Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus)

Goodyear, Maricopa County, Arizona · All 6 Stream Data Centers sites

OperatingNo reception on recordAI likelyRecord updated August 31, 2026

Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus) is an operating data center in Goodyear, Arizona (Maricopa County), operated by Stream Data Centers. The public record puts it at 280 MW planned, 157 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Stream Data Centers
Facility type
Data center, AI use likely
Location
2950 South Litchfield Road, Goodyear, Maricopa County, AZ, 85338
Coordinates
33.4195, -112.3600
Power capacity
280 MW planned
Land
157 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
APS (Arizona Public Service)
Power source
Grid
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Nothing on record as of August 31, 2026. No lawsuit, organized opposition, or contested hearing over Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus) in Goodyear, Maricopa County, Arizona appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

Stream's January 2021 announcement of the Phoenix I commissioning describes a 350 MW on-site APS substation that Stream invested in, serving a five-building campus. As of July 2026, Stream's Phoenix page lists a dedicated on-site APS substation with an ultimate power capacity of 480 MW for the seven-building campus.

Site-specific case study states air-cooled chillers with a closed-loop water system, filled once and requiring no additional water; the operator explicitly rejected evaporative cooling as unsuitable for Metro Phoenix.

Notes on the record

Operator's own Phoenix page names this campus 'PHXA (Phoenix I-VII)' at 2950 S. Litchfield Road, Goodyear, AZ 85338, Maricopa County. 157-acre, 7-building planned campus; 2 of 7 buildings currently operational, remaining 5 under development, so campus-level status is mixed-build but the entity is live/operational overall. Site markets '100% AI-ready infrastructure' but, as of July 2026, no confirmed GPU/HPC tenant or workload was found, so the AI classification is marked likely rather than confirmed -- marketing language alone is not workload evidence. Note the official name differs from OSM tag 'PHX-1'; corrected to operator's own 'PHXA'. AI/HPC (likely): Stream's own Phoenix/Goodyear campus page carries a facility-specific '100% AI-Ready' key-stat badge alongside its 280 MW critical capacity.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus)?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus) in Goodyear?

Nothing on record as of August 31, 2026. No lawsuit, organized opposition, or contested hearing over Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus) in Goodyear, Maricopa County, Arizona appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus)?

No lawsuit over Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus) appears in the record we track as of August 31, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus) use?

No water withdrawal figure for Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus) is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus), and how big is it?

Stream Data Centers is the operator on record. We hold 6 sites for that company across the registry. Capacity on record is 280 MW. The site is recorded at 157 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus)," updated August 31, 2026, https://suedatacenters.org/data-centers/stream-data-centers-phxa-phoenix-i-vii-goodyear-campus-az.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/stream-data-centers-phxa-phoenix-i-vii-goodyear-campus-az, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Stream Data Centers - Phoenix/Goodyear locations page · Stream Data Centers · retrieved July 22, 2026
  2. 2.OpenStreetMap way/468707940 · OpenStreetMap · retrieved July 22, 2026
  3. 3.Stream Data Centers, "Booming in The Desert: Stream Commissions New Phoenix Data Center" · retrieved July 24, 2026
  4. 4.DataCenterDynamics, "Stream Data Centers opens Phoenix I facility in Goodyear, Arizona" · retrieved July 24, 2026
  5. 5.Stream Data Centers Goodyear campus case study, 'Evaporative cooling is not sustainable in Metro Phoenix, so our design uses air-cooled chillers with a closed-loop water system.' · retrieved August 31, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.