Facility record
Operating
- Operator
- 365 Data Centers
- Facility type
- Data center
- Location
- 24660 Lahser Road, Southfield, Oakland County, MI, 48034
- Coordinates
- 42.4692, -83.2605
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- On site generation
- 0.75 MW
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Opposition and litigation at this site
Nothing on record as of October 7, 2026. No lawsuit, organized opposition, or contested hearing over 365 Data Centers Detroit (DT1) in Southfield, Oakland County, Michigan appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
The 0.75 MW figure is a 750 kW on-site diesel generator for backup/emergency power only (per the operator's own spec sheet), not primary or supplemental grid generation.
Notes on the record
Standalone 12,000 sq ft colocation retrofit facility with a 160-ton cooling plant, 12-inch raised floor, and 3x203kW UPS units for AC customer backup (365datacenters.com spec sheet, retrieved 2026-09-13). A total facility power-capacity figure of ~4.5MW appears on third-party aggregator/broker sites (datacenterhawk, inflect) but had not been confirmed against a primary source as of September 2026, so no capacity is recorded. Coolant/water system details were not stated on the pages reviewed, so no water details are recorded. Originally built in 2000 as a Switch & Data facility, acquired by Equinix in 2010, and sold to 365 Data Centers in November 2012 (per baxtel.com).
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- 123NET Southfield DC1 · Southfield · 123NET1 mi · Operating
- 123NET Southfield DC2 (Southfield Data Center NW) · Southfield · 123NET1 mi · Operating
- 123NET Southfield DC3 (Southfield Data Center W) · Southfield · 123NET1 mi · Operating
- EdgeConneX DET01 · Detroit (Oakland County) · EdgeConneX1 mi · Operating
- Nexcess Southfield Data Center (21700 Melrose Ave) · Southfield · Nexcess (Liquid Web family of brands)2 mi · Operating
- Metrobloks Southfield Data Center · Southfield · Metrobloks2 mi · Permitted · 100 MW · Contested
- Liberty Center One Royal Oak Data Center · Royal Oak · Liberty Center One6 mi · Operating
- Cogent Troy Data Center (3331 W. Big Beaver Rd) · Troy · Cogent Communications7 mi · Operating
Questions people ask about this site
Is there opposition to the 365 Data Centers Detroit (DT1) data center in Southfield?
Nothing on record as of October 7, 2026. No lawsuit, organized opposition, or contested hearing over 365 Data Centers Detroit (DT1) in Southfield, Oakland County, Michigan appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the 365 Data Centers Detroit (DT1) data center?
No lawsuit over 365 Data Centers Detroit (DT1) appears in the record we track as of October 7, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does 365 Data Centers Detroit (DT1) use?
No water withdrawal figure for 365 Data Centers Detroit (DT1) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates 365 Data Centers Detroit (DT1), and how big is it?
365 Data Centers is the operator on record. We hold 11 sites for that company across the registry. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "365 Data Centers Detroit (DT1)," updated October 7, 2026, https://suedatacenters.org/data-centers/365-data-centers-dt1-southfield-mi.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/365-data-centers-dt1-southfield-mi, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Detroit Data Center - 365 Data Centers · 365 Data Centers · retrieved September 13, 2026
- 2.365 Detroit (DT1) Data Center · Baxtel · retrieved September 13, 2026
- 3.PeeringDB facility registry (Michigan): 365 Data Centers Detroit (DT1), fac 2021 · PeeringDB · retrieved October 7, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us