123NET Southfield DC1

Southfield, Oakland County, Michigan · All 4 123NET sites

OperatingNo reception on recordAI mixed useRecord updated September 10, 2026

123NET Southfield DC1 is an operating data center in Southfield, Michigan (Oakland County), operated by 123NET. The public record puts it at 4 MW operating.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
123NET
Facility type
Data center, AI use mixed
Location
24700 Northwestern Highway, Southfield, Oakland County, MI
Coordinates
42.4716, -83.2380 (approximate)
Power capacity
4 MW operating
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Cooling
Not established
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over 123NET Southfield DC1 in Southfield, Oakland County, Michigan appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Operator states the expansion added both liquid-cooled and air-cooled infrastructure; the announcement does not describe the heat-rejection circuit, so the closed-loop-vs-evaporative question is unresolved.

Notes on the record

Carrier-neutral colocation, home of the DET-iX Michigan internet exchange. Operator announcement dated 2025-09-24 (retrieved 2026-09-09) states a 4 MW expansion; that is the increment added, not a facility total, so capacityMw is omitted rather than recorded as 4. The announcement states liquid- and air-cooled capacity aimed at GPU clusters and AI inference, hence aiClassification mixed_use for a general-purpose colo that explicitly sells AI capacity. No investment, jobs, or incentive figures are stated. 123NET's own site lists further Southfield buildings (DC2, DC3); those were not confirmed against a fetched operator page in this run and are therefore not proposed here. Coordinates geocoded from the street address in the announcement; parcel not confirmed.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the 123NET Southfield DC1 data center in Southfield?

Nothing on record as of September 10, 2026. No lawsuit, organized opposition, or contested hearing over 123NET Southfield DC1 in Southfield, Oakland County, Michigan appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the 123NET Southfield DC1 data center?

No lawsuit over 123NET Southfield DC1 appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does 123NET Southfield DC1 use?

No water withdrawal figure for 123NET Southfield DC1 is on record here. Cooling is recorded as unknown, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates 123NET Southfield DC1, and how big is it?

123NET is the operator on record. We hold 4 sites for that company across the registry. Capacity on record is 4 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "123NET Southfield DC1," updated September 10, 2026, https://suedatacenters.org/data-centers/123net-dc1-southfield-mi.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/123net-dc1-southfield-mi, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.123NET Expands Southfield Data Center to Power AI and High-Density Deployments · 123NET · retrieved September 9, 2026
  2. 2.123NET Expands Southfield Data Center to Power AI and High-Density Deployments · 123NET · retrieved September 10, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us