Data Center Registry
Nexcess Southfield Data Center (21700 Melrose Ave)
Southfield, Oakland County, Michigan
Nexcess Southfield Data Center (21700 Melrose Ave) is an operating data center in Southfield, Michigan (Oakland County), operated by Nexcess (Liquid Web family of brands).
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Nexcess (Liquid Web family of brands)
- Facility type
- Data center
- Location
- 21700 Melrose Avenue, Southfield, Oakland County, MI, 48075
- Coordinates
- 42.4473, -83.2563 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- April 14, 2016OperatingMetromode reported Nexcess's existing Southfield data center was nearing 60 percent usage as the company added two support facilities on Melrose Avenue. Source: Metromode
Opposition and litigation at this site
Nothing on record as of October 24, 2026. No lawsuit, organized opposition, or contested hearing over Nexcess Southfield Data Center (21700 Melrose Ave) in Southfield, Oakland County, Michigan appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Nexcess is a Southfield-based hosting company. Its 2016 expansion coverage says it operated data centers in Southfield and Dearborn. The street address comes from Baxtel's listing. Current ownership of the building was not verified independently; Nexcess now trades alongside Liquid Web and Servers.com. No MW figure is published. The Dearborn site (W. Outer Drive) was not added because its house number conflicts between directories.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- EdgeConneX DET01 · Detroit (Oakland County) · EdgeConneXunder 1 mile · Operating
- 365 Data Centers Detroit (DT1) · Southfield · 365 Data Centers2 mi · Operating
- 123NET Southfield DC3 (Southfield Data Center W) · Southfield · 123NET2 mi · Operating
- 123NET Southfield DC2 (Southfield Data Center NW) · Southfield · 123NET2 mi · Operating
- 123NET Southfield DC1 · Southfield · 123NET2 mi · Operating
- Metrobloks Southfield Data Center · Southfield · Metrobloks3 mi · Permitted · 100 MW · Contested
- Liberty Center One Royal Oak Data Center · Royal Oak · Liberty Center One7 mi · Operating
- Cogent Troy Data Center (3331 W. Big Beaver Rd) · Troy · Cogent Communications8 mi · Operating
Questions people ask about this site
Is there opposition to the Nexcess Southfield Data Center (21700 Melrose Ave) in Southfield?
Nothing on record as of October 24, 2026. No lawsuit, organized opposition, or contested hearing over Nexcess Southfield Data Center (21700 Melrose Ave) in Southfield, Oakland County, Michigan appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Nexcess Southfield Data Center (21700 Melrose Ave)?
No lawsuit over Nexcess Southfield Data Center (21700 Melrose Ave) appears in the record we track as of October 24, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Nexcess Southfield Data Center (21700 Melrose Ave) use?
No water withdrawal figure for Nexcess Southfield Data Center (21700 Melrose Ave) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Nexcess Southfield Data Center (21700 Melrose Ave), and how big is it?
Nexcess (Liquid Web family of brands) is the operator on record. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Nexcess Southfield Data Center (21700 Melrose Ave)," updated October 24, 2026, https://suedatacenters.org/data-centers/nexcess-southfield-melrose-mi.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/nexcess-southfield-melrose-mi, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Nexcess Southfield, 21700 Melrose Ave, Southfield (fully operational) · Baxtel · retrieved October 24, 2026
- 2.Nexcess adds two more data center support facilities in Southfield (April 14, 2016) · Metromode · retrieved October 24, 2026
- 3.OpenStreetMap/Nominatim geocode for 21700 Melrose Avenue, Southfield, MI · OpenStreetMap · retrieved October 24, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us