New Albany North Campus
New Albany, Licking County, Ohio · All 27 EdgeConneX sites · Every EdgeConneX case on our tracker
New Albany North Campus is a proposed data center in New Albany, Ohio (Licking County), operated by EdgeConneX. The public record puts it at 170.29 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- EdgeConneX
- Facility type
- Data center
- Location
- 3356 Clover Valley Rd NW, New Albany, Licking County, OH
- Coordinates
- 40.1028, -82.7160 (approximate)
- Power capacity
- Not established from a public source
- Land
- 170.29 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- July 24, 2026ProposedPowerConneX filed the OPSB application (case 26-361-EL-BGN) for the 430 MW New Albany 3 Energy Center, which will serve as primary power for a data center on the same site; OPSB public hearing set for 2026-10-22. Source: EdgeConneX
Opposition and litigation at this site
Nothing on record as of October 15, 2026. No lawsuit, organized opposition, or contested hearing over New Albany North Campus in New Albany, Licking County, Ohio appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
EdgeConneX's second New Albany campus, on the 170.29-acre parcel owned by EdgeConneX MCN New Albany North PropCo 1 LLC (3356 Clover Valley Rd NW; bought for ~$62M in March 2025 per the Columbus Dispatch), north of Rt. 161 between Mink Street and Clover Valley Road, in the Johnstown-Monroe school district. Per OPSB filings as reported by The Reporting Project: about 1.3 million sq ft of data center space in four data halls, plus a substation and energy center; 5.86 acres of isolated wetland and 65 acres of trees would be removed. The co-located PowerConneX New Albany 3 Energy Center (up to ~430 MW of gas generation on ~30 acres; Reporting Project says 450 MW) is on-site generation, not IT load, so it is excluded from the capacity figure. As of October 2026, no data-center IT MW figure was found, so no capacity is recorded. The operator page targets commercial operation of the energy center as early as Q4 2027. Coordinates are the Licking County Auditor parcel centroid (approximate; the parcel is 170 ac). The Census geocoder matched the street address by road-segment interpolation at 40.103464, -82.723486, about 0.6 km west on the road frontage; the parcel centroid was used instead. The 'North Campus' name comes from the EdgeConneX project page URL and title. Distinct from EdgeConneX MCN New Albany (South campus: 9850 Innovation Campus Way, 80 MW Phase I warehouse conversion plus 2x72 MW Phase II, held by the South PropCo 2 / South Opco entities).
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- CyrusOne New Albany COL-1 · Johnstown · CyrusOneunder 1 mile · Under construction
- AWS New Albany (Newton Court) · New Albany · Amazon Web Servicesunder 1 mile · Operating
- EdgeConneX MCN New Albany (South Campus) · New Albany · EdgeConneX1 mi · Under construction · 224 MW
- QTS New Albany IV · New Albany · QTS Data Centers2 mi · Permitted
- Vantage Data Centers OH1 · Johnstown · Vantage Data Centers2 mi · Under construction · 192 MW · Supported
- AWS New Albany (3180 Beech Road) · New Albany · Amazon Web Services2 mi · Operating
- AWS New Albany (2550 Beech Road) · New Albany · Amazon Web Services2 mi · Operating
- Karis Critical Smart Farms Data Center Campus (New Albany) · New Albany · Karis Critical (owner of record Karis Critical CMH Smart LLC)2 mi · Proposed
Questions people ask about this site
Is there opposition to the New Albany North Campus in New Albany?
Nothing on record as of October 15, 2026. No lawsuit, organized opposition, or contested hearing over New Albany North Campus in New Albany, Licking County, Ohio appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the New Albany North Campus?
No lawsuit over New Albany North Campus appears in the record we track as of October 15, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does New Albany North Campus use?
No water withdrawal figure for New Albany North Campus is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates New Albany North Campus, and how big is it?
EdgeConneX is the operator on record. We hold 27 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 170.29 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "New Albany North Campus," updated October 15, 2026, https://suedatacenters.org/data-centers/edgeconnex-new-albany-north-campus-oh.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/edgeconnex-new-albany-north-campus-oh, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.New Albany North Campus Energy Center (PowerConneX New Albany 3 Energy Center project page) · EdgeConneX · retrieved October 15, 2026
- 2.Public hearing on another gas-fired power plant for a data center set for Oct. 22 in New Albany · The Reporting Project (Denison University) · retrieved October 15, 2026
- 3.Licking County Auditor parcel 095-111720-00.000: EDGECONNEX MCN NEW ALBANY NORTH PROPCO 1 LLC, 3356 Clover Valley Rd NW, 170.29 ac, Industrial, TIF · Licking County Auditor · retrieved October 15, 2026
- 4.New Albany looks to annex, rezone 106 acres for business park expansion (Columbus Dispatch) · The Columbus Dispatch (via Yahoo News) · retrieved October 15, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.