NOAA Environmental Security Computing Center (NESCC)
Fairmont, Marion County, West Virginia
NOAA Environmental Security Computing Center (NESCC) is an operating data center in Fairmont, West Virginia (Marion County), operated by National Oceanic and Atmospheric Administration.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- National Oceanic and Atmospheric Administration
- Facility type
- Data center
- Location
- Fairmont, Marion County, WV
- Coordinates
- 39.4849, -80.1427 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of September 22, 2026. No lawsuit, organized opposition, or contested hearing over NOAA Environmental Security Computing Center (NESCC) in Fairmont, Marion County, West Virginia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Federal research-computing center in the I-79 High Technology Park, Marion County. Home of NOAA's Hera HPC system; a $100M NOAA HPC system named Rhea is planned for the site to support AI/ML weather, ocean and climate modeling. NOAA's own fact sheet (noaa.gov) returned HTTP 403 this session, so the 54,000 sq ft and $27.6M-establishment figures reported elsewhere were NOT adopted. Pin is the city centroid, the exact park parcel is not published in the cited source.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Hog Lick Aggregates Data Center / Microgrid Proposal · White Hall · Hog Lick Aggregates5 mi · Proposed
- Grant Town Power Plant Cryptocurrency Mining Containers · Grant Town · Undisclosed operator (Grant Town Power Plant site; plant operated by American Bituminous Power Partners for owner Horizon Ventures)5 mi · Operating
- Blockchain Power Corp. Miracle Run Bitcoin Mining Site · Miracle Run · Blockchain Power Corp.15 mi · Operating
- Blockchain Power Corp. Blacksville Bitcoin Mining Site · Blacksville · Blockchain Power Corp.15 mi · Operating
- NETL Computational Science and Engineering Center · Morgantown · National Energy Technology Laboratory (U.S. Department of Energy)15 mi · Under construction
- Citynet Bridgeport Data Center · Bridgeport · Citynet, LLC16 mi · Operating
- Blockchain Power Corp. Tunnelton Bitcoin Mining Site · Tunnelton · Blockchain Power Corp.22 mi · Operating
- Project Hummingbird Data Center Campus (former Robena Mine) · Greensboro · International Electric Power24 mi · Proposed · Mixed reception
Questions people ask about this site
Is there opposition to the NOAA Environmental Security Computing Center (NESCC) data center in Fairmont?
Nothing on record as of September 22, 2026. No lawsuit, organized opposition, or contested hearing over NOAA Environmental Security Computing Center (NESCC) in Fairmont, Marion County, West Virginia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the NOAA Environmental Security Computing Center (NESCC) data center?
No lawsuit over NOAA Environmental Security Computing Center (NESCC) appears in the record we track as of September 22, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does NOAA Environmental Security Computing Center (NESCC) use?
No water withdrawal figure for NOAA Environmental Security Computing Center (NESCC) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates NOAA Environmental Security Computing Center (NESCC), and how big is it?
National Oceanic and Atmospheric Administration is the operator on record. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "NOAA Environmental Security Computing Center (NESCC)," updated September 22, 2026, https://suedatacenters.org/data-centers/noaa-environmental-security-computing-center-fairmont-wv.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/noaa-environmental-security-computing-center-fairmont-wv, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.NOAA's $100M Rhea supercomputer coming to Fairmont, boosting West Virginia tech growth · West Virginia Press Association · retrieved September 22, 2026
- 2.OpenStreetMap Nominatim geocode for Fairmont, Marion County, WV · OpenStreetMap · retrieved September 22, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us