georgia residents are suing to void a rezoning over groundwater and wetlands, and Wisconsin residents brought the first noise class action against a hyperscale AI data center. The consistent thread: residents who engaged before approval and documented carefully afterward are the ones with leverage.
Your legal options in Florida
Floridians facing a proposed or operating facility have the standard paths:
- Private nuisance claims for noise, vibration, dust, or light that substantially interferes with your home, seeking damages or an injunction. Attorneys typically review these free and take strong cases on a contingency fee basis.
- Zoning and permit challenges to a rezoning or special approval, strongest when required procedures were skipped. Appeal windows after a decision are short, often weeks.
- Construction damage claims for flooding, drainage changes, vibration damage, or well impacts caused by site work, brought against the operator or its contractors.
- Ordinance enforcement through county and city noise and code complaints, which builds the record for everything else.
A statute of limitations applies to damage claims, commonly two to six years depending on the state and claim type; a Florida attorney can confirm which deadlines govern your case.
If you live near a Florida data center
Start the record now: a dated log of noise and other impacts, decibel readings at your property line, photos of dust, drainage changes, or construction damage, and written complaints to your city or county every time. If a project near you is still seeking approval, put noise, water, and generator questions into the public record before the vote.
Then get a professional read. Our free intake form lets you tell us what is happening; where a participating attorney who handles these matters in Florida is available, we may share your information with them with your consent, but we cannot promise that anyone will contact you.
No Florida case yet. Here is what is happening nearby.
We have not documented a filed case in Florida. That does not mean a claim is not available to you. These cases come from states next door, where the same operators build and the same harms come up, and the two landmark outcomes below them are the results every neighbor should know about.
- Active litigationGeorgiaGeorgia Families Sue Meta Over Their Wells
Pending, filed late August 2026, Gwinnett County
- Active litigationGeorgiaCoweta County's Project Sail Lawsuit
Pending, Coweta County Superior Court
- DismissedAlabamaBessemer's Project Marvel Lawsuit
Dismissed June 22, 2026 by joint stipulation
- SettledOregon· Landmark caseAmazon's $20.5 Million Nitrate Settlement
Settled: $20.5 million, motion for preliminary approval filed March 31, 2026
- SettledMichigan· Landmark caseSaline Township v. the $7 Billion Data Center
Settled; project proceeding with community benefits package
Your rights do not depend on whether someone in Florida has sued yet. Start with whether you can sue a data center, then what to document now, because the evidence you gather today is what a lawyer will ask for whenever you act.
Frequently asked questions
Can I sue a data center in Florida?
Florida residents can bring private nuisance and property damage claims against a facility that substantially interferes with their home, and can challenge defective zoning approvals. No data center lawsuit is documented in Florida yet as of August 2026, but these are the same tools behind active cases in other states, and an attorney can evaluate your facts.
Where are Florida's data centers?
The market clusters in three metros: Miami, the connectivity gateway to Latin America and the state's largest concentration, plus growing capacity in Jacksonville and Tampa. Most facilities sit in urban commercial and industrial zones rather than near residential neighborhoods.
What should I do if a data center is proposed near my Florida home?
Engage before approval: attend hearings, submit written comments, and press for enforceable conditions on noise, drainage, water, and generator testing. If the process looks defective, contact an attorney quickly, because zoning challenges run on short deadlines and procedural flaws have voided approvals in other states.
Do data center backup generators cause problems for neighbors?
They can. Large facilities maintain diesel generator fleets that require regular testing, which produces noise and emissions, and hurricane-prone Florida sites carry especially large fleets. Generator testing schedules and emissions limits are permit conditions residents can review and press to have enforced.
Will data centers raise electric bills in Florida?
It depends on how regulators allocate the cost of serving large new loads. Other states have created dedicated data center rate classes to keep those costs off household bills, and those decisions are being litigated. Consumer participation in utility proceedings is the main lever if the issue arrives in Florida.
Is a data center disrupting your home in Florida?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us