Misty Hollow Energy and Data Campus is a proposed data center in Prospect, Pennsylvania (Butler County), operated by Prospect RD LLC. The public record puts it at announced September 2026, 274 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Prospect RD LLC
- Facility type
- Data center
- Location
- 614 Prospect Road, Prospect, Butler County, PA, 16033
- Coordinates
- 40.8079, -80.0558 (approximate)
- Power capacity
- Not established from a public source
- Land
- 274 acres
- Investment
- Not established from a public source
- Announced
- September 2026
- Utility
- Not established from a public source
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 18, 2026ProposedPreliminary land development plan filed with Forward Township for a 1,000,000 sq ft data center, an 80,000 sq ft wastewater treatment facility, a 23,800 sq ft office building, ~10 acres of power station facilities and a security building; planning commission meeting set for 2026-09-19. Source: Butler Eagle
Opposition and litigation at this site
Nothing on record as of September 25, 2026. No lawsuit, organized opposition, or contested hearing over Misty Hollow Energy and Data Campus in Prospect, Butler County, Pennsylvania appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Developer states the data center is designed with a closed-loop cooling system intended to significantly limit water demand; a 16-inch private waterline would connect to an existing line near Prospect Road and Harmony Street Extension.
Notes on the record
Two lots totalling about 274 acres (232.4 + 41.9) at 614 Prospect Road and an adjacent parcel, with a 416,000 sq ft future expansion area. Developer targets final approvals in early 2027 and completion as early as mid-2029. Capacity (MW), investment, jobs and tenant were not disclosed. Coordinates are the geocoded street address, not a parcel-confirmed footprint.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Big Beaver Campus · Big Beaver · Switch15 mi · Proposed · Contested
- Aliquippa Data Center (former J&L Steel site) · Aliquippa · Five 9s Digital17 mi · Proposed · 496 MW
- Big Digital Energy Midland Facility · Midland · Big Digital Energy21 mi · Operating · 120 MW
- Iron Mountain WPA-1 (Boyers underground data center) · Boyers · Iron Mountain21 mi · Operating · 40 MW
- Powder Mills Data Center Campus · Stonebridge Associates23 mi · Proposed · In litigation
- Springdale Data Center (former Cheswick Generating Station) · Springdale · Allegheny DC Property Co., LLC23 mi · Permitted · 180 MW · Contested
- Stowe Township Data Center (former railcar plant) · Stowe Township · SunCap Industries23 mi · Proposed · Mixed reception
- Shippingport Industrial Park · Shippingport · Aligned Data Centers24 mi · Under construction · 2 GW · Mixed reception
Questions people ask about this site
Is there opposition to the Misty Hollow Energy and Data Campus in Prospect?
Nothing on record as of September 25, 2026. No lawsuit, organized opposition, or contested hearing over Misty Hollow Energy and Data Campus in Prospect, Butler County, Pennsylvania appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Misty Hollow Energy and Data Campus?
No lawsuit over Misty Hollow Energy and Data Campus appears in the record we track as of September 25, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Misty Hollow Energy and Data Campus use?
No water withdrawal figure for Misty Hollow Energy and Data Campus is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Misty Hollow Energy and Data Campus, and how big is it?
Prospect RD LLC is the operator on record. No capacity figure is on record for this site. The site is recorded at 274 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Misty Hollow Energy and Data Campus," updated September 25, 2026, https://suedatacenters.org/data-centers/prospect-rd-misty-hollow-forward-township-butler-pa.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/prospect-rd-misty-hollow-forward-township-butler-pa, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Massive data center proposed in Forward Township · Butler Eagle · retrieved September 25, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us