Grant Town Power Plant Cryptocurrency Mining Containers

Grant Town, Marion County, West Virginia

OperatingNo reception on recordRecord updated September 15, 2026

Grant Town Power Plant Cryptocurrency Mining Containers is an operating crypto mining site in Grant Town, West Virginia (Marion County), operated by Undisclosed operator (Grant Town Power Plant site; plant operated by American Bituminous Power Partners for owner Horizon Ventures). The public record puts it at announced April 16, 2026. The record for this site rests on a single unverified source and should be read that way.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Undisclosed operator (Grant Town Power Plant site; plant operated by American Bituminous Power Partners for owner Horizon Ventures)
Facility type
Crypto mining
Location
Grant Town, Marion County, WV
Coordinates
39.5603, -80.1629 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
April 16, 2026
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Rumored: a single unverified source

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. April 16, 2026
    Operating
    Times West Virginian identified two apparent mining containers on the plant premises via satellite and reverse-image search; no company confirmed the operation. Source: Times West Virginian

Opposition and litigation at this site

Nothing on record as of September 15, 2026. No lawsuit, organized opposition, or contested hearing over Grant Town Power Plant Cryptocurrency Mining Containers in Grant Town, Marion County, West Virginia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Notes on the record

DELIBERATELY LOW CONFIDENCE. The only evidence is a April 16, 2026 Times West Virginian report identifying two containers on the plant premises that appear to match the BIT-Ram Mighty POD, a 30-foot containerised mining unit, via Google satellite imagery and reverse image search. Counsel for AMBIT, the plant manager and owner Horizon Ventures all declined to comment or did not respond. The paper also reports AMBIT billed American Projects Development nearly $6 million in March 2026 for "640 MWh Power use" against a Mon Power PPA covering 80 MW. Context: the WV PSC rejected a 2021 to 22 American Bituminous proposal to exit its Mon Power contract in order to monetise the plant through cryptocurrency mining. No capacity is recorded, container counts are not a sourced megawatt figure. Do not promote this record's confidence without a named operator or a filing.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near Grant Town Power Plant Cryptocurrency Mining Containers?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the Grant Town Power Plant Cryptocurrency Mining Containers in Grant Town?

Nothing on record as of September 15, 2026. No lawsuit, organized opposition, or contested hearing over Grant Town Power Plant Cryptocurrency Mining Containers in Grant Town, Marion County, West Virginia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Grant Town Power Plant Cryptocurrency Mining Containers?

No lawsuit over Grant Town Power Plant Cryptocurrency Mining Containers appears in the record we track as of September 15, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Grant Town Power Plant Cryptocurrency Mining Containers use?

No water withdrawal figure for Grant Town Power Plant Cryptocurrency Mining Containers is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Grant Town Power Plant Cryptocurrency Mining Containers, and how big is it?

Undisclosed operator (Grant Town Power Plant site; plant operated by American Bituminous Power Partners for owner Horizon Ventures) is the operator on record. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "Grant Town Power Plant Cryptocurrency Mining Containers," updated September 15, 2026, https://suedatacenters.org/data-centers/grant-town-power-plant-crypto-mine-marion-county-wv.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/grant-town-power-plant-crypto-mine-marion-county-wv, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Grant Town Power Plant believed to be mining cryptocurrency in Marion County · Times West Virginian · retrieved September 15, 2026
  2. 2.Grant Town Power Plant, Global Energy Monitor (coordinates, 95.7 MW waste-coal unit, 2021 crypto conversion proposal) · Global Energy Monitor · retrieved September 15, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us