Data Center Registry
Iron Mountain DEN-1 Denver Data Center
Denver, Denver County, Colorado · All 2 Iron Mountain Data Centers sites
Iron Mountain DEN-1 Denver Data Center is an operating data center in Denver, Colorado (Denver County), operated by Iron Mountain Data Centers. The public record puts it at 14.4 MW operating, 6 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Iron Mountain Data Centers
- Facility type
- Data center
- Location
- 4300 Brighton Boulevard, Denver, Denver County, CO, 80216
- Coordinates
- 39.7774, -104.9696
- Power capacity
- 14.4 MW operating
- Land
- 6 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Xcel Energy
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- August 26, 2026OperatingFacility listed as commissioned and in operation. Source: datacenterHawk
Opposition and litigation at this site
Nothing on record as of August 26, 2026. No lawsuit, organized opposition, or contested hearing over Iron Mountain DEN-1 Denver Data Center in Denver, Denver County, Colorado appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Dual-feed utility power from Xcel Energy; operator reports 100% matched renewable energy.
Notes on the record
About 180,000 sq ft (113,000 sq ft of IT space) and 14.4 MW on a 6-acre campus in the Elyria-Swansea industrial area, in a retrofitted 1946 building. Uptime Tier III-certified construction; operator cites a 1.2 PUE. Roughly half a mile from the CoreSite DE3 site but a separate operator and parcel.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Flexential Denver - Downtown (Champa) · Denver · Flexential3 mi · Operating
- CoreSite DE3 · Denver · CoreSite3 mi · Under construction · 60 MW · Contested
- Flexential Denver - Aurora (DEN03) · Aurora · Flexential10 mi · Operating
- H5 Data Centers Denver (Denver Tech Center campus) · Greenwood Village · H5 Data Centers12 mi · Operating · 17.5 MW
- Vantage Data Centers CO21 Campus (Building 3) · Aurora · Vantage Data Centers13 mi · Proposed
- QTS Aurora-Denver Data Center Campus (DEN1) · Aurora · QTS Data Centers14 mi · Under construction · 177 MW · Mixed reception
- Flexential Denver - Centennial (DEN05) · Centennial · Flexential14 mi · Operating
- DataBank DEN5, Centennial II · Centennial · DataBank14 mi · Operating · 16 MW
Questions people ask about this site
Is there opposition to the Iron Mountain DEN-1 Denver Data Center in Denver?
Nothing on record as of August 26, 2026. No lawsuit, organized opposition, or contested hearing over Iron Mountain DEN-1 Denver Data Center in Denver, Denver County, Colorado appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Iron Mountain DEN-1 Denver Data Center?
No lawsuit over Iron Mountain DEN-1 Denver Data Center appears in the record we track as of August 26, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Iron Mountain DEN-1 Denver Data Center use?
No water withdrawal figure for Iron Mountain DEN-1 Denver Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Iron Mountain DEN-1 Denver Data Center, and how big is it?
Iron Mountain Data Centers is the operator on record. We hold 2 sites for that company across the registry. Capacity on record is 14.4 MW. The site is recorded at 6 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Iron Mountain DEN-1 Denver Data Center," updated August 26, 2026, https://suedatacenters.org/data-centers/iron-mountain-den1-denver-co.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/iron-mountain-den1-denver-co, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Denver Data Center (DEN-1) solution guide · Iron Mountain · retrieved August 26, 2026
- 2.Iron Mountain Data Centers DEN-1, 4300 Brighton Boulevard · datacenterHawk · retrieved August 26, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us