Sue Data Centers

Data Center Registry

Powder Mills Data Center Campus

Lawrence County, Pennsylvania

ProposedIn litigationRecord updated July 26, 2026

Powder Mills Data Center Campus is a proposed data center in Pennsylvania (Lawrence County), operated by Stonebridge Associates. The public record puts it at 569 acres, a reported $15 billion investment. It is or has been the subject of litigation over its siting, permitting, or operation.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Stonebridge Associates
Facility type
Data center
Location
Lawrence County, PA
Coordinates
40.9915, -80.4272
Power capacity
Not established from a public source
Land
569 acres
Investment
$15 billion
Announced
Not established from a public source
Utility
Penn Power (FirstEnergy)
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
3,000 construction
Public subsidy
Not established from a public source
Community reception
In litigation
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. 2026
    Proposed
    Stonebridge Associates proposed a 16-building data center campus plus substation on the 569-acre former American Cyanamid 'Powder Mills' explosives site. Source: Data Center Dynamics

Opposition and litigation at this site

Yes. Powder Mills Data Center Campus in Lawrence County, Pennsylvania is or has been the subject of litigation over its siting, permitting, or operation. North Beaver and Mahoning townships amended their ordinances to impose stricter data-center regulations; Stonebridge has separate lawsuits pending against both townships disputing whether its plans were filed before those ordinance changes took effect (as of July 2026).

How the community has taken it

Reception is a sourced signal, not an editorial judgment: in litigation means the facility is or has been the subject of a lawsuit related to its siting, permitting, or operation.

North Beaver and Mahoning townships amended their ordinances to impose stricter data-center regulations; Stonebridge has separate lawsuits pending against both townships disputing whether its plans were filed before those ordinance changes took effect (as of July 2026).

Source: New Castle News (ncnewsonline.com)

Notes on the record

569-acre parcel off Route 551 (3478 Howard Drive), split between North Beaver and Mahoning Townships; 16 data-center buildings plus an electrical substation; developer cites >$15B investment and 3,000-4,000 construction/permanent jobs. Site requires environmental remediation from prior explosives manufacturing.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Powder Mills Data Center Campus in Lawrence County, Pennsylvania?

Yes. Powder Mills Data Center Campus in Lawrence County, Pennsylvania is or has been the subject of litigation over its siting, permitting, or operation. North Beaver and Mahoning townships amended their ordinances to impose stricter data-center regulations; Stonebridge has separate lawsuits pending against both townships disputing whether its plans were filed before those ordinance changes took effect (as of July 2026).

Has anyone filed a lawsuit over the Powder Mills Data Center Campus?

Yes. This site is recorded as being in litigation. The case, the court, and the filings we hold are listed on this page under the timeline and the sources.

How much water does Powder Mills Data Center Campus use?

No water withdrawal figure for Powder Mills Data Center Campus is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Powder Mills Data Center Campus, and how big is it?

Stonebridge Associates is the operator on record. No capacity figure is on record for this site. The site is recorded at 569 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Powder Mills Data Center Campus," updated July 26, 2026, https://suedatacenters.org/data-centers/stonebridge-powder-mills-lawrence-county-pa.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/stonebridge-powder-mills-lawrence-county-pa, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Data center campus proposed at former dynamite factory site in Lawrence County, Pennsylvania · Data Center Dynamics · retrieved July 17, 2026
  2. 2.Stonebridge presents data center plans, details · New Castle News (ncnewsonline.com) · retrieved July 17, 2026
  3. 3.Lawrence County parcel/GIS record (parcel 26132000) · Lawrence County GIS / Assessor · retrieved July 18, 2026
  4. 4.HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD · retrieved July 23, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us