Simple Mining Osage (Mitchell County) Bitcoin Mine Proposal
Osage, Mitchell County, Iowa · All 5 Simple Mining sites
Simple Mining Osage (Mitchell County) Bitcoin Mine Proposal is a cancelled crypto mining site in Osage, Iowa (Mitchell County), operated by Simple Mining. The public record puts it at 12 MW planned. It faces documented, organized local opposition.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Cancelled
- Operator
- Simple Mining
- Facility type
- Crypto mining
- Location
- Osage, Mitchell County, IA
- Coordinates
- 43.2841, -92.8110 (approximate)
- Power capacity
- 12 MW planned
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Opposed
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- June 2025CancelledThe board rejected the reintroduced plan unanimously. The month comes from the article's image metadata. Source: KAAL
- October 29, 2024ProposedThe board tabled the proposal for a site south of the substation near Valent until the county drafts a noise ordinance. Source: KIMT
Opposition and litigation at this site
Yes. Organized local opposition to Simple Mining Osage (Mitchell County) Bitcoin Mine Proposal in Osage, Mitchell County, Iowa is documented in the public record, without a lawsuit on file in the sources we track. Nearly 330 signatures opposed the project.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.
Nearly 330 signatures opposed the project. The Mitchell County Board of Adjustment rejected the revised plan unanimously.
Notes on the record
About 12 MW proposed near Osage. The rejection article is undated; June 2025 comes from its image upload path.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- South Front Networks IA-Emery · Mason City · South Front Networks26 mi · Operating
Questions people ask about this site
Is there opposition to the Simple Mining Osage (Mitchell County) Bitcoin Mine Proposal in Osage?
Yes. Organized local opposition to Simple Mining Osage (Mitchell County) Bitcoin Mine Proposal in Osage, Mitchell County, Iowa is documented in the public record, without a lawsuit on file in the sources we track. Nearly 330 signatures opposed the project.
Has anyone filed a lawsuit over the Simple Mining Osage (Mitchell County) Bitcoin Mine Proposal?
No lawsuit over Simple Mining Osage (Mitchell County) Bitcoin Mine Proposal appears in the record we track as of October 28, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Simple Mining Osage (Mitchell County) Bitcoin Mine Proposal use?
No water withdrawal figure for Simple Mining Osage (Mitchell County) Bitcoin Mine Proposal is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Simple Mining Osage (Mitchell County) Bitcoin Mine Proposal, and how big is it?
Simple Mining is the operator on record. We hold 5 sites for that company across the registry. Capacity on record is 12 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Simple Mining Osage (Mitchell County) Bitcoin Mine Proposal," updated October 28, 2026, https://suedatacenters.org/data-centers/simple-mining-osage-mitchell-ia.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/simple-mining-osage-mitchell-ia, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Board tables talks of bitcoin mining facility · KIMT · retrieved October 28, 2026
- 2.Proposed Bitcoin mining facility in Osage has community revisiting concerns · KAAL · retrieved October 28, 2026
- 3.Mitchell County Board of Adjustment rejects plan for proposed Bitcoin mine · KAAL · retrieved October 28, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us