Project Patriot (Knox Ranch)
Granbury, Hood County, Texas
Project Patriot (Knox Ranch) is a proposed data center in Granbury, Texas (Hood County), operated by Bilateral Energy LLC. The public record puts it at 2,100 acres. It is or has been the subject of litigation over its siting, permitting, or operation.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Bilateral Energy LLC
- Facility type
- Data center
- Location
- 2801 W US Hwy 377, Granbury, Hood County, TX
- Coordinates
- 32.4427, -97.7871 (approximate)
- Power capacity
- Not established from a public source
- Land
- 2,100 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Power source
- On site gas
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- In litigation
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- October 14, 2026ProposedRezoning approved. The project faces litigation and is listed as 'In Doubt'. Source: Baxtel
Opposition and litigation at this site
Yes. Project Patriot (Knox Ranch) in Granbury, Hood County, Texas is or has been the subject of litigation over its siting, permitting, or operation. The city approved the rezoning, but residents sued city officials alleging procedural and open-meeting violations.
How the community has taken it
Reception is a sourced signal, not an editorial judgment: in litigation means the facility is or has been the subject of a lawsuit related to its siting, permitting, or operation.
The city approved the rezoning, but residents sued city officials alleging procedural and open-meeting violations. The listing describes the project as effectively frozen while litigation proceeds.
Power and water
Co-located natural gas plant ('Granbury OpCo 1 station') for independent generation.
Notes on the record
An HPC/AI data center and power campus. A tracker's 1,200 MW figure is not corroborated and is omitted. Distinct from MARA's Granbury (Wolf Hollow) site, Comanche Circle and Fort Spunky. Coordinates are the Granbury city point.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Our reporting on this site
- The Granbury Noise Lawsuits · Active litigation
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- MARA Granbury Facility · Granbury · MARA Holdingsunder 1 mile · Operating · 300 MW · In litigation
- Big Digital Energy-10NetZero Hood County AI Data Center Campus · Big Digital Energy, Inc. / 10NetZero, Inc. (50/50 joint venture)1 mi · Proposed · 311 MW
- Fort Spunky · Pacifico Energy2 mi · Proposed · 100 MW · In litigation
- Comanche Circle · Tolar · Sailfish Digital Ventures (SDV)7 mi · Proposed · Contested
- AWS Project Spectrum (Somervell/Hood County) · Amazon Data Services, Inc.14 mi · Proposed
Questions people ask about this site
Is there opposition to the Project Patriot (Knox Ranch) data center in Granbury?
Yes. Project Patriot (Knox Ranch) in Granbury, Hood County, Texas is or has been the subject of litigation over its siting, permitting, or operation. The city approved the rezoning, but residents sued city officials alleging procedural and open-meeting violations.
Has anyone filed a lawsuit over the Project Patriot (Knox Ranch) data center?
Yes. This site is recorded as being in litigation. The case, the court, and the filings we hold are listed on this page under the timeline and the sources.
How much water does Project Patriot (Knox Ranch) use?
No water withdrawal figure for Project Patriot (Knox Ranch) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Project Patriot (Knox Ranch), and how big is it?
Bilateral Energy LLC is the operator on record. No capacity figure is on record for this site. The site is recorded at 2100 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Project Patriot (Knox Ranch)," updated October 14, 2026, https://suedatacenters.org/data-centers/bilateral-energy-project-patriot-granbury-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/bilateral-energy-project-patriot-granbury-tx, retrieved October 29, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Bilateral Energy: Project Patriot · Baxtel · retrieved October 14, 2026
- 2.OpenStreetMap Nominatim geocode: Granbury, TX · OpenStreetMap contributors · retrieved October 14, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us