AWS New Albany (2550 Beech Road) is an operating data center in New Albany, Ohio (Licking County), operated by Amazon Web Services. The public record puts it at 67.3 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Amazon Web Services
- Facility type
- Data center
- Location
- New Albany, Licking County, OH
- Coordinates
- 40.0944, -82.7501 (approximate)
- Power capacity
- Not established from a public source
- Land
- 67.3 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- 2017OperatingOperational since ~2017 per data-center aggregators (Baxtel, which lists the building as 'Park Two', ~459,000 sq ft). The parcel is owned by Vadata Inc, Amazon's data-center subsidiary, and carries the auditor's built industrial land-use class (305), not vacant (300). Source: Baxtel
Opposition and litigation at this site
Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over AWS New Albany (2550 Beech Road) in New Albany, Licking County, Ohio appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Operational AWS data center campus on a parcel of about 67 acres (Licking County Auditor: 67.27 tax acres, 66.5 GIS acres) owned by Vadata Inc at 2550 Beech Rd NW, part of Amazon's original New Albany (AWS US-East-2) footprint, predating and physically distinct from the ~458-acre Beech/Miller five-building expansion (under construction, ~2.4 km north), which as of July 2026 is tracked separately as AWS New Albany (Beech/Miller Road Campus). Licking County Auditor land-use class 305 ('Research/Chemical Labs' = built industrial, vs class 300 'Industrial Vacant Land' on the neighboring expansion parcels); owner Vadata Inc (Amazon's data-center subsidiary). Data-center aggregators list the building as '2570 Beech Road' / 'Park Two' (a prior Compute Atlas note called it 'Ridge Two'), ~459,000 sq ft, operational since ~2017, the building code-name and year rest on aggregator data, not a primary filing. As of October 2026, OpenStreetMap maps five AWS data-center buildings (CMH50, CMH53, CMH56, CMH59 and CMH62) inside this parcel; the ~459,000 sq ft aggregator figure describes a single building, so it is not the parcel total. No site-specific IT-load MW is disclosed. Coordinates are the Licking County Auditor parcel centroid. Distinct from tracked AWS Cosgray Road Campus and AWS Scioto Darby Campus (Hilliard, Franklin County).
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Vantage Data Centers OH1 · Johnstown · Vantage Data Centersunder 1 mile · Under construction · 192 MW · Supported
- AWS New Albany (3180 Beech Road) · New Albany · Amazon Web Servicesunder 1 mile · Operating
- Microsoft New Albany Data Center (Beech Road) · New Albany · Microsoftunder 1 mile · Under construction
- AWS New Albany (Newton Court) · New Albany · Amazon Web Services1 mi · Operating
- QTS New Albany IV · New Albany · QTS Data Centers1 mi · Permitted
- EdgeConneX MCN New Albany (South Campus) · New Albany · EdgeConneX1 mi · Under construction · 224 MW
- AWS New Albany (Beech/Miller Road Campus) · New Albany · Amazon Web Services2 mi · Under construction
- CyrusOne New Albany COL-1 · Johnstown · CyrusOne2 mi · Under construction
Questions people ask about this site
Is there opposition to the AWS New Albany (2550 Beech Road) data center in New Albany?
Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over AWS New Albany (2550 Beech Road) in New Albany, Licking County, Ohio appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the AWS New Albany (2550 Beech Road) data center?
No lawsuit over AWS New Albany (2550 Beech Road) appears in the record we track as of October 28, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does AWS New Albany (2550 Beech Road) use?
No water withdrawal figure for AWS New Albany (2550 Beech Road) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates AWS New Albany (2550 Beech Road), and how big is it?
Amazon Web Services is the operator on record. We hold 62 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 67.3 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "AWS New Albany (2550 Beech Road)," updated October 28, 2026, https://suedatacenters.org/data-centers/aws-2550-beech-road-new-albany-oh.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/aws-2550-beech-road-new-albany-oh, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Licking County parcel/GIS record (parcel 095-111744-00.000, 2550 Beech Rd NW, Vadata Inc, Industrial land-use class 305 'Research/Chemical Labs' = built, 67.27 tax acres) · Licking County Auditor GIS / Assessor · retrieved July 18, 2026
- 2.Amazon Investment in New Albany Contributes $1.4 Billion to Licking County GDP · City of New Albany · retrieved July 18, 2026
- 3.Amazon: 2570 Beech Road Data Center ('Park Two', ~459,000 sq ft, operational since 2017) · Baxtel · retrieved July 18, 2026
- 4.OpenStreetMap ways for the AWS buildings CMH50, CMH53, CMH56, CMH59 and CMH62 (tagged as data centers operated by Amazon Web Services) · OpenStreetMap · retrieved October 28, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.