ReadySetFundGrow FishBowl AI Edge Micro-Datacenter is a proposed data center in Homestead, Florida (Miami-Dade County), operated by ReadySetFundGrow (subsidiary of Farrington Capital Group). The public record puts it at announced March 4, 2026.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- ReadySetFundGrow (subsidiary of Farrington Capital Group)
- Facility type
- Data center
- Location
- 23095 S Dixie Hwy, Homestead, Miami-Dade County, FL, 33170
- Coordinates
- 25.5525, -80.3947 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- March 4, 2026
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- March 4, 2026ProposedRemergify and Farrington Capital Group announce plans for the ReadySetFundGrow campus with a micro-datacenter Source: ACCESS Newswire via Mediabistro
Opposition and litigation at this site
Nothing on record as of October 20, 2026. No lawsuit, organized opposition, or contested hearing over ReadySetFundGrow FishBowl AI Edge Micro-Datacenter in Homestead, Miami-Dade County, Florida appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
The planned 10-rack micro-datacenter (the 'FishBowl') would sit in a 2,295 sq ft building on a 20,000 sq ft parcel fronting US-1. It is part of a campus that also includes a tech incubator, a virtual office hub and a 15-port EV charging hub. Development depends on closing $1,000,000 in senior secured financing, followed by a phased buildout of about 9 months. The March 20 release cites 1,600-amp power capacity. All figures are self-reported by the company. Coordinates are a street-address geocode.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Redivider Homestead Bitcoin Mining Facility · Homestead · Redivider Blockchain (joint venture with Esperanza Opportunity Fund)7 mi · Proposed · 10 MW
- RadiusDC Miami I · Sweetwater · RadiusDC16 mi · Operating · 9.2 MW
- Metrobloks MIA-A1 (MB01) · Miami · Metrobloks16 mi · Proposed · 15.2 MW
- Equinix MI6, Doral · Doral · Equinix16 mi · Operating
- QTS Miami (MIA1) · Sweetwater · QTS Data Centers17 mi · Operating · 2 MW
- EdgeConneX MIA01, Miami · Miami · EdgeConneX17 mi · Operating · 1.5 MW
- CoreSite MI2, Doral · Doral · CoreSite17 mi · Operating
- CoreSite MI1, Miami · Miami · CoreSite20 mi · Operating
Questions people ask about this site
Is there opposition to the ReadySetFundGrow FishBowl AI Edge Micro-Datacenter data center in Homestead?
Nothing on record as of October 20, 2026. No lawsuit, organized opposition, or contested hearing over ReadySetFundGrow FishBowl AI Edge Micro-Datacenter in Homestead, Miami-Dade County, Florida appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the ReadySetFundGrow FishBowl AI Edge Micro-Datacenter data center?
No lawsuit over ReadySetFundGrow FishBowl AI Edge Micro-Datacenter appears in the record we track as of October 20, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does ReadySetFundGrow FishBowl AI Edge Micro-Datacenter use?
No water withdrawal figure for ReadySetFundGrow FishBowl AI Edge Micro-Datacenter is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates ReadySetFundGrow FishBowl AI Edge Micro-Datacenter, and how big is it?
ReadySetFundGrow (subsidiary of Farrington Capital Group) is the operator on record. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "ReadySetFundGrow FishBowl AI Edge Micro-Datacenter," updated October 20, 2026, https://suedatacenters.org/data-centers/readysetfundgrow-fishbowl-homestead-fl.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/readysetfundgrow-fishbowl-homestead-fl, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Remergify & Farrington Capital Group announce plans to develop ReadySetFundGrow, South Miami-Dade's first micro-datacenter, tech incubator & EV charging hub (ACCESS Newswire release, Mar 4 2026) · ACCESS Newswire via Mediabistro · retrieved October 20, 2026
- 2.ReadySetFundGrow announces South Dade AI edge micro-datacenter and Opportunity Zone investment platform (Mar 20 2026) · ACCESS Newswire via Mediabistro · retrieved October 20, 2026
- 3.OpenStreetMap Nominatim geocode of 23095 South Dixie Highway, 33170 · OpenStreetMap · retrieved October 20, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us