Facility record
Operating
- Operator
- Centersquare
- Facility type
- Data center
- Location
- 9310 Florida Palm Drive, Tampa, Hillsborough County, FL, 33619
- Coordinates
- 27.9455, -82.3511
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Power source
- Grid
- Cooling
- Not established
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Opposition and litigation at this site
Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over Centersquare Tampa TPA1 in Tampa, Hillsborough County, Florida appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Operator lists utility capacity of 9 MW, UPS capacity of 2.5 MW and generator capacity of 9 MW.
Operator lists chilled water cooling. As of October 2026, the heat-rejection method is not stated.
Notes on the record
19,245 sq ft of raised floor; 9MW of utility and generator capacity against 2.5MW of UPS, so as of October 2026 no IT capacity is stated and none is recorded. Roughly 8 miles east of downtown Tampa, outside mandatory evacuation zones, with a 130-mph wind-rated TPO roof. Formerly branded Cyxtera TPA1 / TP1, OSM still carries the Cyxtera name; Centersquare is the current operator.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- AceHost Marion Mining Facility · Tampa · AceHost6 mi · Operating · 3 MW
- H5 Data Centers Tampa (Franklin Exchange, formerly 365 Data Centers TA1) · Tampa · H5 Data Centers (HyscaleIX JV with Novacap)7 mi · Operating
- Cogent Tampa Data Center · Tampa · Cogent Communications7 mi · Operating
- Flexential Tampa - North (TPA03) · Tampa · Flexential9 mi · Operating · 3 MW
- Hivelocity Tampa 1 (TPA1) · Tampa · Hivelocity12 mi · Operating
- Flexential Tampa - West · Tampa · Flexential13 mi · Operating · 1.81 MW
- Project Swan · Lakeland · Ryan Companies (end operator TBD)22 mi · Cancelled · 100 MW · Opposed
- American Tower Pinellas Park Data Processing Facility · Pinellas Park · American Tower25 mi · Cancelled
Questions people ask about this site
Is there opposition to the Centersquare Tampa TPA1 data center in Tampa?
Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over Centersquare Tampa TPA1 in Tampa, Hillsborough County, Florida appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Centersquare Tampa TPA1 data center?
No lawsuit over Centersquare Tampa TPA1 appears in the record we track as of October 28, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Centersquare Tampa TPA1 use?
No water withdrawal figure for Centersquare Tampa TPA1 is on record here. Cooling is recorded as unknown, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Centersquare Tampa TPA1, and how big is it?
Centersquare is the operator on record. We hold 17 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Centersquare Tampa TPA1," updated October 28, 2026, https://suedatacenters.org/data-centers/centersquare-tpa1-tampa-fl.
Facility data from Compute Atlas (E. Kubiak), version 1.35.1 (November 2, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/centersquare-tpa1-tampa-fl, retrieved November 5, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Centersquare, Tampa TPA1 data center page: 19,245 sq ft raised floor, 9MW utility power, 2.5MW UPS, 9MW generator · Centersquare · retrieved October 20, 2026
- 2.PeeringDB facility registry, "Centersquare Tampa (TPA1)", 9310 Florida Palm Drive, Tampa FL 33619 · PeeringDB · retrieved September 14, 2026
- 3.OpenStreetMap via Overpass API, way 523886201 "Cyxtera Tampa TP1", building footprint centroid 27.9455353, -82.3511020 · OpenStreetMap contributors · retrieved September 14, 2026 · original offline, no archived copy found
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us