Blockchain Power Corp. Blacksville Bitcoin Mining Site
Blacksville, Monongalia County, West Virginia
Blockchain Power Corp. Blacksville Bitcoin Mining Site is an operating crypto mining site in Blacksville, West Virginia (Monongalia County), operated by Blockchain Power Corp.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Blockchain Power Corp.
- Facility type
- Crypto mining
- Location
- Blacksville, Monongalia County, WV
- Coordinates
- 39.7048, -80.1364 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- 45 permanent
- Public subsidy
- WV High-Technology Business Property Valuation Act (WV Code 11-6J-3), $494,461.08, Monongalia County, 2026
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Opposition and litigation at this site
Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Blockchain Power Corp. Blacksville Bitcoin Mining Site in Blacksville, Monongalia County, West Virginia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Site uses hydrocooling that 'recycles approximately 200,000 gallons of water pulled from the Monongahela River' per the Dominion Post (2026-03-11); classified closed_loop under this dataset's rule that a recirculating water circuit governs regardless of marketing language, since the source describes the water as recycled/recirculated rather than single-pass.
Public money on the record
| Program | Amount | Granted by | Year |
|---|---|---|---|
| WV High-Technology Business Property Valuation Act (WV Code 11-6J-3) | $494,461.08 | Monongalia County | 2026 |
Notes on the record
Sited at the former Blacksville No. 2 coal mine (closure in 2021 cost 180 jobs, per the Dominion Post). One of five West Virginia Bitcoin-mining sites Blockchain Power Corp. has energized in its first two years (others at Hazelton, Ben's Run, Tunnelton, and Miracle Run in Preston/Tyler/Monongalia counties, not individually recorded here); the five sites combine for 107MW, individually 'driven by 10 megawatts to 100 megawatts of reliable power' per the Dominion Post, with Blacksville the newest and only hydrocooled site (the other four use air-cooling per WBOY). The Dominion Post's cited filing address (1251 Earl L Core Rd, Morgantown, WV 26505) reads as an administrative/mailing address rather than the mine-site parcel itself, so it was NOT used for this record's coordinates; coordinates instead approximate the Blacksville, Monongalia County community near the former mine. Monongalia County Commission approved the property-tax exoneration March 11, 2026 over the objection of Commission President Tom Bloom, who questioned fairness to local taxpayers under the special valuation (assessed at 5% of acquisition cost vs. the standard 60%). Company-wide (not site-specific) target is 200MW combined capacity by end of 2026 (blockchain-power.com, not separately cited here as a distinct fetch beyond company background).
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Hog Lick Aggregates Data Center / Microgrid Proposal · White Hall · Hog Lick Aggregates20 mi · Proposed
Questions people ask about this site
Is there opposition to the Blockchain Power Corp. Blacksville Bitcoin Mining Site data center in Blacksville?
Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over Blockchain Power Corp. Blacksville Bitcoin Mining Site in Blacksville, Monongalia County, West Virginia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Blockchain Power Corp. Blacksville Bitcoin Mining Site data center?
No lawsuit over Blockchain Power Corp. Blacksville Bitcoin Mining Site appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Blockchain Power Corp. Blacksville Bitcoin Mining Site use?
No water withdrawal figure for Blockchain Power Corp. Blacksville Bitcoin Mining Site is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Blockchain Power Corp. Blacksville Bitcoin Mining Site, and how big is it?
Blockchain Power Corp. is the operator on record. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Blockchain Power Corp. Blacksville Bitcoin Mining Site," updated September 10, 2026, https://suedatacenters.org/data-centers/blockchain-power-blacksville-monongalia-county-wv.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/blockchain-power-blacksville-monongalia-county-wv, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Commission approves sizable tax exoneration for Bitcoin mining site · The Dominion Post · retrieved September 10, 2026
- 2.Bitcoin mining data centers set up shop in abandoned West Virginia coal mines · WBOY · retrieved September 10, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us