Data Center Registry
Artemis Technologies Cave City Bitcoin Data Center
Cave City, Sharp County, Arkansas
Artemis Technologies Cave City Bitcoin Data Center is a crypto mining site under construction in Cave City, Arkansas (Sharp County), operated by Artemis Technologies. The public record puts it at announced 2025. It faces documented, organized local opposition.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Under construction
- Operator
- Artemis Technologies
- Facility type
- Crypto mining
- Location
- Cave City, Sharp County, AR
- Coordinates
- 35.9481, -91.5508 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- 2025
- Utility
- Not established from a public source
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Opposed
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Yes. Organized local opposition to Artemis Technologies Cave City Bitcoin Data Center in Cave City, Sharp County, Arkansas is documented in the public record, without a lawsuit on file in the sources we track.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: opposed means documented, organized local opposition is the dominant signal on record.
Notes on the record
Air-cooled, indoor 'Bitcoin Data Center' on a reported 3-acre site adjoining Cave City limits; described by local press as Artemis Technologies' third Arkansas location (after unverified sites in Monticello and Newark, see held). A contentious April 2025 public meeting at Cave City High School drew pushback after Artemis and an Entergy representative declined to disclose power-draw figures; Sharp County Judge Mark Counts publicly opposed the project. Exact MW and construction-completion status not disclosed in available sourcing, flag for re-check.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Questions people ask about this site
Is there opposition to the Artemis Technologies Cave City Bitcoin Data Center in Cave City?
Yes. Organized local opposition to Artemis Technologies Cave City Bitcoin Data Center in Cave City, Sharp County, Arkansas is documented in the public record, without a lawsuit on file in the sources we track.
Has anyone filed a lawsuit over the Artemis Technologies Cave City Bitcoin Data Center?
No lawsuit over Artemis Technologies Cave City Bitcoin Data Center appears in the record we track as of August 5, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Artemis Technologies Cave City Bitcoin Data Center use?
No water withdrawal figure for Artemis Technologies Cave City Bitcoin Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Artemis Technologies Cave City Bitcoin Data Center, and how big is it?
Artemis Technologies is the operator on record. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "Artemis Technologies Cave City Bitcoin Data Center," updated August 5, 2026, https://suedatacenters.org/data-centers/artemis-technologies-cave-city-ar.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/artemis-technologies-cave-city-ar, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Cave City citizens push back on cryptomine being built near their town · KATV · retrieved August 5, 2026
- 2.There goes the neighborhood? Data center draws fire from Cave City residents · White River Now · retrieved August 5, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us