Dafter Township Bitcoin Mine

Dafter, Chippewa County, Michigan

OperatingIn litigationRecord updated September 9, 2026

Dafter Township Bitcoin Mine is an operating crypto mining site in Dafter, Michigan (Chippewa County), operated by Odessa Partners. The public record puts it at 10 acres. It is or has been the subject of litigation over its siting, permitting, or operation.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Odessa Partners
Facility type
Crypto mining
Location
Dafter, Chippewa County, MI
Coordinates
46.3600, -84.4273 (approximate)
Power capacity
Not established from a public source
Land
10 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Cloverland Electric Cooperative
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
In litigation
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. March 2025
    Operating
    Mine came online in Dafter Township, across the street from Lake Superior Academy. Source: Great Lakes Now (Detroit PBS)

Opposition and litigation at this site

Yes. Dafter Township Bitcoin Mine in Dafter, Chippewa County, Michigan is or has been the subject of litigation over its siting, permitting, or operation. Lake Superior Academy, a school directly across the street, filed suit in July 2025 seeking a preliminary injunction, noise reduction and at least $25,000 in damages; a judge issued a temporary restraining order requiring the mine to shut down during the litigation, and the parties were in mediation as of the source.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: in litigation means the facility is or has been the subject of a lawsuit related to its siting, permitting, or operation.

Lake Superior Academy, a school directly across the street, filed suit in July 2025 seeking a preliminary injunction, noise reduction and at least $25,000 in damages; a judge issued a temporary restraining order requiring the mine to shut down during the litigation, and the parties were in mediation as of the source. Sound readings reported above 70 decibels. The operator placed hay bales around the facility after the restraining order. Neighbouring Clark Township enacted a one-year moratorium on bitcoin mines.

Source: Great Lakes Now (Detroit PBS)

Power and water

Source states Cloverland Electric Cooperative supplies up to 50% hydroelectric power with the remainder purchased from Wisconsin Electric, generated from coal and natural gas. energy.source is recorded as 'grid' because the site is a utility customer, not an owner of generation.

Notes on the record

Six metal pods on 10 acres. Capacity: NO megawatt figure is stated in the source, capacityMw is omitted rather than estimated from pod count. Water use is NOT quantified either; residents raised concerns about water usage and chemical cooling agents but the source reports no measured figure, so the water field is omitted. No investment, jobs or incentive figures stated. ⚠️ COORDINATES ARE THE DAFTER TOWNSHIP CENTROID from Nominatim, not the site: the source locates the mine only as being in Dafter Township across the street from Lake Superior Academy, and no street address was obtainable in this run. Treat the pin as township-level. aiClassification omitted, the source describes bitcoin mining only, with no AI/GPU workload claim.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Questions people ask about this site

Is there opposition to the Dafter Township Bitcoin Mine in Dafter?

Yes. Dafter Township Bitcoin Mine in Dafter, Chippewa County, Michigan is or has been the subject of litigation over its siting, permitting, or operation. Lake Superior Academy, a school directly across the street, filed suit in July 2025 seeking a preliminary injunction, noise reduction and at least $25,000 in damages; a judge issued a temporary restraining order requiring the mine to shut down during the litigation, and the parties were in mediation as of the source.

Has anyone filed a lawsuit over the Dafter Township Bitcoin Mine?

Yes. This site is recorded as being in litigation. The case, the court, and the filings we hold are listed on this page under the timeline and the sources.

How much water does Dafter Township Bitcoin Mine use?

No water withdrawal figure for Dafter Township Bitcoin Mine is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Dafter Township Bitcoin Mine, and how big is it?

Odessa Partners is the operator on record. No capacity figure is on record for this site. The site is recorded at 10 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Dafter Township Bitcoin Mine," updated September 9, 2026, https://suedatacenters.org/data-centers/odessa-partners-dafter-township-mi.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/odessa-partners-dafter-township-mi, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.A bitcoin mine came to Michigan's Upper Peninsula, and Dafter Township isn't happy · Great Lakes Now (Detroit PBS) · retrieved September 9, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us