Sue Data Centers

Data Center Registry

Flexential Dallas - Plano

Plano, Collin County, Texas · All 46 Flexential sites

OperatingNo reception on recordAI confirmedRecord updated July 24, 2026

Flexential Dallas - Plano is an operating data center in Plano, Texas (Collin County), operated by Flexential. The public record puts it at 13 MW operating.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Flexential
Facility type
Data center, AI use confirmed
Location
Plano, Collin County, TX
Coordinates
33.0070, -96.6664
Power capacity
13 MW operating
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Oncor
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Nothing on record as of July 24, 2026. No lawsuit, organized opposition, or contested hearing over Flexential Dallas - Plano in Plano, Collin County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Power and water

Former ViaWest/Peak10 facility (built 2016) with Oncor as the listed utility provider. Features 29 MW of redundant diesel backup generation capacity, but this is standby/backup capacity, not a defining behind-the-meter on-site generation arrangement. Standard grid-served colocation.

Notes on the record

Gen 4, 261,400+ sqft, up to 80kW+/cabinet liquid cooling - distinct site from Richardson. AI/HPC (confirmed): CoreWeave 13MW liquid-cooled high-density GPU deployment, up to 80kW/rack.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Flexential Dallas - Plano data center in Plano?

Nothing on record as of July 24, 2026. No lawsuit, organized opposition, or contested hearing over Flexential Dallas - Plano in Plano, Collin County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Flexential Dallas - Plano data center?

No lawsuit over Flexential Dallas - Plano appears in the record we track as of July 24, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Flexential Dallas - Plano use?

No water withdrawal figure for Flexential Dallas - Plano is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Flexential Dallas - Plano, and how big is it?

Flexential is the operator on record. We hold 46 sites for that company across the registry. Capacity on record is 13 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Flexential Dallas - Plano," updated July 24, 2026, https://suedatacenters.org/data-centers/flexential-dallas-plano-tx.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/flexential-dallas-plano-tx, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Flexential facility directory · Flexential · retrieved July 22, 2026
  2. 2.OpenStreetMap way/650412346 · OpenStreetMap · retrieved July 22, 2026
  3. 3.Flexential AI/HPC, CoreWeave 13MW liquid-cooled high-density GPU deployment, up to 80kW/r · datacenterdynamics.com · retrieved July 23, 2026
  4. 4.Flexential Dallas-Plano specs, datacentermap.com · retrieved July 24, 2026
  5. 5.DCF Tours: Flexential Dallas-Plano Data Center, 18 MW Colocation Facility · retrieved July 24, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us