Edged Ankeny (Des Moines) Data Center is a data center under construction in Ankeny, Iowa (Polk County), operated by Edged Energy. The public record puts it at announced May 6, 2025, 13.2 MW planned, 17.5 acres, a reported $187 million investment.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Under construction
- Operator
- Edged Energy
- Facility type
- Data center
- Location
- 2701 SE 90th Street, Ankeny, Polk County, IA
- Coordinates
- 41.7297, -93.6058 (approximate)
- Power capacity
- 13.2 MW planned
- Land
- 17.5 acres
- Investment
- $187 million
- Announced
- May 6, 2025
- Utility
- Not established from a public source
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- 22 permanent
- Public subsidy
- Tax increment financing (five-year sliding scale), $2 million, City of Ankeny, 2025
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Opposition and litigation at this site
Nothing on record as of September 16, 2026. No lawsuit, organized opposition, or contested hearing over Edged Ankeny (Des Moines) Data Center in Ankeny, Polk County, Iowa appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Closed-loop, air-based ThermalWorks waterless cooling; Edged projects it will save more than 52 million gallons of water annually versus a similar-sized conventional data center. Supports up to 70 kW/rack air-cooled, 200 kW/rack with plug-and-play liquid integration.
Public money on the record
| Program | Amount | Granted by | Year |
|---|---|---|---|
| Tax increment financing (five-year sliding scale) | $2 million | City of Ankeny | 2025 |
Notes on the record
AI-focused colocation developer (not a Big-5 hyperscaler) building a waterless-cooled, high-density facility at 9100 SE Four Mile Drive, Ankeny (address confirmed via secondary aggregators; coordinates are city-level, not parcel-geocoded, so the pin is approximate). Design PUE 1.15 portfolio-wide; ThermalWorks closed-loop cooling claims >52M gal/yr water savings vs conventional. Business Record reported a $187M investment and a 105,000 sq ft building when the Ankeny City Council approved the development agreement in March 2025; third-party trade press (Site Selection Magazine, seen only in search results) cited the same two figures. A 2024 DCD article (which could not be retrieved as of August 2026, so not used as a source) described a much larger 'I-80 Commerce Center' two-building proposal (~535K + ~775K sq ft) at what looks like the same general site/intersection under 'Commerce Center LLC', possibly an earlier or future-phase master plan for the same park. This could not be verified as of August 2026, so only the confirmed Edged 13.2MW project is covered. News headlines referenced the building having since 'topped out'; as of August 2026, whether the 13.2MW figure had grown was unconfirmed.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- How the community has received it
- Which utility serves it
Which document closes each gap
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Cologix DSM3 Altoona · Altoona · Cologix7 mi · Proposed
- Meta Altoona Data Center Campus · Altoona · Meta9 mi · Operating · Supported
- Tract Altoona Technology Park · Altoona · Tract9 mi · Permitted · 1 GW · Supported
- Aureon 616 Data Center · Des Moines · Aureon10 mi · Operating
- Oppidan Des Moines Data Center · Des Moines · Oppidan10 mi · Operating · 5 MW
- Microsoft Project Ginger West Data Center · West Des Moines · Microsoft15 mi · Under construction · Mixed reception
- Microsoft Project Alluvion Data Center · West Des Moines · Microsoft16 mi · Operating
- Microsoft Project Ginger East Data Center · West Des Moines · Microsoft16 mi · Under construction
Questions people ask about this site
Is there opposition to the Edged Ankeny (Des Moines) Data Center in Ankeny?
Nothing on record as of September 16, 2026. No lawsuit, organized opposition, or contested hearing over Edged Ankeny (Des Moines) Data Center in Ankeny, Polk County, Iowa appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Edged Ankeny (Des Moines) Data Center?
No lawsuit over Edged Ankeny (Des Moines) Data Center appears in the record we track as of September 16, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Edged Ankeny (Des Moines) Data Center use?
No water withdrawal figure for Edged Ankeny (Des Moines) Data Center is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Edged Ankeny (Des Moines) Data Center, and how big is it?
Edged Energy is the operator on record. We hold 6 sites for that company across the registry. Capacity on record is 13.2 MW. The site is recorded at 17.5 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Edged Ankeny (Des Moines) Data Center," updated September 16, 2026, https://suedatacenters.org/data-centers/edged-energy-ankeny-ia.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/edged-energy-ankeny-ia, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Edged Breaks Ground on Data Center in Des Moines, Iowa Optimized for Next-Generation AI Training and Inference · Edged Energy · retrieved August 21, 2026
- 2.Ankeny council approves data center development agreement · Business Record · retrieved September 16, 2026
- 3.Growth of data centers in Iowa · Business Record · retrieved September 16, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us