Energizer II Data Center (BPA L0702) is a proposed data center in Washington (Klickitat County), operated by Savion (Shell Energy subsidiary), per BPA application documents.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Savion (Shell Energy subsidiary), per BPA application documents
Facility type
Data center, AI use likely
Location
Klickitat County, WA
Coordinates
45.7755, -120.8010 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. September 2, 2026
    Proposed
    Reported as a 1,000 MW BPA large-load request between Chamberlain Goodnoe Road and Goodnoe Hills Road; land owned by 101 Bar Ranches LLC; described as a data center, an AI center, or both, in due diligence. Source: The Goldendale Sentinel

Opposition and litigation at this site

Nothing on record as of October 12, 2026. No lawsuit, organized opposition, or contested hearing over Energizer II Data Center (BPA L0702) in Klickitat County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

BPA queue L0702, 1,000 MW, In Progress (Phase 1 scoping). Per application documents it would start at full capacity and need an external power source beyond Bonneville.

Notes on the record

This is a queue position, not an award. Savion says preliminary feasibility work is underway.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near Energizer II Data Center (BPA L0702)?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the Energizer II Data Center (BPA L0702) in Klickitat County, Washington?

Nothing on record as of October 12, 2026. No lawsuit, organized opposition, or contested hearing over Energizer II Data Center (BPA L0702) in Klickitat County, Washington appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Energizer II Data Center (BPA L0702)?

No lawsuit over Energizer II Data Center (BPA L0702) appears in the record we track as of October 12, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Energizer II Data Center (BPA L0702) use?

No water withdrawal figure for Energizer II Data Center (BPA L0702) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Energizer II Data Center (BPA L0702), and how big is it?

Savion (Shell Energy subsidiary), per BPA application documents is the operator on record. We hold 3 sites for that company across the registry. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Energizer II Data Center (BPA L0702)," updated October 12, 2026, https://suedatacenters.org/data-centers/energizer-ii-data-center-goodnoe-hills-klickitat-wa.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/energizer-ii-data-center-goodnoe-hills-klickitat-wa, retrieved October 16, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Goldendale Sentinel: More data centers possible for county (Sep 2, 2026) · The Goldendale Sentinel · retrieved October 12, 2026
  2. 2.Spokesman-Review: Energizer II described as AI data center in application documents (Oct 7, 2026) · The Spokesman-Review / Washington State Standard · retrieved October 12, 2026
  3. 3.OpenStreetMap Nominatim geocode for Goldendale Goodnoe Hills Road (approximate) · OpenStreetMap · retrieved October 12, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation