Lakeside Industries Dallesport Data Center (proposed)
Dallesport, Klickitat County, Washington
Lakeside Industries Dallesport Data Center (proposed) is a proposed data center in Dallesport, Washington (Klickitat County), operated by Lakeside Industries. The public record puts it at announced August 26, 2026, 434 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Lakeside Industries
- Facility type
- Data center
- Location
- Dallesport, Klickitat County, WA
- Coordinates
- 45.6173, -121.1795 (approximate)
- Power capacity
- Not established from a public source
- Land
- 434 acres
- Investment
- Not established from a public source
- Announced
- August 26, 2026
- Utility
- Klickitat Public Utility District
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- August 26, 2026ProposedKlickitat PUD confirmed a data center proposed on a 434-acre Lakeside Industries parcel in Dallesport; the land is zoned single-family residential and would need a county conditional use permit. Source: Columbia Gorge News
Opposition and litigation at this site
Nothing on record as of October 12, 2026. No lawsuit, organized opposition, or contested hearing over Lakeside Industries Dallesport Data Center (proposed) in Dallesport, Klickitat County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
KPUD submitted a 1,260 MW line-load connection request to the Bonneville Power Administration on behalf of Lakeside Industries in March; BPA declined to share details. Power application documents describe diesel emergency standby generators.
Notes on the record
Seattle-based asphalt paving company; did not respond to requests for comment. Location is the Dallesport community point, not the parcel. Partner Avison Young named by the Spokesman-Review but not independently confirmed.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Dallesport Server Farm (Webster Orchards / Williams Ranch site) · Dallesport · Webster Orchards (landowner; developer not selected)under 1 mile · Proposed
- Google The Dalles Data Center, 3500 River Road (Port of The Dalles) · The Dalles · Google1 mi · Under construction
- Google The Dalles Data Center Campus · The Dalles · Google1 mi · Operating · 300 MW · Contested
- Energizer Data Center (BPA L0493 / L0497) · Savion (Shell Energy subsidiary), per BPA application documents21 mi · Proposed
- Energizer II Data Center (BPA L0702) · Savion (Shell Energy subsidiary), per BPA application documents21 mi · Proposed
- STACK Infrastructure Goldendale Data Center · Goldendale · STACK Infrastructure22 mi · Proposed · 958 MW · Opposed
Questions people ask about this site
Is there opposition to the Lakeside Industries Dallesport Data Center (proposed) in Dallesport?
Nothing on record as of October 12, 2026. No lawsuit, organized opposition, or contested hearing over Lakeside Industries Dallesport Data Center (proposed) in Dallesport, Klickitat County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Lakeside Industries Dallesport Data Center (proposed)?
No lawsuit over Lakeside Industries Dallesport Data Center (proposed) appears in the record we track as of October 12, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Lakeside Industries Dallesport Data Center (proposed) use?
No water withdrawal figure for Lakeside Industries Dallesport Data Center (proposed) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Lakeside Industries Dallesport Data Center (proposed), and how big is it?
Lakeside Industries is the operator on record. No capacity figure is on record for this site. The site is recorded at 434 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Lakeside Industries Dallesport Data Center (proposed)," updated October 12, 2026, https://suedatacenters.org/data-centers/lakeside-industries-dallesport-data-center-wa.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/lakeside-industries-dallesport-data-center-wa, retrieved October 16, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Columbia Gorge News: KPUD confirms second Dallesport data center proposal on Lakeside Industries parcel (Aug 26, 2026) · Columbia Gorge News · retrieved October 12, 2026
- 2.Spokesman-Review: Rural Klickitat County faces surge in data center proposals (Oct 7, 2026) · The Spokesman-Review / Washington State Standard · retrieved October 12, 2026
- 3.OpenStreetMap Nominatim geocode for Dallesport, WA (approximate point; no parcel coordinates published) · OpenStreetMap · retrieved October 12, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us