Barrio Energy Tyler Data Center (West Erwin Street)
Tyler, Smith County, Texas
Barrio Energy Tyler Data Center (West Erwin Street) is a proposed crypto mining site in Tyler, Texas (Smith County), operated by Barrio Energy / Barrio Resources LLC (with Vulcan Core). The public record puts it at announced June 17, 2026, 12 MW planned. It is or has been the subject of litigation over its siting, permitting, or operation.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Barrio Energy / Barrio Resources LLC (with Vulcan Core)
- Facility type
- Crypto mining
- Location
- 1101 to 1105 West Erwin Street, Tyler, Smith County, TX
- Coordinates
- 32.3510, -95.3127 (approximate)
- Power capacity
- 12 MW planned
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- June 17, 2026
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- In litigation
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 3, 2026ProposedZoning Board of Adjustment rejected Barrio's appeal as untimely; litigation/appeal path ongoing.
Opposition and litigation at this site
Yes. Barrio Energy Tyler Data Center (West Erwin Street) in Tyler, Smith County, Texas is or has been the subject of litigation over its siting, permitting, or operation. Tyler's Planning & Zoning Commission denied Barrio's special-use permit in July 2026; the Zoning Board of Adjustment unanimously rejected a separate, untimely-filed Barrio appeal on 2026-09-03.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: in litigation means the facility is or has been the subject of a lawsuit related to its siting, permitting, or operation.
Tyler's Planning & Zoning Commission denied Barrio's special-use permit in July 2026; the Zoning Board of Adjustment unanimously rejected a separate, untimely-filed Barrio appeal on 2026-09-03. A timely-filed appeal of the original P&Z denial remains on hold, and Barrio has a 10-day window to seek state-court review. Residents cited noise, heat discharge, water/cooling chemicals, and property-value concerns.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Questions people ask about this site
Is there opposition to the Barrio Energy Tyler Data Center (West Erwin Street) in Tyler?
Yes. Barrio Energy Tyler Data Center (West Erwin Street) in Tyler, Smith County, Texas is or has been the subject of litigation over its siting, permitting, or operation. Tyler's Planning & Zoning Commission denied Barrio's special-use permit in July 2026; the Zoning Board of Adjustment unanimously rejected a separate, untimely-filed Barrio appeal on 2026-09-03.
Has anyone filed a lawsuit over the Barrio Energy Tyler Data Center (West Erwin Street)?
Yes. This site is recorded as being in litigation. The case, the court, and the filings we hold are listed on this page under the timeline and the sources.
How much water does Barrio Energy Tyler Data Center (West Erwin Street) use?
No water withdrawal figure for Barrio Energy Tyler Data Center (West Erwin Street) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Barrio Energy Tyler Data Center (West Erwin Street), and how big is it?
Barrio Energy / Barrio Resources LLC (with Vulcan Core) is the operator on record. Capacity on record is 12 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Barrio Energy Tyler Data Center (West Erwin Street)," updated September 8, 2026, https://suedatacenters.org/data-centers/barrio-energy-tyler-smith-county-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/barrio-energy-tyler-smith-county-tx, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Data center developer addresses concerns about proposed Bitcoin mining facility in Tyler · Tyler Morning Telegraph · retrieved September 8, 2026
- 2.Proposed Tyler cryptocurrency mining center denied again · KLTV · retrieved September 8, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us