Data Center Registry
Project Hummingbird Data Center Campus (former Robena Mine)
Greensboro, Greene County, Pennsylvania
Project Hummingbird Data Center Campus (former Robena Mine) is a proposed data center in Greensboro, Pennsylvania (Greene County), operated by International Electric Power. The public record puts it at 1,400 acres. It has documented support and documented opposition on record.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- International Electric Power
- Facility type
- Data center
- Location
- Greensboro, Greene County, PA
- Coordinates
- 39.7900, -79.9200 (approximate)
- Power capacity
- Not established from a public source
- Land
- 1,400 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Project Hummingbird behind-the-meter natural gas generation
- Power source
- On site gas
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Mixed reception
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 25, 2026ProposedGreene County Planning Commission approved the first phase of site reclamation work in December; earthwork is underway at the former Robena Mine site. The compute campus itself has no land development approval yet and could go online as early as 2029. Source: Observer-Reporter
Opposition and litigation at this site
Partly. Both documented support and documented opposition to Project Hummingbird Data Center Campus (former Robena Mine) in Greensboro, Greene County, Pennsylvania appear in the record, with no clear majority position. Monongahela Township residents are asking for later meeting times, more frequent committee meetings and meaningful input into community-benefits-agreement terms, road and school funding, and ongoing air and water testing.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: mixed reception means documented support and documented opposition both exist with no clear majority position on record.
Monongahela Township residents are asking for later meeting times, more frequent committee meetings and meaningful input into community-benefits-agreement terms, road and school funding, and ongoing air and water testing.
Power and water
Powered behind the meter by two on-site natural gas turbines generating a combined 910 MW, with an existing grid connection as backup.
Essential Utilities plans a facility to treat 18 million gallons a day drawn from the Monongahela River, serving both the power generation facilities and the data center cooling systems; no data-center-only withdrawal figure is published.
Notes on the record
The compute campus at the 1,400-acre former Robena Mine site, distinct from the tracked Project Hummingbird power plant record. IEP has been in discussions with hyperscale customers; no tenant is named. Coordinates match the sibling power-plant record for the same site and are approximate.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- NETL Computational Science and Engineering Center · Morgantown · National Energy Technology Laboratory (U.S. Department of Energy)9 mi · Under construction
- Blockchain Power Corp. Blacksville Bitcoin Mining Site · Blacksville · Blockchain Power Corp.13 mi · Operating
- Blockchain Power Corp. Miracle Run Bitcoin Mining Site · Miracle Run · Blockchain Power Corp.20 mi · Operating
- Grant Town Power Plant Cryptocurrency Mining Containers · Grant Town · Undisclosed operator (Grant Town Power Plant site; plant operated by American Bituminous Power Partners for owner Horizon Ventures)20 mi · Operating
- Blockchain Power Corp. Hazelton Bitcoin Mining Site · Hazelton · Blockchain Power Corp.23 mi · Operating · 107 MW
- NOAA Environmental Security Computing Center (NESCC) · Fairmont · National Oceanic and Atmospheric Administration24 mi · Operating
- Blockchain Power Corp. Tunnelton Bitcoin Mining Site · Tunnelton · Blockchain Power Corp.29 mi · Operating
- Zediker Station Data Center Site · South Strabane Township · CNX Resources29 mi · Proposed · Supported
Questions people ask about this site
Is there opposition to the Project Hummingbird Data Center Campus (former Robena Mine) in Greensboro?
Partly. Both documented support and documented opposition to Project Hummingbird Data Center Campus (former Robena Mine) in Greensboro, Greene County, Pennsylvania appear in the record, with no clear majority position. Monongahela Township residents are asking for later meeting times, more frequent committee meetings and meaningful input into community-benefits-agreement terms, road and school funding, and ongoing air and water testing.
Has anyone filed a lawsuit over the Project Hummingbird Data Center Campus (former Robena Mine)?
No lawsuit over Project Hummingbird Data Center Campus (former Robena Mine) appears in the record we track as of September 25, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Project Hummingbird Data Center Campus (former Robena Mine) use?
No water withdrawal figure for Project Hummingbird Data Center Campus (former Robena Mine) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Project Hummingbird Data Center Campus (former Robena Mine), and how big is it?
International Electric Power is the operator on record. No capacity figure is on record for this site. The site is recorded at 1400 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Project Hummingbird Data Center Campus (former Robena Mine)," updated September 25, 2026, https://suedatacenters.org/data-centers/iep-hummingbird-data-center-campus-greene-county-pa.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/iep-hummingbird-data-center-campus-greene-county-pa, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Monongahela Township residents seek more chances for input on data center project · Observer-Reporter · retrieved September 25, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us