Facility record

Operating

Operator
Cerebras Systems
Facility type
Data center, AI use confirmed
Location
Oklahoma City, Oklahoma County, OK
Coordinates
35.4676, -97.5164
Power capacity
10 MW operating
Land
Not established from a public source
Investment
Not established from a public source
Announced
2025
Utility
OG&E
Power source
Grid
Cooling
Closed loop
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Supported
Source confidence
Confirmed by multiple independent sources or official documentation

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. September 2025
    Operating
    Ribbon cutting September 22, 2025; 10 MW facility with 300+ CS-3 wafer-scale systems confirmed online Source: Cerebras Systems
  2. 2025
    Proposed
    Cerebras announced six new AI datacenters including OKC; Scale Datacenters selected as host colo; 300+ CS-3 systems expected online by June 2025 Source: Data Center Frontier

Opposition and litigation at this site

Not that we can document. Local officials or residents have expressed public support for Cerebras Oklahoma City Data Center in Oklahoma City, Oklahoma County, Oklahoma, and no opposition, petition, or lawsuit appears in the sources this registry tracks as of July 7, 2026. Cerebras reports workforce development partnerships with local colleges and technical programs; 'hundreds of good-paying jobs' in engineering, IT, and operations noted on official blog.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: supported means local officials or residents have expressed public support and no opposition is documented.

Cerebras reports workforce development partnerships with local colleges and technical programs; 'hundreds of good-paying jobs' in engineering, IT, and operations noted on official blog. No public opposition or contention reported in any source reviewed.

Source: Cerebras Systems

Power and water

Every kWh matched with renewable energy (REC-based offset; no on-site generation disclosed). OG&E (Oklahoma Gas and Electric) reported as serving utility, consistent with OKC service territory; not explicitly named in Cerebras primary sources but cited in secondary coverage.

Direct-to-chip liquid cooling via closed-loop system; Cerebras describes it as minimizing water consumption. Custom water-cooling solution designed for CS-3 wafer-scale servers. No mgd figure disclosed.

Notes on the record

Colocation tenancy: Cerebras Systems is the AI infrastructure operator; Scale Datacenters is the facility host/colo provider (acquired the 82,000 sq ft building from Expand Energy, formerly Chesapeake Energy, originally built ~2013). Facility address: 512 NW 62nd St (corner of NW 61st/62nd St and N Lee Ave), Oklahoma City. Ribbon cutting September 22, 2025. Houses 300+ CS-3 Wafer Scale Engine systems delivering 44+ exaflops of AI compute. Facility features Tier III-quality infrastructure, tornado and seismic shielding, triple-redundant power stations. Cerebras matches all kWh consumption with renewable energy (REC-based, not on-site generation). OG&E reported as grid utility, consistent with OKC service territory but not explicitly named in Cerebras primary sources. Investment amount not disclosed. Jobs: Cerebras blog references 'hundreds of good-paying jobs' in engineering, IT, and operations plus local college workforce partnerships, no firm headcount confirmed. Coordinates are approximate (dispatch seed); actual facility is at 512 NW 62nd St.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the Cerebras Oklahoma City Data Center in Oklahoma City?

Not that we can document. Local officials or residents have expressed public support for Cerebras Oklahoma City Data Center in Oklahoma City, Oklahoma County, Oklahoma, and no opposition, petition, or lawsuit appears in the sources this registry tracks as of July 7, 2026. Cerebras reports workforce development partnerships with local colleges and technical programs; 'hundreds of good-paying jobs' in engineering, IT, and operations noted on official blog.

Has anyone filed a lawsuit over the Cerebras Oklahoma City Data Center?

No lawsuit over Cerebras Oklahoma City Data Center appears in the record we track as of July 7, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Cerebras Oklahoma City Data Center use?

No water withdrawal figure for Cerebras Oklahoma City Data Center is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Cerebras Oklahoma City Data Center, and how big is it?

Cerebras Systems is the operator on record. Capacity on record is 10 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "Cerebras Oklahoma City Data Center," updated July 7, 2026, https://suedatacenters.org/data-centers/cerebras-oklahoma-city-ok.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/cerebras-oklahoma-city-ok, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Cerebras Unveils Six Data Centers to Meet Accelerating Demand for AI Inference at Scale · Data Center Frontier · retrieved July 7, 2026
  2. 2.Cerebras Announces Six New AI Datacenters Across North America and Europe · Cerebras Systems · retrieved July 7, 2026
  3. 3.Cerebras OKC Data Center, Official Blog · Cerebras Systems · retrieved July 7, 2026
  4. 4.Cerebras Opens 10MW Data Center in Oklahoma City · Data Center Dynamics · retrieved July 7, 2026
  5. 5.Cerebras: Oklahoma City Data Center, Baxtel Profile · Baxtel · retrieved July 7, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us