Los Alamos National Laboratory Strategic Computing Complex (Nicholas C. Metropolis Center)

Los Alamos, Los Alamos County, New Mexico

OperatingNo reception on recordAI mixed useRecord updated October 17, 2026

Los Alamos National Laboratory Strategic Computing Complex (Nicholas C. Metropolis Center) is an operating data center in Los Alamos, New Mexico (Los Alamos County), operated by Los Alamos National Laboratory (U.S. Department of Energy / NNSA).

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Los Alamos National Laboratory (U.S. Department of Energy / NNSA)
Facility type
Data center, AI use mixed
Location
Los Alamos, Los Alamos County, NM
Coordinates
35.8755, -106.3190 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Evaporative
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Nothing on record as of October 17, 2026. No lawsuit, organized opposition, or contested hearing over Los Alamos National Laboratory Strategic Computing Complex (Nicholas C. Metropolis Center) in Los Alamos, Los Alamos County, New Mexico appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

The engineer of record lists 100% evaporative cooling and a shift to warm-water direct cooling. The cooling plant uses treated water from LANL's sanitary effluent reclamation facility as makeup water.

Notes on the record

A 307,749 sq ft secured supercomputing facility (Nicholas C. Metropolis Center) built around 1999-2001 for $131 million. Computer-floor power was expanded to 24 MW, with the ability to add 10 MW more, per the MEP engineer. It has housed Q, Roadrunner, Trinity, Crossroads and Venado. Venado (2,560 liquid-cooled Nvidia Grace Hopper superchips) was announced at 10 exaflops of peak AI performance, a figure LANL has not confirmed, which supports the mixed-use classification. Coordinates are an approximate point at LANL Technical Area 3, not a confirmed building pin.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Tell us about your situation

Living near Los Alamos National Laboratory Strategic Computing Complex (Nicholas C. Metropolis Center)?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the Los Alamos National Laboratory Strategic Computing Complex (Nicholas C. Metropolis Center) data center in Los Alamos?

Nothing on record as of October 17, 2026. No lawsuit, organized opposition, or contested hearing over Los Alamos National Laboratory Strategic Computing Complex (Nicholas C. Metropolis Center) in Los Alamos, Los Alamos County, New Mexico appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Los Alamos National Laboratory Strategic Computing Complex (Nicholas C. Metropolis Center) data center?

No lawsuit over Los Alamos National Laboratory Strategic Computing Complex (Nicholas C. Metropolis Center) appears in the record we track as of October 17, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Los Alamos National Laboratory Strategic Computing Complex (Nicholas C. Metropolis Center) use?

No water withdrawal figure for Los Alamos National Laboratory Strategic Computing Complex (Nicholas C. Metropolis Center) is on record here. Cooling is recorded as evaporative, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Los Alamos National Laboratory Strategic Computing Complex (Nicholas C. Metropolis Center), and how big is it?

Los Alamos National Laboratory (U.S. Department of Energy / NNSA) is the operator on record. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Los Alamos National Laboratory Strategic Computing Complex (Nicholas C. Metropolis Center)," updated October 17, 2026, https://suedatacenters.org/data-centers/lanl-strategic-computing-complex-los-alamos-nm.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/lanl-strategic-computing-complex-los-alamos-nm, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Los Alamos National Laboratory Strategic Computing Complex · Bridgers & Paxton Consulting Engineers · retrieved October 17, 2026
  2. 2.Los Alamos National Laboratory unveils new Venado supercomputer reportedly capable of 10 exaflops of peak AI performance · SDxCentral · retrieved October 17, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us