Meta Altoona Data Center Campus
Altoona, Polk County, Iowa · All 28 Meta sites · Every Meta case on our tracker
Meta Altoona Data Center Campus is an operating data center in Altoona, Iowa (Polk County), operated by Meta. The public record puts it at announced 2013, 350 MW operating, a reported $2.5 billion investment. It has documented public support and no documented opposition.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Meta
- Facility type
- Data center, AI use confirmed
- Location
- Altoona, Polk County, IA
- Coordinates
- 41.6459, -93.4696
- Power capacity
- 350 MW operating
- Land
- Not established from a public source
- Investment
- $2.5 billion
- Announced
- 2013
- Utility
- MidAmerican Energy
- Power source
- Wind
- Cooling
- Evaporative
- Water use
- Not established from a public source
- Jobs
- 400 permanent
- Public subsidy
- City of Altoona 20-year property-tax waiver (Building 5 / Siculus LLC, ~1M sq ft) - Meta instead pays ~$3/sq ft (~$3M/yr), roughly a 40% discount; IEDA High Quality Jobs program, City of Altoona, IA, 2019 | Iowa data-center sales & use tax exemption (Iowa Code sec. 423.3(95)) on equipment, cooling, and electricity - eligibility met; per-campus dollar value undisclosed, State of Iowa, 2013
- Community reception
- Supported
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- 2013OperatingMeta (Facebook) began building the Altoona campus in 2013; now its largest cloud campus at 5M+ sq ft after a seventh expansion; hosts GenAI/LLaMA compute Source: Data Center Frontier
Opposition and litigation at this site
Not that we can document. Local officials or residents have expressed public support for Meta Altoona Data Center Campus in Altoona, Polk County, Iowa, and no opposition, petition, or lawsuit appears in the sources this registry tracks as of August 14, 2026. Altoona Mayor Dean O'Connor, initially opposed, became supportive as the campus grew; Meta donated two water towers to the city and has given $4M+ locally; LEED Gold buildings.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: supported means local officials or residents have expressed public support and no opposition is documented.
Altoona Mayor Dean O'Connor, initially opposed, became supportive as the campus grew; Meta donated two water towers to the city and has given $4M+ locally; LEED Gold buildings. Resident-level concerns (water share, electricity rates, noise/light) are documented but no organized opposition or litigation was found.
Power and water
Served by MidAmerican Energy; Meta matches load with long-term Iowa wind PPAs, including the 225 MW Great Pathfinder Wind project (Boone & Hamilton Counties, Apex Clean Energy, ~2022) tied to Altoona. MidAmerican delivered ~100% renewable to its Iowa customers in 2022. No on-site generation.
Evaporative cooling with outside-air economization ~93% of the year (Meta design). Altoona utility director Daniel Scott: the campus 'can use up to a million gallons of water a day, one fifth of what the city can produce' - a permit peak/ceiling, not a measured average; a city agreement caps Meta at up to 16% of Altoona's supply. Water drawn from the Jordan Aquifer. No verified operational daily-use figure has been disclosed.
Public money on the record
| Program | Amount | Granted by | Year |
|---|---|---|---|
| City of Altoona 20-year property-tax waiver (Building 5 / Siculus LLC, ~1M sq ft) - Meta instead pays ~$3/sq ft (~$3M/yr), roughly a 40% discount; IEDA High Quality Jobs program | Not established | City of Altoona, IA | 2019 |
| Iowa data-center sales & use tax exemption (Iowa Code sec. 423.3(95)) on equipment, cooling, and electricity - eligibility met; per-campus dollar value undisclosed | Not established | State of Iowa | 2013 |
Notes on the record
Operational since 2013; 5M+ sq ft after seven expansions, Meta's largest cloud campus. Meta's engineering blog documents Altoona as a GenAI infrastructure / LLaMA training site. INVESTMENT: 'more than $2.5 billion' is a cumulative multi-year figure across all expansions (in notes, not investmentUsd). 400+ on-site operations staff is a cumulative daily figure (in notes). ~350 MW per third-party index. Coordinates are the Altoona town centroid. Meta cites a cumulative capital investment of 'more than $2.5 billion' across seven Altoona expansions since 2013 (Data Center Frontier); the 2019 Building 5 phase was ~$400M (IEDA). Both are cumulative/single-phase figures -> investmentUsd omitted.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Land area
Which document closes each gap
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Tract Altoona Technology Park · Altoona · Tractunder 1 mile · Permitted · 1 GW · Supported
- Oppidan Des Moines Data Center · Des Moines · Oppidan9 mi · Operating · 5 MW
- Edged Ankeny (Des Moines) Data Center · Ankeny · Edged Energy9 mi · Under construction · 13.2 MW
- Aureon 616 Data Center · Des Moines · Aureon9 mi · Operating
- Microsoft Project Alluvion Data Center · West Des Moines · Microsoft15 mi · Operating
- Microsoft Project Ginger East Data Center · West Des Moines · Microsoft16 mi · Under construction
- Tract Norwalk Data Center Park (Project West) · Norwalk · Tract17 mi · Proposed · Contested
- Microsoft Project Ginger West Data Center · West Des Moines · Microsoft17 mi · Under construction · Mixed reception
Questions people ask about this site
Is there opposition to the Meta Altoona Data Center Campus in Altoona?
Not that we can document. Local officials or residents have expressed public support for Meta Altoona Data Center Campus in Altoona, Polk County, Iowa, and no opposition, petition, or lawsuit appears in the sources this registry tracks as of August 14, 2026. Altoona Mayor Dean O'Connor, initially opposed, became supportive as the campus grew; Meta donated two water towers to the city and has given $4M+ locally; LEED Gold buildings.
Has anyone filed a lawsuit over the Meta Altoona Data Center Campus?
No lawsuit over Meta Altoona Data Center Campus appears in the record we track as of August 14, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Meta Altoona Data Center Campus use?
No water withdrawal figure for Meta Altoona Data Center Campus is on record here. Cooling is recorded as evaporative, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Meta Altoona Data Center Campus, and how big is it?
Meta is the operator on record. We hold 28 sites for that company across the registry. Capacity on record is 350 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Meta Altoona Data Center Campus," updated August 14, 2026, https://suedatacenters.org/data-centers/meta-altoona-ia.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/meta-altoona-ia, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Meta Adds More Data Centers in Iowa, Pushing Campus to 5 Million SF · Data Center Frontier · retrieved July 7, 2026
- 2.Building Meta's GenAI Infrastructure · Engineering at Meta · retrieved July 7, 2026
- 3.Meta signs 225MW wind PPA in Iowa · Data Center Dynamics · retrieved July 8, 2026
- 4.Facebook receives tax incentive to build fifth Altoona data center · Construction Dive · retrieved July 8, 2026
- 5.Meta Adds More Data Centers in Iowa, Pushing Campus to 5 Million SF · Data Center Frontier · retrieved July 8, 2026
- 6.How much water do Iowa data centers use · KDSM17 (CBS Iowa) · retrieved July 8, 2026
- 7.Trip to Iowa gives officials close look at Meta data center · Warren County Record · retrieved July 8, 2026
- 8.Meta Data Centers blog, Meta Announces New Expansion to Altoona Campus · retrieved July 25, 2026
- 9.Meta's Altoona Data Center (site info sheet) · Meta · retrieved August 14, 2026 · original offline, archived copy from December 5, 2025
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us