H5 Data Centers Denver (Denver Tech Center campus)

Greenwood Village, Arapahoe County, Colorado · All 17 H5 Data Centers sites

OperatingNo reception on recordRecord updated October 28, 2026

H5 Data Centers Denver (Denver Tech Center campus) is an operating data center in Greenwood Village, Colorado (Arapahoe County), operated by H5 Data Centers. The public record puts it at 12 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
H5 Data Centers
Facility type
Data center
Location
5350 S Valentia Way, Greenwood Village, Arapahoe County, CO, 80111
Coordinates
39.6168, -104.8917 (approximate)
Power capacity
Not established from a public source
Land
12 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Xcel Energy
Power source
Grid
On site generation
0.4 MW
Cooling
Evaporative
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over H5 Data Centers Denver (Denver Tech Center campus) in Greenwood Village, Arapahoe County, Colorado appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

400 kW rooftop solar array supplements Xcel Energy grid power to reduce peak demand costs, per the operator's colocation page; its data center page instead says on-site solar "producing up to 460 kW". The recorded figure follows the colocation page's stated array size.

Notes on the record

Two independent Tier III, concurrently maintainable buildings totaling 300,000 sq ft on a 12-acre campus in the Denver Tech Center; N+1 backup generators with 48-hour diesel runtime, 24/7 on-site staffing. Marketed as Denver's only wholesale colocation facility with ~15 years at 100% uptime. The operator's Denver data center page lists N+1 chillers, N+1 cooling towers and N+20% CRAHs; the cooling is classified as evaporative because the heat-rejection path includes cooling towers. As of October 2026, neither operator page gives a water figure. The operator's colocation page says Xcel Energy provides the facility with "over 17.5 MWs of reliable and affordable power"; that is a utility supply figure, not IT capacity, so no operational capacity is recorded.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • How the community has received it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near H5 Data Centers Denver (Denver Tech Center campus)?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the H5 Data Centers Denver (Denver Tech Center campus) in Greenwood Village?

Nothing on record as of October 28, 2026. No lawsuit, organized opposition, or contested hearing over H5 Data Centers Denver (Denver Tech Center campus) in Greenwood Village, Arapahoe County, Colorado appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the H5 Data Centers Denver (Denver Tech Center campus)?

No lawsuit over H5 Data Centers Denver (Denver Tech Center campus) appears in the record we track as of October 28, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does H5 Data Centers Denver (Denver Tech Center campus) use?

No water withdrawal figure for H5 Data Centers Denver (Denver Tech Center campus) is on record here. Cooling is recorded as evaporative, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates H5 Data Centers Denver (Denver Tech Center campus), and how big is it?

H5 Data Centers is the operator on record. We hold 17 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 12 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "H5 Data Centers Denver (Denver Tech Center campus)," updated October 28, 2026, https://suedatacenters.org/data-centers/h5-denver-greenwood-village-co.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/h5-denver-greenwood-village-co, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Denver Data Center - H5 Data Centers · H5 Data Centers · retrieved September 21, 2026
  2. 2.Denver Colocation - H5 Data Centers · H5 Data Centers · retrieved September 13, 2026
  3. 3.PeeringDB facility records, Colorado (H5 Data Centers Denver) · PeeringDB · retrieved October 19, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us