Sue Data Centers

Data Center Registry

Athlon BT El Reno Bitcoin Mining Site

El Reno, Canadian County, Oklahoma

OperatingNo reception on recordRecord updated October 16, 2026

Athlon BT El Reno Bitcoin Mining Site is an operating crypto mining site in El Reno, Oklahoma (Canadian County), operated by Athlon Blockchain LLC (Athlon BT).

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Athlon Blockchain LLC (Athlon BT)
Facility type
Crypto mining
Location
El Reno, Canadian County, OK
Coordinates
35.4935, -97.9815 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. August 31, 2026
    Operating
    El Reno says the company kept building and operating despite a June 2023 stop-work order, without a Certificate of Occupancy. City staff condemned the property after a roughly 3-million-gallon water leak. Source: KOKH Fox 25

Opposition and litigation at this site

Nothing on record as of October 16, 2026. No lawsuit, organized opposition, or contested hearing over Athlon BT El Reno Bitcoin Mining Site in El Reno, Canadian County, Oklahoma appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Notes on the record

Status caveat: the status vocabulary has no suspended or condemned value. The operational status reflects officials' belief that the site was operating. It does not mean the site is running now: the city condemned the property in late August 2026, and operations may not restart until the fire and life-safety violations are cured. The site is on private property in the 800 block of W. Jensen Rd., rezoned Moderate Industrial in 2019. The city issued a stop-work order in June 2023. Newsweek, citing Canadian County property records via KOCO, names Athlon BT as owner and describes it as a developer of containerized mobile data centers for AI and Bitcoin mining. No MW figure has been published. The coordinates are an OSM road-level point for W. Jensen Rd., not the parcel.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near Athlon BT El Reno Bitcoin Mining Site?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the Athlon BT El Reno Bitcoin Mining Site data center in El Reno?

Nothing on record as of October 16, 2026. No lawsuit, organized opposition, or contested hearing over Athlon BT El Reno Bitcoin Mining Site in El Reno, Canadian County, Oklahoma appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Athlon BT El Reno Bitcoin Mining Site data center?

No lawsuit over Athlon BT El Reno Bitcoin Mining Site appears in the record we track as of October 16, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Athlon BT El Reno Bitcoin Mining Site use?

No water withdrawal figure for Athlon BT El Reno Bitcoin Mining Site is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Athlon BT El Reno Bitcoin Mining Site, and how big is it?

Athlon Blockchain LLC (Athlon BT) is the operator on record. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Athlon BT El Reno Bitcoin Mining Site," updated October 16, 2026, https://suedatacenters.org/data-centers/athlon-bt-el-reno-ok.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/athlon-bt-el-reno-ok, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.El Reno says Bitcoin mining facility may have operated unlawfully before water leak · KOKH Fox 25 · retrieved October 16, 2026
  2. 2.Data center leaks 3 million gallons as Oklahoma faces severe drought · Newsweek · retrieved October 16, 2026 · original offline, archived copy from October 15, 2026
  3. 3.OpenStreetMap Nominatim record for West Jensen Road, El Reno, Oklahoma · OpenStreetMap · retrieved October 16, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us