Sue Data Centers

Data Center Registry

iM Critical Miami Data Center

Miami, Miami-Dade County, Florida

OperatingNo reception on recordRecord updated October 2, 2026

iM Critical Miami Data Center is an operating data center in Miami, Florida (Miami-Dade County), operated by iM Critical (iM Data Centers). The public record puts it at 5 MW operating.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
iM Critical (iM Data Centers)
Facility type
Data center
Location
100 NE 80th Terrace, Miami, Miami-Dade County, FL, 33138
Coordinates
25.8484, -80.1949 (approximate)
Power capacity
5 MW operating
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. June 9, 2022
    Operating
    Operator announced the launch of its Miami data center. Source: iM Critical

Opposition and litigation at this site

Nothing on record as of October 2, 2026. No lawsuit, organized opposition, or contested hearing over iM Critical Miami Data Center in Miami, Miami-Dade County, Florida appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Notes on the record

The 2022 launch release describes a 100,000 sq ft purpose-built building with over 60,000 sq ft for colocation, 5 MW of power and HPC environments up to 75 kW/rack. Data Center Frontier (2025-01-08) describes iM Data Centers' 100,000 sq ft Miami facility as launching with 10 MW of critical capacity, with potential for up to 40 MW more, and an Accelsius two-phase direct-to-chip cooling demonstration. This is apparently the same building under the company's later name. The operator-stated 5 MW is kept as the operational value. Address and coordinates are from PeeringDB; coordinates are approximate.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near iM Critical Miami Data Center?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the iM Critical Miami Data Center in Miami?

Nothing on record as of October 2, 2026. No lawsuit, organized opposition, or contested hearing over iM Critical Miami Data Center in Miami, Miami-Dade County, Florida appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the iM Critical Miami Data Center?

No lawsuit over iM Critical Miami Data Center appears in the record we track as of October 2, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does iM Critical Miami Data Center use?

No water withdrawal figure for iM Critical Miami Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates iM Critical Miami Data Center, and how big is it?

iM Critical (iM Data Centers) is the operator on record. Capacity on record is 5 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "iM Critical Miami Data Center," updated October 2, 2026, https://suedatacenters.org/data-centers/im-critical-miami-fl.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/im-critical-miami-fl, retrieved October 11, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Introducing iM Critical's Miami Data Center: Miami's Next-Gen Hub for Mission-Critical Colocation · iM Critical · retrieved October 2, 2026
  2. 2.iM Critical Miami (facility record) · PeeringDB · retrieved October 2, 2026
  3. 3.Accelsius and iM Data Centers Demo Next-Gen Cooling and Sustainability at Miami Data Center · Data Center Frontier · retrieved October 2, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us