Sue Data Centers

Data Center Registry

Avondale Campus

Avondale, Maricopa County, Arizona · All 6 Prime Data Centers sites

Under constructionSupportedRecord updated September 10, 2026

Avondale Campus is a data center under construction in Avondale, Arizona (Maricopa County), operated by Prime Data Centers. The public record puts it at announced May 2026, 240 MW planned, 66.5 acres, a reported $3 billion investment. It has documented public support and no documented opposition.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Under construction

Operator
Prime Data Centers
Facility type
Data center
Location
Avondale, Maricopa County, AZ
Coordinates
33.4400, -112.3500 (approximate)
Power capacity
240 MW planned
Land
66.5 acres
Investment
$3 billion
Announced
May 2026
Utility
Salt River Project (SRP)
Power source
Grid
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Supported
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. May 2026
    Under construction
    Groundbreaking on first 3 buildings. Source: Prime Data Centers

Opposition and litigation at this site

Not that we can document. Local officials or residents have expressed public support for Avondale Campus in Avondale, Maricopa County, Arizona, and no opposition, petition, or lawsuit appears in the sources this registry tracks as of September 10, 2026. Avondale Mayor Mike Pineda is quoted (2026-05-21 release) praising the $3B+ investment and its closed-loop cooling design.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: supported means local officials or residents have expressed public support and no opposition is documented.

Avondale Mayor Mike Pineda is quoted (2026-05-21 release) praising the $3B+ investment and its closed-loop cooling design. No opposition, resident concerns, or hearing record documented in this source. Checked: operator press release only.

Source

Power and water

Operator specifies a closed-loop cooling system with zero process water use during operations. The City of Avondale restricts water-cooled data centers, considering only closed-loop, air-cooled facilities.

Notes on the record

5-building, 66.5-acre campus; groundbreaking on first 3 buildings May 2026.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Avondale Campus in Avondale?

Not that we can document. Local officials or residents have expressed public support for Avondale Campus in Avondale, Maricopa County, Arizona, and no opposition, petition, or lawsuit appears in the sources this registry tracks as of September 10, 2026. Avondale Mayor Mike Pineda is quoted (2026-05-21 release) praising the $3B+ investment and its closed-loop cooling design.

Has anyone filed a lawsuit over the Avondale Campus?

No lawsuit over Avondale Campus appears in the record we track as of September 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Avondale Campus use?

No water withdrawal figure for Avondale Campus is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Avondale Campus, and how big is it?

Prime Data Centers is the operator on record. We hold 6 sites for that company across the registry. Capacity on record is 240 MW. The site is recorded at 66.5 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Avondale Campus," updated September 10, 2026, https://suedatacenters.org/data-centers/prime-avondale-az.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/prime-avondale-az, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Prime Data Centers breaks ground on three buildings at its 240MW Phoenix campus, advancing $3 billion investment in Avondale · Prime Data Centers · retrieved July 17, 2026
  2. 2.Prime Data Centers PHX01 tech sheet, spec table: 'UTILITY PROVIDER SRP', 'ACRES 66.5', 'CRITICAL IT LOAD 240MW'; 'a closed-loop cooling system engineered for zero process water use during operations' · retrieved August 31, 2026
  3. 3.Prime Data Centers breaks ground on three buildings at its 240MW Phoenix campus · retrieved September 10, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation