Data Center Registry
Gouldsboro Data Center Campus (Project Gold)
Clifton Township, Lackawanna County, Pennsylvania
Gouldsboro Data Center Campus (Project Gold) is a proposed data center in Clifton Township, Pennsylvania (Lackawanna County), operated by 1778 Rich Pike LLC. The public record puts it at 1.5 GW planned. It is or has been the subject of litigation over its siting, permitting, or operation.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- 1778 Rich Pike LLC
- Facility type
- Data center
- Location
- Clifton Township, Lackawanna County, PA
- Coordinates
- 41.1950, -75.5950 (approximate)
- Power capacity
- 1.5 GW planned
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- In litigation
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- January 3, 2026ProposedZoning settlement approved by Clifton Township supervisors; developer to build five two-story data center buildings across three campuses. Source: WVIA
Opposition and litigation at this site
Yes. Gouldsboro Data Center Campus (Project Gold) in Clifton Township, Lackawanna County, Pennsylvania is or has been the subject of litigation over its siting, permitting, or operation. Clifton Township supervisors unanimously approved a zoning settlement with the developer on January 3, 2026 after the developer appealed a zoning board decision on November 26, 2025; residents said they plan to take the supervisors to court.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: in litigation means the facility is or has been the subject of a lawsuit related to its siting, permitting, or operation.
Clifton Township supervisors unanimously approved a zoning settlement with the developer on January 3, 2026 after the developer appealed a zoning board decision on November 26, 2025; residents said they plan to take the supervisors to court. An earlier settlement was rejected in September 2025.
Notes on the record
Five two-story data center buildings across three campuses in Clifton and Covington townships along Route 380, on roughly 390 acres of Clifton Road properties plus a 144-acre parcel at Routes 611 and 380. The settlement raised the permitted height from 35 to 65 feet (80 feet with rooftop equipment), requires technology reducing backup generator counts, and commits the developer to abandon nuclear and cycle gas-fired generation on the southeast campus. landAcres omitted because the source gives parcel-by-parcel acreage rather than a campus total.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Triboro Industrial Park / Triboro Commerce Park · Jessup / Olyphant · Ercor Triboro LLC (Sansone Group)18 mi · Permitted · In litigation
- Mudiita Ransom Township Data Center Campus · Ransom Township · Mudiita Land Venture LLC19 mi · Cancelled · 750 MW
- Breaker Street Data Center Campus · Jessup · Breaker Street Associates LLC (Catalyst Commercial Development)19 mi · Proposed · 600 MW · Contested
- Project Gravity · Archbald · Archbald 25 Developer LLC21 mi · Proposed · Mixed reception
- Eynon Jermyn Road Data Center Campus (former auto salvage yard) · Archbald · Five Up Realty LLC22 mi · Proposed
- Wildcat Ridge AI Data Center Campus · Archbald · Cornell Realty Management22 mi · Proposed · 1.6 GW · Contested
- Project Hazelnut · Hazle Township · NorthPoint Development (NP Hazleton Holdings 1 LLC)24 mi · Proposed · In litigation
- Panther Creek HPC/AI Data Center Campus · Nesquehoning · Bitfarms Ltd.26 mi · Under construction · 350 MW
Questions people ask about this site
Is there opposition to the Gouldsboro Data Center Campus (Project Gold) in Clifton Township?
Yes. Gouldsboro Data Center Campus (Project Gold) in Clifton Township, Lackawanna County, Pennsylvania is or has been the subject of litigation over its siting, permitting, or operation. Clifton Township supervisors unanimously approved a zoning settlement with the developer on January 3, 2026 after the developer appealed a zoning board decision on November 26, 2025; residents said they plan to take the supervisors to court.
Has anyone filed a lawsuit over the Gouldsboro Data Center Campus (Project Gold)?
Yes. This site is recorded as being in litigation. The case, the court, and the filings we hold are listed on this page under the timeline and the sources.
How much water does Gouldsboro Data Center Campus (Project Gold) use?
No water withdrawal figure for Gouldsboro Data Center Campus (Project Gold) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Gouldsboro Data Center Campus (Project Gold), and how big is it?
1778 Rich Pike LLC is the operator on record. Capacity on record is 1.5 GW.
How to cite this page
SueDataCenters.org Data Center Registry, "Gouldsboro Data Center Campus (Project Gold)," updated August 17, 2026, https://suedatacenters.org/data-centers/gouldsboro-project-gold-clifton-covington-lackawanna-pa.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/gouldsboro-project-gold-clifton-covington-lackawanna-pa, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Clifton Twp. Supervisors settle with data center developer, residents promise litigation · WVIA · retrieved August 17, 2026
- 2.Data Centers in Pennsylvania, Project List & Locations (Gouldsboro Data Center, 1778 Rich Pike LLC, Lackawanna, 1,500 MW planned) · Cleanview · retrieved August 17, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us