Data Center Registry
Blockchain Power Corp. Hazelton Bitcoin Mining Site
Hazelton, Preston County, West Virginia · All 5 Blockchain Power sites
Blockchain Power Corp. Hazelton Bitcoin Mining Site is an operating crypto mining site in Hazelton, West Virginia (Preston County), operated by Blockchain Power Corp. The public record puts it at announced December 28, 2025, 107 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Blockchain Power Corp.
- Facility type
- Crypto mining
- Location
- Hazelton, Preston County, WV
- Coordinates
- 39.6537, -79.5306 (approximate)
- Power capacity
- 107 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- December 28, 2025
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- December 28, 2025OperatingNamed as one of five Blockchain Power Corp. bitcoin mines sited on abandoned coal properties in West Virginia. Source: Salon
Opposition and litigation at this site
Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over Blockchain Power Corp. Hazelton Bitcoin Mining Site in Hazelton, Preston County, West Virginia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
One of five Blockchain Power Corp. bitcoin-mining data centers on abandoned coal sites in West Virginia (Hazelton, Ben's Run, Tunnelton, Miracle Run, Blacksville). Salon quotes local reporting: "dropping five bitcoin mines into abandoned coal sites at Hazelton, Ben's Run, Tunnelton, Miracle Run and Blacksville." The operator's own site says the five sites are "constructed and energized" and provide a combined 107 MW, that figure is COMPANY-WIDE and is deliberately not attributed to this site, so capacityMw is left unset. Coordinates are the Hazelton community centroid, not a surveyed footprint. Blockchain Power Corp. is headquartered at 255 Northpointe Drive, Bruceton Mills, WV.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Blockchain Power Corp. Tunnelton Bitcoin Mining Site · Tunnelton · Blockchain Power Corp.22 mi · Operating
- Project Hummingbird Data Center Campus (former Robena Mine) · Greensboro · International Electric Power23 mi · Proposed · Mixed reception
- NETL Computational Science and Engineering Center · Morgantown · National Energy Technology Laboratory (U.S. Department of Energy)24 mi · Under construction
Questions people ask about this site
Is there opposition to the Blockchain Power Corp. Hazelton Bitcoin Mining Site data center in Hazelton?
Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over Blockchain Power Corp. Hazelton Bitcoin Mining Site in Hazelton, Preston County, West Virginia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Blockchain Power Corp. Hazelton Bitcoin Mining Site data center?
No lawsuit over Blockchain Power Corp. Hazelton Bitcoin Mining Site appears in the record we track as of September 21, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Blockchain Power Corp. Hazelton Bitcoin Mining Site use?
No water withdrawal figure for Blockchain Power Corp. Hazelton Bitcoin Mining Site is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Blockchain Power Corp. Hazelton Bitcoin Mining Site, and how big is it?
Blockchain Power Corp. is the operator on record. We hold 5 sites for that company across the registry. Capacity on record is 107 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Blockchain Power Corp. Hazelton Bitcoin Mining Site," updated September 21, 2026, https://suedatacenters.org/data-centers/blockchain-power-hazelton-preston-county-wv.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/blockchain-power-hazelton-preston-county-wv, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Data centers are West Virginia's new strip mines, names the five Blockchain Power sites · Salon · retrieved September 21, 2026
- 2.Blockchain Power Corp., company site: five WV data processing sites "constructed and energized", 107 MW combined · Blockchain Power Corp. · retrieved September 15, 2026
- 3.OpenStreetMap Nominatim geocode, Hazelton, Preston County, WV · OpenStreetMap · retrieved September 15, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us