Data Center Registry
Metrobloks MIA-A1 (MB01)
Miami, Miami-Dade County, Florida · All 4 Metrobloks sites
Metrobloks MIA-A1 (MB01) is a proposed data center in Miami, Florida (Miami-Dade County), operated by Metrobloks. The public record puts it at announced April 2025, 15.2 MW planned, 4.05 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Metrobloks
- Facility type
- Data center, AI use confirmed
- Location
- 500 NW 137th Avenue, Miami, Miami-Dade County, FL
- Coordinates
- 25.7900, -80.4100 (approximate)
- Power capacity
- 15.2 MW planned
- Land
- 4.05 acres
- Investment
- Not established from a public source
- Announced
- April 2025
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- April 2025ProposedMetrobloks (Los Angeles-based) closed on 4.05 acres in Miami's Airport West submarket (seller: Sagard Real Estate; buyer broker: Cushman & Wakefield; seller broker: Transwestern) to build a 15.2 MW AI-ready data center; targeting operations by end of 2026. Source: Metrobloks
Opposition and litigation at this site
Nothing on record as of August 2, 2026. No lawsuit, organized opposition, or contested hearing over Metrobloks MIA-A1 (MB01) in Miami, Miami-Dade County, Florida appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
500 NW 137th Avenue, Miami-Dade County (Airport West submarket, near Miami International Airport). Land acquisition closed March 31, 2025; targeting operations by end of 2026, but no permit or construction-start source located -- recorded proposed, not under_construction. Capacity is disputed between the operator's own two pages: 15.2 MW at the press-release/land-acquisition stage (independently corroborated by Cushman & Wakefield) vs. 16.8 MW critical IT on the current site page, which separately claims ~40,500 sq ft of total whitespace across two 15,200 sq ft halls (an internal arithmetic inconsistency on the operator's own page). Recorded the better-corroborated 15.2 MW figure. The operator's site page states ~21ms round-trip latency to the NAP of the Americas and Uptime Tier III design intent with liquid cooling to 150kW/rack; no confirmed total-building square footage, investment figure, or jobs figure located -- omitted per project convention rather than using unconfirmed numbers. No opposition/permit coverage found this session; Airport West is a commercial/industrial submarket. Coordinates are an approximate Airport West-area estimate, not a parcel-confirmed geocode of the street address.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- RadiusDC Miami I · Sweetwater · RadiusDC2 mi · Operating · 9.2 MW
- QTS Miami (MIA1) · Sweetwater · QTS Data Centers2 mi · Operating · 2 MW
- Iron Mountain MIA-1 · Westview · Iron Mountain12 mi · Under construction · 16 MW · Contested
- Equinix MI1 (NAP of the Americas) · Miami · Equinix14 mi · Operating
- Digital Realty MIA10 · Miami · Digital Realty14 mi · Operating
- Redivider Homestead Bitcoin Mining Facility · Homestead · Redivider Blockchain (joint venture with Esperanza Opportunity Fund)23 mi · Proposed · 10 MW
Questions people ask about this site
Is there opposition to the Metrobloks MIA-A1 (MB01) data center in Miami?
Nothing on record as of August 2, 2026. No lawsuit, organized opposition, or contested hearing over Metrobloks MIA-A1 (MB01) in Miami, Miami-Dade County, Florida appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Metrobloks MIA-A1 (MB01) data center?
No lawsuit over Metrobloks MIA-A1 (MB01) appears in the record we track as of August 2, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Metrobloks MIA-A1 (MB01) use?
No water withdrawal figure for Metrobloks MIA-A1 (MB01) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Metrobloks MIA-A1 (MB01), and how big is it?
Metrobloks is the operator on record. We hold 4 sites for that company across the registry. Capacity on record is 15.2 MW. The site is recorded at 4.05 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Metrobloks MIA-A1 (MB01)," updated August 2, 2026, https://suedatacenters.org/data-centers/metrobloks-mia-a1-miami-fl.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/metrobloks-mia-a1-miami-fl, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Metrobloks acquires land in Miami, FL to build 15.2MW AI-ready data center · Metrobloks · retrieved August 2, 2026
- 2.MIA A1 (MB01) site page · Metrobloks · retrieved August 2, 2026
- 3.Cushman & Wakefield represents Metrobloks in acquisition of developable land in Miami · Cushman & Wakefield · retrieved August 2, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us