Sue Data Centers

Data Center Registry

Genesis Digital Assets Anderson Bitcoin Mining Data Center

Anderson, Anderson County, South Carolina · All 2 Genesis Digital Assets sites

OperatingNo reception on recordRecord updated September 10, 2026

Genesis Digital Assets Anderson Bitcoin Mining Data Center is an operating crypto mining site in Anderson, South Carolina (Anderson County), operated by Genesis Digital Assets. The public record puts it at 18 MW operating.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Genesis Digital Assets
Facility type
Crypto mining
Location
Anderson, Anderson County, SC
Coordinates
34.5069, -82.6506 (approximate)
Power capacity
18 MW operating
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Duke Energy
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. February 2023
    Operating
    Facility active since February 2023 with 18 MW of capacity, in a repurposed abandoned textile warehouse. Source: SC Biz News

Opposition and litigation at this site

Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Genesis Digital Assets Anderson Bitcoin Mining Data Center in Anderson, Anderson County, South Carolina appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Reporting states the Anderson facility returns excess power to the Duke Energy grid when needed, and that it uses Hitachi dry-type distribution transformers.

Notes on the record

GDA = Genesis Digital Assets. Coordinates are an approximate geocode of Anderson, SC, the source places the site 'near the community of Anderson' with no address. Current ownership/operation has not been re-verified against a 2026 source; the record reflects the operator named at opening. Re-checked 2026-09-10: no status change found, and no new fillable field secured, this is an absence-of-adverse-signal check, not an independent confirmation the site is still running. The facility's own cited source (scbiz.com, GDA's Aug 2023 opening announcement, re-fetched today) remains the most recent primary account: operational since Feb 2023 at 18MW near Anderson, on Duke Energy's grid via Hitachi dry-type transformers, built into a repurposed textile warehouse. Checked for a newer/contradicting signal at the county tier: Anderson County's three most recent County Council agenda packets (2026-09-01, 2026-08-18, 2026-06-16) and the County's audited FY2025 ACFR (period ended 2025-06-30) contain zero reference to Genesis Digital Assets, GDA, bitcoin, or crypto-mining -- no ordinance amendment, enforcement action, or FILOT dispute surfaced. Anderson County's Note 13 (Tax Abatements) is AGGREGATE-ONLY ($10,447,545 countywide FY25, not itemized by company) so it neither confirms nor denies a site-level FILOT -- unlike some SC municipal ACFRs, this county's note does not itemize. Could NOT check the SC PSC docket system (dms.psc.sc.gov) or FERC eLibrary -- both are JS-rendered single-page apps that return no content to a static fetch this session -- nor run a general web search (WebSearch tool quota was exhausted for this session before I started, and DuckDuckGo/Bing/Marginalia all returned CAPTCHA/anomaly-detection blocks to direct fetches; web.archive.org was reporting 'Temporarily Offline'). investmentUsd, landAcres, water, location.street/postalCode, subsidies, and aiClassification remain unresolved for these same tooling reasons -- NOT because any source confirmed their absence. The 2023 article's job figure ('150 jobs, 125 local contractors') is an explicit combined total across GDA's Anderson site AND the two Union/Lockhart sites together, with no per-site breakdown given anywhere in the source -- assigning any portion of it to this record specifically would be a fabricated split, so `jobs` is deliberately NOT filled. `community` is also not filled: the only community-reception language in the source is GDA's own press quote about being 'welcomed... warmly,' which is the company describing itself, not documented independent public reception.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Genesis Digital Assets Anderson Bitcoin Mining Data Center in Anderson?

Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Genesis Digital Assets Anderson Bitcoin Mining Data Center in Anderson, Anderson County, South Carolina appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Genesis Digital Assets Anderson Bitcoin Mining Data Center?

No lawsuit over Genesis Digital Assets Anderson Bitcoin Mining Data Center appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Genesis Digital Assets Anderson Bitcoin Mining Data Center use?

No water withdrawal figure for Genesis Digital Assets Anderson Bitcoin Mining Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Genesis Digital Assets Anderson Bitcoin Mining Data Center, and how big is it?

Genesis Digital Assets is the operator on record. We hold 2 sites for that company across the registry. Capacity on record is 18 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Genesis Digital Assets Anderson Bitcoin Mining Data Center," updated September 10, 2026, https://suedatacenters.org/data-centers/genesis-digital-assets-anderson-sc.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/genesis-digital-assets-anderson-sc, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Bitcoin miner opens three data centers in Anderson, Union counties · SC Biz News · retrieved August 26, 2026
  2. 2.OpenStreetMap Nominatim geocode for Anderson, Anderson County, SC · OpenStreetMap · retrieved August 26, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us