Fort Spunky

Hood County, Texas · All 2 Pacifico Energy sites

ProposedIn litigationAI likelyRecord updated July 26, 2026

Fort Spunky is a proposed data center in Texas (Hood County), operated by Pacifico Energy. The public record puts it at 100 MW planned, 862 acres. It is or has been the subject of litigation over its siting, permitting, or operation.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Pacifico Energy
Facility type
Data center, AI use likely
Location
Hood County, TX
Coordinates
32.4200, -97.7800
Power capacity
100 MW planned
Land
862 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
In litigation
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. March 2026
    Proposed
    Concept plan was approved, then revoked by county commissioners 3-2 in March 2026; developer has since filed a lawsuit against the county. Source: Texas Tribune

Opposition and litigation at this site

Yes. Fort Spunky in Hood County, Texas is or has been the subject of litigation over its siting, permitting, or operation. Approval revoked and now contested via developer lawsuit against Hood County.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: in litigation means the facility is or has been the subject of a lawsuit related to its siting, permitting, or operation.

Approval revoked and now contested via developer lawsuit against Hood County.

Source: Texas Tribune

Power and water

IMPORTANT CORRECTION: Pacifico Energy's famous 5-7.65GW off-grid gas project ('GW Ranch') is a DIFFERENT, DISTINCT project located in Pecos County, TX, not this site.

Notes on the record

862 acres, across the Brazos River from the Pecan Plantation community. Water draw up to 20,000 gal/day. Coordinates are approximate.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Fort Spunky data center in Hood County, Texas?

Yes. Fort Spunky in Hood County, Texas is or has been the subject of litigation over its siting, permitting, or operation. Approval revoked and now contested via developer lawsuit against Hood County.

Has anyone filed a lawsuit over the Fort Spunky data center?

Yes. This site is recorded as being in litigation. The case, the court, and the filings we hold are listed on this page under the timeline and the sources.

How much water does Fort Spunky use?

No water withdrawal figure for Fort Spunky is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Fort Spunky, and how big is it?

Pacifico Energy is the operator on record. We hold 2 sites for that company across the registry. Capacity on record is 100 MW. The site is recorded at 862 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Fort Spunky," updated July 26, 2026, https://suedatacenters.org/data-centers/fort-spunky-pacifico-energy-hood-county-tx.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/fort-spunky-pacifico-energy-hood-county-tx, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Texas data centers: Hood County, local control, rural water and power · Texas Tribune · retrieved July 9, 2026
  2. 2.KBTX: Eight data centers threaten to transform this small Texas county (Fort Spunky name, 862 acres, 100MW grid request, water-permit lawsuit) · retrieved July 24, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us