123NET Southfield DC1 is an operating data center in Southfield, Michigan (Oakland County), operated by 123NET.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
123NET
Facility type
Data center, AI use mixed
Location
24700 Northwestern Highway, Southfield, Oakland County, MI, 48075
Coordinates
42.4716, -83.2380 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
DTE Energy
Power source
Grid
Cooling
Not established
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over 123NET Southfield DC1 in Southfield, Oakland County, Michigan appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

123NET states DC1 is fed by a dedicated 20 MW DTE substation; the 20 MW figure is the utility feed, not measured IT load. As of October 2026, the operator's tech spec sheet for DC1 lists 16 MW of available utility power, also a utility figure rather than IT capacity

Operator states the expansion added both liquid-cooled and air-cooled infrastructure; the announcement does not describe the heat-rejection circuit, so the closed-loop-vs-evaporative question is unresolved. As of October 2026, the operator's tech spec sheet lists DC1 cooling as "Kyoto Wheel & Chilled Water" at 500 tons per floor without naming a heat-rejection method, so the cooling type stays unknown.

Notes on the record

Carrier-neutral colocation, home of the DET-iX Michigan internet exchange. Operator announcement dated 2025-09-24 (retrieved 2026-09-09) states a 4 MW expansion; that is the increment added, not a facility total, so it is not recorded as the facility's capacity. The announcement states liquid- and air-cooled capacity aimed at GPU clusters and AI inference, hence an AI classification of mixed use for a general-purpose colo that explicitly sells AI capacity. No investment, jobs, or incentive figures are stated. 123NET's own colocation page lists two further Southfield buildings, Southfield Data Center NW (DC2) at 24275 Northwestern Hwy and Southfield Data Center W (DC3) at 24245 Northwestern Hwy; as of October 2026 both are listed separately and are not covered here. Coordinates geocoded from the street address in the announcement; parcel not confirmed.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near 123NET Southfield DC1?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the 123NET Southfield DC1 data center in Southfield?

Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over 123NET Southfield DC1 in Southfield, Oakland County, Michigan appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the 123NET Southfield DC1 data center?

No lawsuit over 123NET Southfield DC1 appears in the record we track as of October 28, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does 123NET Southfield DC1 use?

No water withdrawal figure for 123NET Southfield DC1 is on record here. Cooling is recorded as unknown, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates 123NET Southfield DC1, and how big is it?

123NET is the operator on record. We hold 4 sites for that company across the registry. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "123NET Southfield DC1," updated October 28, 2026, https://suedatacenters.org/data-centers/123net-dc1-southfield-mi.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/123net-dc1-southfield-mi, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.123NET Expands Southfield Data Center to Power AI and High-Density Deployments · 123NET · retrieved September 10, 2026
  2. 2.PeeringDB facility registry API, record "123.NET - DC1 - 24700 Northwestern Hwy." registered by 123.Net, LLC., Southfield 48075 · PeeringDB · retrieved September 14, 2026
  3. 3.123NET, Data Center Colocation (DC1: 24700 Northwestern Hwy, 80,000 sq ft, dedicated 20 MW DTE substation, chilled water + Kyoto wheel cooling) · 123NET · retrieved September 21, 2026
  4. 4.123NET Data Center 1 tech site specs (PDF), cooling: Kyoto Wheel & Chilled Water, 500 tons per floor; available utility power 16 MW · 123NET · retrieved October 28, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us