EdgeConneX MIA03 (Beacon Station, withdrawn)
Medley, Miami-Dade County, Florida · All 21 EdgeConneX sites · Every EdgeConneX case on our tracker
EdgeConneX MIA03 (Beacon Station, withdrawn) is a cancelled data center in Medley, Florida (Miami-Dade County), operated by EdgeConneX. The public record puts it at announced December 22, 2022, 6.25 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Cancelled
- Operator
- EdgeConneX
- Facility type
- Data center
- Location
- Medley, Miami-Dade County, FL
- Coordinates
- 25.8689, -80.3792 (approximate)
- Power capacity
- Not established from a public source
- Land
- 6.25 acres
- Investment
- Not established from a public source
- Announced
- December 22, 2022
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- June 2025CancelledProject never advanced; EdgeConneX sold the vacant site in June 2025 for $15.35M to Flagler Building I LLC (Ambrose), which plans an 87,877 sq ft warehouse instead. Source: Miami Airport Warehouses
- December 22, 2022ProposedPre-application filed with Miami-Dade County for a two-story, 145,700 sq ft data center on 6.25 acres at Beacon Station. Source: Miami Airport Warehouses (citing South Florida Business Journal)
Opposition and litigation at this site
Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over EdgeConneX MIA03 (Beacon Station, withdrawn) in Medley, Miami-Dade County, Florida appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Planned third EdgeConneX Miami site near the southwest corner of NW 106th Street and NW 112th Avenue in the Beacon Station business park (directly west of 10550 NW 112th Ave), western Miami-Dade County. Land was sold in June 2025 and re-planned as a Ware Malcomb-designed warehouse.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- QTS Miami (MIA1) · Sweetwater · QTS Data Centers5 mi · Operating · 2 MW
- RadiusDC Miami I · Sweetwater · RadiusDC6 mi · Operating · 9.2 MW
- Metrobloks MIA-A1 (MB01) · Miami · Metrobloks6 mi · Proposed · 15.2 MW
- Equinix MI6, Doral · Doral · Equinix6 mi · Operating
- CoreSite MI2, Doral · Doral · CoreSite6 mi · Operating
- Iron Mountain MIA-1 · Westview · Iron Mountain8 mi · Under construction · 16 MW · Contested
- CoreSite MI1, Miami · Miami · CoreSite11 mi · Operating
- Equinix MI1 (NAP of the Americas) · Miami · Equinix13 mi · Operating
Questions people ask about this site
Is there opposition to the EdgeConneX MIA03 (Beacon Station, withdrawn) data center in Medley?
Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over EdgeConneX MIA03 (Beacon Station, withdrawn) in Medley, Miami-Dade County, Florida appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the EdgeConneX MIA03 (Beacon Station, withdrawn) data center?
No lawsuit over EdgeConneX MIA03 (Beacon Station, withdrawn) appears in the record we track as of September 21, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does EdgeConneX MIA03 (Beacon Station, withdrawn) use?
No water withdrawal figure for EdgeConneX MIA03 (Beacon Station, withdrawn) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates EdgeConneX MIA03 (Beacon Station, withdrawn), and how big is it?
EdgeConneX is the operator on record. We hold 21 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 6.25 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "EdgeConneX MIA03 (Beacon Station, withdrawn)," updated September 21, 2026, https://suedatacenters.org/data-centers/edgeconnex-mia03-beacon-station-medley-fl.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/edgeconnex-mia03-beacon-station-medley-fl, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Miami-Dade data center plans scrapped for warehouse · Miami Airport Warehouses · retrieved September 21, 2026
- 2.Data center proposed at Beacon Station · Miami Airport Warehouses (citing South Florida Business Journal) · retrieved September 21, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us