BlockOps Moreland Bitcoin Mine is an operating crypto mining site in Moreland, Arkansas (Pope County), operated by BlockOps. It faces documented, organized local opposition.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
BlockOps
Facility type
Crypto mining
Location
Moreland, Pope County, AR
Coordinates
35.3639, -93.0013 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Opposed
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. 2026
    Operating
    BlockOps' own site and a 2025 city-council presentation both list Moreland among its operating Arkansas sites. Source: BlockOps Mining
  2. March 10, 2024
    Under construction
    KATV reported BlockOps, which already had a mine in Russellville, was establishing a site in Moreland directly across the street from Moreland First Baptist Church. Source: KATV

Opposition and litigation at this site

Yes. Organized local opposition to BlockOps Moreland Bitcoin Mine in Moreland, Pope County, Arkansas is documented in the public record, without a lawsuit on file in the sources we track. KATV reported that 'in the rural Pope County community of Moreland, not one but two cryptomines are setting up shop, much to the dismay of some locals,' and that 'Block Op's new site is even closer to Moreland First Baptist than Moreland Holding LLC's - directly across the street.' Church and community concerns centred on noise during Sunday services and on grid power draw; locals formed a committee protesting Act 851.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.

KATV reported that 'in the rural Pope County community of Moreland, not one but two cryptomines are setting up shop, much to the dismay of some locals,' and that 'Block Op's new site is even closer to Moreland First Baptist than Moreland Holding LLC's - directly across the street.' Church and community concerns centred on noise during Sunday services and on grid power draw; locals formed a committee protesting Act 851. Moreland has no planning commission or municipal government, so the sites faced little local oversight.

Source: KATV

Notes on the record

Coordinates are the OpenStreetMap point for Moreland First Baptist Church, the only landmark any source gives for this site ('directly across the street'); the pin is therefore the church, not the mine, and precision is approximate. This is a DIFFERENT site from moreland-holding-moreland-ar, which is a separate cryptomine in the same community under a different, reportedly Chinese-owned entity - KATV states plainly that two cryptomines were setting up in Moreland and distinguishes their distances from the church. The two records are deliberately given different pins so they are not conflated. No capacity, acreage or investment figure has been published for this site.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near BlockOps Moreland Bitcoin Mine?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the BlockOps Moreland Bitcoin Mine in Moreland?

Yes. Organized local opposition to BlockOps Moreland Bitcoin Mine in Moreland, Pope County, Arkansas is documented in the public record, without a lawsuit on file in the sources we track. KATV reported that 'in the rural Pope County community of Moreland, not one but two cryptomines are setting up shop, much to the dismay of some locals,' and that 'Block Op's new site is even closer to Moreland First Baptist than Moreland Holding LLC's - directly across the street.' Church and community concerns centred on noise during Sunday services and on grid power draw; locals formed a committee protesting Act 851.

Has anyone filed a lawsuit over the BlockOps Moreland Bitcoin Mine?

No lawsuit over BlockOps Moreland Bitcoin Mine appears in the record we track as of September 15, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does BlockOps Moreland Bitcoin Mine use?

No water withdrawal figure for BlockOps Moreland Bitcoin Mine is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates BlockOps Moreland Bitcoin Mine, and how big is it?

BlockOps is the operator on record. We hold 4 sites for that company across the registry. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "BlockOps Moreland Bitcoin Mine," updated September 15, 2026, https://suedatacenters.org/data-centers/blockops-moreland-ar.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/blockops-moreland-ar, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Two cryptomines unsettle quiet Moreland community, locals cry out for Act 851 repeal · KATV · retrieved September 15, 2026
  2. 2.Bitcoin-mining firm BlockOps presents plan to renovate Helena lumberyard, requests city approval · Citizen Portal · retrieved September 15, 2026
  3. 3.Bitcoin Mining Rural Arkansas: How BlockOps Is Transforming Communities in 2026 · BlockOps Mining · retrieved September 15, 2026
  4. 4.OpenStreetMap Nominatim geocode: Moreland First Baptist Church, Morgan Road, Pope County, Arkansas · OpenStreetMap · retrieved September 15, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us