AgriFORCE Bitcoin Mining Facility, East Palestine
East Palestine, Columbiana County, Ohio · All 2 AgriFORCE Growing Systems sites
AgriFORCE Bitcoin Mining Facility, East Palestine is an operating crypto mining site in East Palestine, Ohio (Columbiana County), operated by AgriFORCE Growing Systems Ltd. The public record puts it at 2 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- AgriFORCE Growing Systems Ltd.
- Facility type
- Crypto mining
- Location
- East Palestine, Columbiana County, OH
- Coordinates
- 40.8326, -80.5432 (approximate)
- Power capacity
- 2 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of August 5, 2026. No lawsuit, organized opposition, or contested hearing over AgriFORCE Bitcoin Mining Facility, East Palestine in East Palestine, Columbiana County, Ohio appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Bitcoin-mining site in East Palestine (Columbiana County) operated by AgriFORCE Growing Systems (NASDAQ: AGRI), powered by natural gas from flare operations. Capacity figures are not reconciled across AgriFORCE releases: the May 2025 release cites ~2 MW / 50 PH/s for East Palestine, while a Jan 2025 acquisition release cites 5 MW for 'the Columbiana County facility' (which may aggregate both company sites); the site-specific 2 MW figure is recorded and the discrepancy flagged (hence 'reported' confidence). Coordinates approximate (East Palestine city-center).
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Big Beaver Campus · Big Beaver · Switch13 mi · Proposed · Contested
- Powder Mills Data Center Campus · Stonebridge Associates13 mi · Proposed · In litigation
- AgriFORCE Bitcoin Mining Facility, West Point · West Point · AgriFORCE Growing Systems Ltd.14 mi · Operating · 3 MW
- Big Digital Energy Midland Facility · Midland · Big Digital Energy15 mi · Operating · 120 MW
- Shippingport Industrial Park · Shippingport · Aligned Data Centers15 mi · Under construction · 2 GW · Mixed reception
- Aliquippa Data Center (former J&L Steel site) · Aliquippa · Five 9s Digital22 mi · Proposed · 496 MW
- Whitetail Creek Data Center · Niles / Weathersfield Township · Bitdeer27 mi · Proposed · Contested
- Bitfarms Sharon Facility (former Westinghouse plant) · Sharon · Bitfarms Ltd. (Keel Infrastructure Corp.)28 mi · Operating · 110 MW
Questions people ask about this site
Is there opposition to the AgriFORCE Bitcoin Mining Facility, East Palestine in East Palestine?
Nothing on record as of August 5, 2026. No lawsuit, organized opposition, or contested hearing over AgriFORCE Bitcoin Mining Facility, East Palestine in East Palestine, Columbiana County, Ohio appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the AgriFORCE Bitcoin Mining Facility, East Palestine?
No lawsuit over AgriFORCE Bitcoin Mining Facility, East Palestine appears in the record we track as of August 5, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does AgriFORCE Bitcoin Mining Facility, East Palestine use?
No water withdrawal figure for AgriFORCE Bitcoin Mining Facility, East Palestine is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates AgriFORCE Bitcoin Mining Facility, East Palestine, and how big is it?
AgriFORCE Growing Systems Ltd. is the operator on record. We hold 2 sites for that company across the registry. Capacity on record is 2 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "AgriFORCE Bitcoin Mining Facility, East Palestine," updated August 5, 2026, https://suedatacenters.org/data-centers/agriforce-east-palestine-columbiana-oh.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/agriforce-east-palestine-columbiana-oh, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.AgriFORCE (NASDAQ: AGRI) release (2025-05-14): East Palestine, Ohio site (+2 MW, 50 PH/s) plus a Westpoint, Ohio site (3 MW, 80 PH/s) · GlobeNewswire / AgriFORCE · retrieved August 5, 2026
- 2.AgriFORCE (2025-01-23): acquisition of a bitcoin-mining facility in Columbiana County, Ohio; 5 MW; powered by natural gas from flare operations; $4.5M · GlobeNewswire / AgriFORCE · retrieved August 5, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us