Aligned DFW-01

Plano, Collin County, Texas · All 22 Aligned Data Centers sites

OperatingNo reception on recordAI likelyRecord updated September 1, 2026

Aligned DFW-01 is an operating data center in Plano, Texas (Collin County), operated by Aligned Data Centers. The public record puts it at 60 MW operating.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Aligned Data Centers
Facility type
Data center, AI use likely
Location
Plano, Collin County, TX
Coordinates
33.0093, -96.6766
Power capacity
60 MW operating
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Oncor Electric Delivery
Power source
Grid
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Nothing on record as of September 1, 2026. No lawsuit, organized opposition, or contested hearing over Aligned DFW-01 in Plano, Collin County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Aligned's DFW-01/DFW-02 campus in Plano (28000 Summit Avenue, 46 MW at full build) sits within Oncor's T&D service territory covering central/eastern/southern Plano. No facility-specific statement names Oncor directly, and no dedicated on-site generation or renewable PPA was found. The utility is inferred from service-territory geography, it is not a sourced claim about this facility.

Notes on the record

Confirmed operational on Aligned's Dallas directory page; address 2800 Summit Ave, Plano, TX 75074. AI/HPC (likely): Dallas DFW-01: Aligned DeltaFlow/Delta3 high-density AI/HPC platform.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Aligned DFW-01 data center in Plano?

Nothing on record as of September 1, 2026. No lawsuit, organized opposition, or contested hearing over Aligned DFW-01 in Plano, Collin County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Aligned DFW-01 data center?

No lawsuit over Aligned DFW-01 appears in the record we track as of September 1, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Aligned DFW-01 use?

No water withdrawal figure for Aligned DFW-01 is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Aligned DFW-01, and how big is it?

Aligned Data Centers is the operator on record. We hold 22 sites for that company across the registry. Capacity on record is 60 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Aligned DFW-01," updated September 1, 2026, https://suedatacenters.org/data-centers/aligned-dfw-01-tx.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/aligned-dfw-01-tx, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Aligned facility directory · Aligned · retrieved July 22, 2026
  2. 2.OpenStreetMap way/483286527 · OpenStreetMap · retrieved July 22, 2026
  3. 3.baxtel, Aligned Plano Data Center · Baxtel · retrieved July 24, 2026
  4. 4.baxtel, Aligned Plano Data Center · Baxtel · retrieved August 16, 2026
  5. 5.Aligned facility directory · Aligned · retrieved September 1, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us