Archbald I Campus 1 Data Center (Eynon Jermyn Road)

Archbald, Lackawanna County, Pennsylvania · All 2 Archbald I sites

ProposedNo reception on recordRecord updated September 25, 2026

Archbald I Campus 1 Data Center (Eynon Jermyn Road) is a proposed data center in Archbald, Pennsylvania (Lackawanna County), operated by Archbald I LLC. The public record puts it at 408 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Archbald I LLC
Facility type
Data center
Location
Eynon Jermyn Road, Archbald, Lackawanna County, PA
Coordinates
41.5095, -75.5661 (approximate)
Power capacity
Not established from a public source
Land
408 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. October 22, 2025
    Proposed
    Zoning permit application filed with Archbald Borough for 18 data center buildings on about 408 acres beginning roughly 40 feet north of Ed Staback Regional Park, with entrances on Business Route 6 and Eynon Jermyn Road. Source: The Times-Tribune (via Yahoo News)

Opposition and litigation at this site

Nothing on record as of September 25, 2026. No lawsuit, organized opposition, or contested hearing over Archbald I Campus 1 Data Center (Eynon Jermyn Road) in Archbald, Lackawanna County, Pennsylvania appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Notes on the record

18 buildings, each up to 55 feet tall with a 150,000 sq ft footprint and a 75,000 sq ft generator yard; 720 parking spaces. Two buildings would sit within 125 feet of Ed Staback Regional Park and Archbald Pothole State Park. The company behind Archbald I LLC is not publicly identified. Distinct from the tracked Project Gravity, Wildcat Ridge and Five Up Realty / Project Boson sites in the same borough. Coordinates are the north edge of Ed Staback Regional Park, the only locational anchor given.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near Archbald I Campus 1 Data Center (Eynon Jermyn Road)?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the Archbald I Campus 1 Data Center (Eynon Jermyn Road) in Archbald?

Nothing on record as of September 25, 2026. No lawsuit, organized opposition, or contested hearing over Archbald I Campus 1 Data Center (Eynon Jermyn Road) in Archbald, Lackawanna County, Pennsylvania appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Archbald I Campus 1 Data Center (Eynon Jermyn Road)?

No lawsuit over Archbald I Campus 1 Data Center (Eynon Jermyn Road) appears in the record we track as of September 25, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Archbald I Campus 1 Data Center (Eynon Jermyn Road) use?

No water withdrawal figure for Archbald I Campus 1 Data Center (Eynon Jermyn Road) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Archbald I Campus 1 Data Center (Eynon Jermyn Road), and how big is it?

Archbald I LLC is the operator on record. We hold 2 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 408 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Archbald I Campus 1 Data Center (Eynon Jermyn Road)," updated September 25, 2026, https://suedatacenters.org/data-centers/archbald-i-campus-1-eynon-jermyn-road-lackawanna-pa.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/archbald-i-campus-1-eynon-jermyn-road-lackawanna-pa, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Developer applies for 22 more data center buildings in Archbald · The Times-Tribune (via Yahoo News) · retrieved September 25, 2026
  2. 2.Archbald I LLC: Campus 2 (project listing, covers both campuses) · Baxtel · retrieved September 25, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.