Caughbaugh Road Data Center (Pennsylvania Glacial Till site) is a proposed data center in Pennsylvania (Monroe County), operated by Pennsylvania Glacial Till LLC. The public record puts it at 520 acres. It is or has been the subject of litigation over its siting, permitting, or operation.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Pennsylvania Glacial Till LLC
- Facility type
- Data center
- Location
- Caughbaugh Road, Monroe County, PA
- Coordinates
- 41.1345, -75.6185 (approximate)
- Power capacity
- Not established from a public source
- Land
- 520 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- In litigation
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- December 16, 2025ProposedTobyhanna Township supervisors approved a data center zoning overlay covering the 520-acre Pennsylvania Glacial Till property on Caughbaugh Road off Route 115, rezoning it from rural residential. Source: Fox56 / WOLF
Opposition and litigation at this site
Yes. Caughbaugh Road Data Center (Pennsylvania Glacial Till site) in Monroe County, Pennsylvania is or has been the subject of litigation over its siting, permitting, or operation. Residents filed a validity challenge to the overlay ordinance, arguing it is illegal spot zoning permitting industrial development in a rural residential district; zoning hearing board testimony continued into April 2026.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: in litigation means the facility is or has been the subject of a lawsuit related to its siting, permitting, or operation.
Residents filed a validity challenge to the overlay ordinance, arguing it is illegal spot zoning permitting industrial development in a rural residential district; zoning hearing board testimony continued into April 2026.
Power and water
The township overlay requires a closed-loop water system and a 70-decibel noise limit with pre- and post-construction sound studies.
Notes on the record
520-acre site with active mining operations, next to the Lehigh River, surrounded by conservation land and including wetlands. Only a zoning overlay has been adopted, no land development application, capacity (MW) or tenant is public. Coordinates are a geocoded point on Caughbaugh Road, not a parcel-confirmed footprint.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
- Permanent jobs promised
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Gouldsboro Data Center Campus (Project Gold) · Clifton Township · 1778 Rich Pike LLC4 mi · Proposed · 1.5 GW · In litigation
- Project Hazelnut · Hazle Township · NorthPoint Development (NP Hazleton Holdings 1 LLC)20 mi · Proposed · In litigation
- Triboro Industrial Park / Triboro Commerce Park · Jessup / Olyphant · Ercor Triboro LLC (Sansone Group)22 mi · Permitted · In litigation
- Panther Creek HPC/AI Data Center Campus · Nesquehoning · Bitfarms Ltd.22 mi · Under construction · 350 MW
- Panther Creek Plant · Nesquehoning · Bitfarms Ltd. (Keel Infrastructure Corp.)22 mi · Operating · 350 MW
- Mudiita Ransom Township Data Center Campus · Ransom Township · Mudiita Land Venture LLC23 mi · Cancelled · 750 MW
- Breaker Street Data Center Campus · Jessup · Breaker Street Associates LLC (Catalyst Commercial Development)23 mi · Proposed · 600 MW · Contested
- Blakely Borough Data Center (withdrawn) · Blakely · Undisclosed developer (Blakely rezoning applicant)24 mi · Cancelled · Opposed
Questions people ask about this site
Is there opposition to the Caughbaugh Road Data Center (Pennsylvania Glacial Till site) in Monroe County, Pennsylvania?
Yes. Caughbaugh Road Data Center (Pennsylvania Glacial Till site) in Monroe County, Pennsylvania is or has been the subject of litigation over its siting, permitting, or operation. Residents filed a validity challenge to the overlay ordinance, arguing it is illegal spot zoning permitting industrial development in a rural residential district; zoning hearing board testimony continued into April 2026.
Has anyone filed a lawsuit over the Caughbaugh Road Data Center (Pennsylvania Glacial Till site)?
Yes. This site is recorded as being in litigation. The case, the court, and the filings we hold are listed on this page under the timeline and the sources.
How much water does Caughbaugh Road Data Center (Pennsylvania Glacial Till site) use?
No water withdrawal figure for Caughbaugh Road Data Center (Pennsylvania Glacial Till site) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Caughbaugh Road Data Center (Pennsylvania Glacial Till site), and how big is it?
Pennsylvania Glacial Till LLC is the operator on record. No capacity figure is on record for this site. The site is recorded at 520 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Caughbaugh Road Data Center (Pennsylvania Glacial Till site)," updated September 25, 2026, https://suedatacenters.org/data-centers/pennsylvania-glacial-till-caughbaugh-road-tobyhanna-monroe-pa.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/pennsylvania-glacial-till-caughbaugh-road-tobyhanna-monroe-pa, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Tobyhanna Township approves second data center zoning overlay · Fox56 / WOLF · retrieved September 25, 2026
- 2.Tobyhanna Twp. public hearing draws crowd as residents challenge zoning ordinance · Fox56 / WOLF · retrieved September 25, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us