Data Center Registry
Digital Fortress Lynnwood (SEA1)
Lynnwood, Snohomish County, Washington · All 5 Digital Fortress sites
Digital Fortress Lynnwood (SEA1) is an operating data center in Lynnwood, Washington (Snohomish County), operated by Digital Fortress. The public record puts it at 10 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Digital Fortress
- Facility type
- Data center
- Location
- 4200 194th Street SW, Lynnwood, Snohomish County, WA
- Coordinates
- 47.8224, -122.2896
- Power capacity
- 10 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- 2006OperatingBaxtel gives 2006 as the year opened. Source: Baxtel
Opposition and litigation at this site
Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over Digital Fortress Lynnwood (SEA1) in Lynnwood, Snohomish County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Operated by Digital Fortress; the building itself has changed hands repeatedly (NetRiver, Bytegrid, Lincoln Rackhouse, Landmark Infrastructure), so no owner is asserted here - only the operator. Total power is not published by the operator and is not recorded.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- KOMO Plaza (formerly Fisher Plaza) · Seattle · GI Partners14 mi · Operating
- Westin Building (Digital Realty Seattle SEA10) · Seattle · Digital Realty15 mi · Operating
- Equinix Seattle SE3 · Seattle · Equinix15 mi · Operating
- Sabey Intergate.East Building 1 · Tukwila · Sabey Data Centers23 mi · Operating
- Sabey Intergate.West Building C · Tukwila · Sabey Data Centers23 mi · Operating
- Sabey Intergate.East Building 3 · Tukwila · Sabey Data Centers23 mi · Operating
- Digital Realty SEA1 (Intergate Seattle-East, Bldg 4) · Tukwila · Digital Realty23 mi · Operating
- Sabey Intergate.West Building B · Tukwila · Sabey Data Centers23 mi · Operating
Questions people ask about this site
Is there opposition to the Digital Fortress Lynnwood (SEA1) data center in Lynnwood?
Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over Digital Fortress Lynnwood (SEA1) in Lynnwood, Snohomish County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Digital Fortress Lynnwood (SEA1) data center?
No lawsuit over Digital Fortress Lynnwood (SEA1) appears in the record we track as of September 21, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Digital Fortress Lynnwood (SEA1) use?
No water withdrawal figure for Digital Fortress Lynnwood (SEA1) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Digital Fortress Lynnwood (SEA1), and how big is it?
Digital Fortress is the operator on record. We hold 5 sites for that company across the registry. Capacity on record is 10 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Digital Fortress Lynnwood (SEA1)," updated September 21, 2026, https://suedatacenters.org/data-centers/digital-fortress-lynnwood-wa.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/digital-fortress-lynnwood-wa, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.OSM way 589360530 - 'Digital Fortress Lynnwood', telecom=data_center, website digital-fortress.com/lynnwood-data-center/ · OpenStreetMap contributors · retrieved September 17, 2026
- 2.Digital Fortress Lynnwood - 4200 194th Street SW, Lynnwood WA; 15,941 sq ft data floor; opened 2006 · Baxtel · retrieved September 21, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us