Energizer Data Center (BPA L0493 / L0497)
Klickitat County, Washington · All 3 Savion sites
Energizer Data Center (BPA L0493 / L0497) is a proposed data center in Washington (Klickitat County), operated by Savion (Shell Energy subsidiary), per BPA application documents.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Savion (Shell Energy subsidiary), per BPA application documents
- Facility type
- Data center
- Location
- Klickitat County, WA
- Coordinates
- 45.7771, -120.8128 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Klickitat Public Utility District
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 2, 2026ProposedReported as an in-progress BPA large-load request for a data center along Hoctor Road in the Columbia Hills area; land owned by 101 Bar Ranches LLC. Source: The Goldendale Sentinel
Opposition and litigation at this site
Nothing on record as of October 12, 2026. No lawsuit, organized opposition, or contested hearing over Energizer Data Center (BPA L0493 / L0497) in Klickitat County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
BPA line-and-load queue L0493 (submitted 2021-06-29, 78 MW, facility study completed, point of interconnection KPUD Energizer Substation) and L0497 'Energizer Data Center Expanded Capacity' (queued 2021-07-29, 200 MW, active). Queue positions are not awards.
Notes on the record
Savion said preliminary feasibility work is underway. The location is a road-segment point, not a parcel.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Energizer II Data Center (BPA L0702) · Savion (Shell Energy subsidiary), per BPA application documentsunder 1 mile · Proposed
- STACK Infrastructure Goldendale Data Center · Goldendale · STACK Infrastructure3 mi · Proposed · 958 MW · Opposed
- Dallesport Server Farm (Webster Orchards / Williams Ranch site) · Dallesport · Webster Orchards (landowner; developer not selected)21 mi · Proposed
- Lakeside Industries Dallesport Data Center (proposed) · Dallesport · Lakeside Industries21 mi · Proposed
- Google The Dalles Data Center, 3500 River Road (Port of The Dalles) · The Dalles · Google22 mi · Under construction
- Google The Dalles Data Center Campus · The Dalles · Google22 mi · Operating · 300 MW · Contested
- AWS Arlington Data Center Campus · Arlington · Amazon Web Services30 mi · Proposed
Questions people ask about this site
Is there opposition to the Energizer Data Center (BPA L0493 / L0497) in Klickitat County, Washington?
Nothing on record as of October 12, 2026. No lawsuit, organized opposition, or contested hearing over Energizer Data Center (BPA L0493 / L0497) in Klickitat County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Energizer Data Center (BPA L0493 / L0497)?
No lawsuit over Energizer Data Center (BPA L0493 / L0497) appears in the record we track as of October 12, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Energizer Data Center (BPA L0493 / L0497) use?
No water withdrawal figure for Energizer Data Center (BPA L0493 / L0497) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Energizer Data Center (BPA L0493 / L0497), and how big is it?
Savion (Shell Energy subsidiary), per BPA application documents is the operator on record. We hold 3 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Energizer Data Center (BPA L0493 / L0497)," updated October 12, 2026, https://suedatacenters.org/data-centers/energizer-data-center-hoctor-road-klickitat-wa.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/energizer-data-center-hoctor-road-klickitat-wa, retrieved October 16, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Goldendale Sentinel: More data centers possible for county (Sep 2, 2026) · The Goldendale Sentinel · retrieved October 12, 2026
- 2.Spokesman-Review: Shell Energy/Savion named on Energizer applications (Oct 7, 2026) · The Spokesman-Review / Washington State Standard · retrieved October 12, 2026
- 3.OpenStreetMap Nominatim geocode for Hoctor Road, Klickitat County (approximate) · OpenStreetMap · retrieved October 12, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us