Data Center Registry
H5 Data Centers Denver (Denver Tech Center campus)
Greenwood Village, Arapahoe County, Colorado · All 12 H5 Data Centers sites
H5 Data Centers Denver (Denver Tech Center campus) is an operating data center in Greenwood Village, Colorado (Arapahoe County), operated by H5 Data Centers. The public record puts it at 17.5 MW operating, 12 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- H5 Data Centers
- Facility type
- Data center
- Location
- 5350 S Valentia Way, Greenwood Village, Arapahoe County, CO
- Coordinates
- 39.6168, -104.8917 (approximate)
- Power capacity
- 17.5 MW operating
- Land
- 12 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Xcel Energy
- Power source
- Grid
- On site generation
- 0.4 MW
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Opposition and litigation at this site
Nothing on record as of September 13, 2026. No lawsuit, organized opposition, or contested hearing over H5 Data Centers Denver (Denver Tech Center campus) in Greenwood Village, Arapahoe County, Colorado appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
400 kW rooftop solar array supplements Xcel Energy grid power to reduce peak demand costs.
Notes on the record
Two independent Tier III, concurrently maintainable buildings totaling 300,000 sq ft on a 12-acre campus in the Denver Tech Center; N+1 backup generators with 48-hour diesel runtime, 24/7 on-site staffing. Marketed as Denver's only wholesale colocation facility with ~15 years at 100% uptime. Water/cooling-circuit type not stated in either operator page checked (2026-09-13), omitted rather than guessed.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- DataBank DEN5, Centennial II · Centennial · DataBank3 mi · Operating · 16 MW
- Flexential Denver - Centennial (DEN05) · Centennial · Flexential3 mi · Operating
- Flexential Denver - Aurora (DEN03) · Aurora · Flexential4 mi · Operating
- Flexential Denver - Englewood · Englewood · Flexential5 mi · Operating · 18 MW
- Flexential Parker (Compark) · Parker · Flexential6 mi · Under construction · 22.5 MW · Supported
- CoreSite DE3 · Denver · CoreSite10 mi · Under construction · 60 MW · Contested
- Flexential Denver - Downtown (Champa) · Denver · Flexential10 mi · Operating
- QTS Aurora-Denver Data Center Campus (DEN1) · Aurora · QTS Data Centers11 mi · Under construction · 177 MW · Mixed reception
Questions people ask about this site
Is there opposition to the H5 Data Centers Denver (Denver Tech Center campus) in Greenwood Village?
Nothing on record as of September 13, 2026. No lawsuit, organized opposition, or contested hearing over H5 Data Centers Denver (Denver Tech Center campus) in Greenwood Village, Arapahoe County, Colorado appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the H5 Data Centers Denver (Denver Tech Center campus)?
No lawsuit over H5 Data Centers Denver (Denver Tech Center campus) appears in the record we track as of September 13, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does H5 Data Centers Denver (Denver Tech Center campus) use?
No water withdrawal figure for H5 Data Centers Denver (Denver Tech Center campus) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates H5 Data Centers Denver (Denver Tech Center campus), and how big is it?
H5 Data Centers is the operator on record. We hold 12 sites for that company across the registry. Capacity on record is 17.5 MW. The site is recorded at 12 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "H5 Data Centers Denver (Denver Tech Center campus)," updated September 13, 2026, https://suedatacenters.org/data-centers/h5-denver-greenwood-village-co.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/h5-denver-greenwood-village-co, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Denver Data Center - H5 Data Centers · H5 Data Centers · retrieved September 13, 2026
- 2.Denver Colocation - H5 Data Centers · H5 Data Centers · retrieved September 13, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us